Southwest touts ‘iconic’ Maple rental complex
May 2nd, 2014
BILL POWER BUSINESS REPORTER

Quote:

Southwest Properties Ltd. has started construction of a 21-storey residential complex called Maple at 1583 Hollis St.

In a couple of years some lucky downtown Halifax residents will be able to hop into a cab, say “Maple, please,” and be on their way home.

But wait a minute, Maple

residents will already be within walking distance of home from anywhere in the central business district. So they won’t need a cab to get to the 21-storey, multi-use complex being built by Southwest Properties Ltd. at 1583 Hollis St.

Southwest chairman and CEO Jim Spatz announced the name of the complex Friday at a construction-start celebration at the site of the former Bank of Commerce building.

Maple is scheduled for completion in the spring of 2016.

...
Read More: thechronicleherald.ca

----------------------------------------

Great to hear construction has begun on the largest residential building in "Central Downtown". This alone will provide a big boost to the downtown area let alone all of the other construction zones taking over the area right now.
Reply With Quote
     
     
  #302  
Old Posted May 3, 2014, 4:50 AM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by Dmajackson View Post
Great to hear construction has begun on the largest residential building in "Central Downtown". This alone will provide a big boost to the downtown area let alone all of the other construction zones taking over the area right now.
Yeah I definitely agree. It looks like Halifax is waking up and really moving forward development-wise. Pretty soon your height limits should be lifted, I hope.
Reply With Quote
     
     
  #303  
Old Posted May 3, 2014, 5:37 AM
counterfactual counterfactual is offline
Registered User
 
Join Date: Jul 2013
Location: Parts Unknown
Posts: 1,796
Quote:
Originally Posted by scryer View Post
Yeah I definitely agree. It looks like Halifax is waking up and really moving forward development-wise. Pretty soon your height limits should be lifted, I hope.
Unfortunately, not likely. We definitely have some great progress right now and some great downtown developments, but each of these faced strong opposition, not were a sure bet for approval.

Anything over 5 storeys in Halifax is still a battle royal to get approved. An extremely small but well funded minority oppose these developments and anything downtown with any sort of height.
Reply With Quote
     
     
  #304  
Old Posted May 3, 2014, 10:39 AM
ns_kid's Avatar
ns_kid ns_kid is offline
Registered User
 
Join Date: Sep 2013
Posts: 550
Quote:
“People are getting tired of 30- and 40-minute commutes and want to live closer to where they work,” Gordon Laing, president and chief operating officer at Southwest, said in an interview.
I'm thrilled that Southwest is demonstrating such confidence in the downtown residential market. And, seriously, I will seriously consider becoming one of their tenants. I do see a certain irony in Mr. Laing's remarks, however. For as these residential complexes move to downtown, they are supplanting the very workplaces to which he refers. The Maple replaces six floors of office space; the Ralston next door, 10 floors, will be vacated and likely demolished; the Roy, and the Royal Bank building are other examples. New office space is being constructed and on the drawing board of course but there's no doubt that many business tenants continue to leave downtown for the suburbs. To maintain the viability of the downtown core it will be critical to maintain a good balance between commercial and residential space.

Quote:
“The Maple is an iconic symbol of Canada and we felt the name Maple for the new building commemorates the building that was here for about 60 years,” Spatz said.
Writer Power then informs us that the former building was the "Bank of Commerce", which makes no sense whatsoever. Of course it was the Bank of Canada building. This is the quality of business writing -- not to mention proofreading -- in the Halifax press. God help us.
Reply With Quote
     
     
  #305  
Old Posted May 3, 2014, 7:04 PM
someone123's Avatar
someone123 someone123 is online now
hähnchenbrüstfiletstüc
 
Join Date: Nov 2001
Location: Vancouver
Posts: 35,908
Quote:
Originally Posted by ns_kid View Post
To maintain the viability of the downtown core it will be critical to maintain a good balance between commercial and residential space.
It's also good to keep some older, more affordable office buildings around so that the downtown can support a wider range of tenants. This doesn't seem to be happening. In Halifax, the same few blocks have been redeveloped again and again since the 1800's for the city's prime office buildings.

This particular project is great though. I think the bigger local population will make a big difference to Barrington Street, both in terms of vibrancy from the new foot traffic and from the increased demand for shops and services.
Reply With Quote
     
     
  #306  
Old Posted May 3, 2014, 8:29 PM
someone123's Avatar
someone123 someone123 is online now
hähnchenbrüstfiletstüc
 
Join Date: Nov 2001
Location: Vancouver
Posts: 35,908
Does anybody have a sense of how much excavation remains for this project? Did the Bank of Canada building go far below Hollis, or will they have to carve out a couple more levels for the underground parking? I wonder how long it will take to get a crane up?

I'm going to be in town in a few weeks so hopefully there will be something interesting to see here!
Reply With Quote
     
     
  #307  
Old Posted May 3, 2014, 9:14 PM
counterfactual counterfactual is offline
Registered User
 
Join Date: Jul 2013
Location: Parts Unknown
Posts: 1,796
Quote:
Originally Posted by ns_kid View Post
I'm thrilled that Southwest is demonstrating such confidence in the downtown residential market. And, seriously, I will seriously consider becoming one of their tenants. I do see a certain irony in Mr. Laing's remarks, however. For as these residential complexes move to downtown, they are supplanting the very workplaces to which he refers. The Maple replaces six floors of office space; the Ralston next door, 10 floors, will be vacated and likely demolished; the Roy, and the Royal Bank building are other examples. New office space is being constructed and on the drawing board of course but there's no doubt that many business tenants continue to leave downtown for the suburbs. To maintain the viability of the downtown core it will be critical to maintain a good balance between commercial and residential space.
Quote:
Originally Posted by someone123 View Post
It's also good to keep some older, more affordable office buildings around so that the downtown can support a wider range of tenants. This doesn't seem to be happening. In Halifax, the same few blocks have been redeveloped again and again since the 1800's for the city's prime office buildings.

This particular project is great though. I think the bigger local population will make a big difference to Barrington Street, both in terms of vibrancy from the new foot traffic and from the increased demand for shops and services.
Guys, guys, guys. There is plenty of office space around. Nothing is being displaced. We're already at record commercial and office space vacancy rates, it'll hit even higher historical vacancy levels again when TD & Commerce Square developments finish and go online.

We're *finally* getting some quality dense residential downtown, and we're lamenting some crappy vacant office spaces?

We need MORE residential. More. More. More. Commercial will come once you have residential population in there, as will retail. Businesses go where the people are. But it doesn't always work the other way; as we've seen and learned.

We don't need any more 1970s style office spaces downtown, plenty of which seem to be vacant right now, because they cost far too much compared to brand new, nice, office space being built out in the sprawl parks. Rather, we need brand new Triple A class office / commercial space to attract anchor tenants. When that happens, the 70's style space will reduce in price, attracting different kinds of businesses into those spaces.

Residential begins a happy cycle. But when you lose density and population-- as the peninsula has since the 1950's-- you begin an unhappy cycle of decline. Finally, residential may turn that cycle around.
Reply With Quote
     
     
  #308  
Old Posted May 4, 2014, 12:06 AM
Keith P.'s Avatar
Keith P. Keith P. is offline
Registered User
 
Join Date: Mar 2006
Posts: 8,856
Quote:
Originally Posted by someone123 View Post
Does anybody have a sense of how much excavation remains for this project? Did the Bank of Canada building go far below Hollis, or will they have to carve out a couple more levels for the underground parking? I wonder how long it will take to get a crane up?

I'm going to be in town in a few weeks so hopefully there will be something interesting to see here!
I don't know how much excavation they will be doing, because the demo isn't finished yet. I was at the event yesterday and they still had a pair of large excavators jackhammering away at the old basement. I guess it was part of the vault. Anyway, they were only down about 1 level below grade as you could see them from Hollis Street. I expect they will need to go down well beyond where they are now.
Reply With Quote
     
     
  #309  
Old Posted May 4, 2014, 3:11 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by someone123 View Post
Does anybody have a sense of how much excavation remains for this project? Did the Bank of Canada building go far below Hollis, or will they have to carve out a couple more levels for the underground parking? I wonder how long it will take to get a crane up?

I'm going to be in town in a few weeks so hopefully there will be something interesting to see here!
From this document - http://www.halifax.ca/boardscom/drc/documents/19148Report.pdf - they have to excavate 13.75 meters (45 feet) below Hollis Street and about 10.5 meters (35 feet) on the harbour side. So the average depth is about 40 feet. Also from the published diagrams, they have to excavate an area of 71.7 meters (235 feet) by 36.23 meters (119 feet). Comparing the average excavation depth (about 75%-80%) and area (about 29%) to the Nova Centre excavation (using this Nova Centre document - http://www.halifax.ca/municipalclerk/documents/18708SiteandBuildingPlansandImagesoftheProposal.pdf) I estimate that they have to excavate about 22% to 23% of the total volume of fill for 1583 Hollis Street as compared to the Nova Centre. However, this is ignoring the size of the pit that will exist after the Bank of Canada demolition is complete.

I think your question pertains to how much excavation already exists under the Bank of Canada building. It looks like the new building will take up at least three times the area of the old Bank of Canada building so a significant amount of excavation will remain after demolition is complete. The ground under the Bank of Canada site might be easier to unearth than at the Nova Centre site. I wonder where the fill will be dumped (Bedford or King's Wharf?).

Last edited by fenwick16; May 4, 2014 at 8:03 PM.
Reply With Quote
     
     
  #310  
Old Posted May 8, 2014, 4:16 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722


Yep - might as well blog this one too..
buildingthemaple.tumblr.com/
Reply With Quote
     
     
  #311  
Old Posted May 8, 2014, 6:57 PM
bluenoser's Avatar
bluenoser bluenoser is offline
hi
 
Join Date: Mar 2006
Posts: 630
Great news, thanks Ziobrop. I really appreciate your construction blogs.
Reply With Quote
     
     
  #312  
Old Posted Jun 20, 2014, 3:51 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
any news on this? i believe it was pending approvals?
So far it looks like they have done some geotechnical work, but thats it.

From June 6 http://buildingthemaple.tumblr.com/:
Reply With Quote
     
     
  #313  
Old Posted Jul 2, 2014, 4:15 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
The shoring around the excavation is about to be installed. This Drill arrived on site, and will drill down to bedrock, which they will anchor the H pile into.

Photo from http://buildingthemaple.tumblr.com/

Reply With Quote
     
     
  #314  
Old Posted Jul 3, 2014, 12:13 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Ziobrop View Post
The shoring around the excavation is about to be installed. This Drill arrived on site, and will drill down to bedrock, which they will anchor the H pile into.

Photo from http://buildingthemaple.tumblr.com/

http://38.media.tumblr.com/8b6343562685982dfda715f73e88e290/tumblr_n83ebbiTa21tbpqjpo1_500.jpg


It is great to see that there are new construction/excavation pictures on your tumblr page.
Reply With Quote
     
     
  #315  
Old Posted Jul 18, 2014, 5:16 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
looks like the H piles are almost all in, and the drill to do the horizontal tie backs is on site.

More Better Photos at http://buildingthemaple.tumblr.com/

BTW, Click on the ads sometimes, it will help fund my insurance costs for...

Reply With Quote
     
     
  #316  
Old Posted Aug 28, 2014, 5:50 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
They seem to be moving alot of dirt around.. Dont know if qualifies as digging the hole yet..
From http://maple.builthalifax.ca/
Reply With Quote
     
     
  #317  
Old Posted Sep 2, 2014, 6:13 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722


word is blasting starts this week..
From http://maple.builthalifax.ca/
Reply With Quote
     
     
  #318  
Old Posted Sep 11, 2014, 2:58 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
blasting has begun - twice daily at 11 and 3
From http://maple.builthalifax.ca/
Reply With Quote
     
     
  #319  
Old Posted Oct 3, 2014, 1:43 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
hole is progressing. they blasted the area, and are now removing all the material. I assume they will then blast again.

From http://maple.builthalifax.ca/
Reply With Quote
     
     
  #320  
Old Posted Oct 3, 2014, 6:40 PM
kph06's Avatar
kph06 kph06 is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,103
This project now has a webcam:


Webcam
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 7:35 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.