based on a conversation in another thread, I thought I would create a map of the TTC network today, funded, and future.
Yellow = Subway line
Thick Blue = Grade Separated LRT line
Thin Blue = Surface LRT line
Red = Streetcar line with its own right of way
Today: Queens Quay streetcar line shut down for reconstruction. SRT on last legs. Union station second platform just opened.
Tomorrow: (well, 2023ish) Spadina subway, Scarborough subway, Small new streetcar ROWs (Queensway ROW extended slightly due to a track rebuild, new Cherry street line), Eglinton LRT, Sheppard LRT, Finch LRT. Total cost to upgrade network to this from today: roughly $14.5 billion.
Future: This is what I feel will be funded with the $15 billion GTA fund that was in the spring budget. This isn't formal yet as Metrolinx still has to decide on what exactly to build, but this would provide the biggest bang for the buck in Toronto and just so happens to be politically appealing subways. Included is the Yonge line extension by 2 stops to Steeles to provide a better end of the line crossover to allow for higher frequencies, and the DRL. Total cost: roughly $4 billion.