  #601  
Old Posted Sep 4, 2014, 2:10 PM
OldDartmouthMark OldDartmouthMark is online now
Registered User
 
Join Date: May 2010
Posts: 10,541
Quote:
Originally Posted by Ziobrop View Post
tieing down the Vogue Building
photos from http://theroy.builthalifax.ca/
Drill

Insert Tieback


then Grout, tension, and bolt.

also heard starfish is trying to buy the little Mysteries building, current owner apparently doubled his price.
I'm guessing that stone foundation is part of the old Roy building? How does this tying down process work?

They sure don't build them like that anymore... can't help but imagine the hard work put in by the original builders as that would all have been done by hand.

Also, I noticed all the mortar on the face of the Vogue's bricks. It almost looks to me as they were trying to "glue" the walls together with mortar during the building process, or maybe it was just that the excess mortar couldn't be wiped due to the proximity of the Roy as they were laying bricks for the Vogue (D'Allard) building.

Great photos - thanks for sharing them with us!

Wondering if there has been any archeaological activity going on at the site? I'm sure below the Roy's foundation there would be a high chance of finding some 19th century (or earlier) artifacts.
Reply With Quote
     
     
  #602  
Old Posted Sep 4, 2014, 6:15 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by OldDartmouthMark View Post
I'm guessing that stone foundation is part of the old Roy building? How does this tying down process work?

They sure don't build them like that anymore... can't help but imagine the hard work put in by the original builders as that would all have been done by hand.

Also, I noticed all the mortar on the face of the Vogue's bricks. It almost looks to me as they were trying to "glue" the walls together with mortar during the building process, or maybe it was just that the excess mortar couldn't be wiped due to the proximity of the Roy as they were laying bricks for the Vogue (D'Allard) building.

Great photos - thanks for sharing them with us!

Wondering if there has been any archeaological activity going on at the site? I'm sure below the Roy's foundation there would be a high chance of finding some 19th century (or earlier) artifacts.
i have a post coming on tiebacks on Builthalifax - its half written.
Basicly, you drill a hole, put the tieback in, grout it in place, then tension it with a hydrulic jack, and bolt a plate on. the tieback then anchors everything into the rock bellow.

there was an archeologist on site - he said they did boreholes, and found 2 voids. they were just soil - the rest of the roy sits right on bedrock.

as for the mortar - i believe its excess. it was all cleaned of the Johnston building, before it was re-parged on the shared wall.
Reply With Quote
     
     
  #603  
Old Posted Sep 4, 2014, 6:22 PM
OldDartmouthMark OldDartmouthMark is online now
Registered User
 
Join Date: May 2010
Posts: 10,541
Quote:
Originally Posted by Ziobrop View Post
i have a post coming on tiebacks on Builthalifax - its half written.
Basicly, you drill a hole, put the tieback in, grout it in place, then tension it with a hydrulic jack, and bolt a plate on. the tieback then anchors everything into the rock bellow.

there was an archeologist on site - he said they did boreholes, and found 2 voids. they were just soil - the rest of the roy sits right on bedrock.

as for the mortar - i believe its excess. it was all cleaned of the Johnston building, before it was re-parged on the shared wall.
Thanks! Looking forward to your post.

Really appreciate your info on this. As much as it pains me to see the building torn down, the info gained from its deconstruction gives us a window into building techniques of the past that would otherwise not be seen.
Reply With Quote
     
     
  #604  
Old Posted Sep 4, 2014, 7:13 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by OldDartmouthMark View Post
Thanks! Looking forward to your post.

Really appreciate your info on this. As much as it pains me to see the building torn down, the info gained from its deconstruction gives us a window into building techniques of the past that would otherwise not be seen.
Here we go:
http://halifaxbloggers.ca/builthalifax/2014/09/digging-a-foundation/
expect it to expand/ be reworked.

I need to rework my concrete post - I have better non spanning slab photos.
http://halifaxbloggers.ca/builthalifax/2014/06/the-quick-guide-to-concrete-construction/
Reply With Quote
     
     
  #605  
Old Posted Sep 4, 2014, 7:21 PM
OldDartmouthMark OldDartmouthMark is online now
Registered User
 
Join Date: May 2010
Posts: 10,541
Quote:
Originally Posted by Ziobrop View Post
Here we go:
http://halifaxbloggers.ca/builthalifax/2014/09/digging-a-foundation/
expect it to expand/ be reworked.

I need to rework my concrete post - I have better non spanning slab photos.
http://halifaxbloggers.ca/builthalifax/2014/06/the-quick-guide-to-concrete-construction/
Excellent! Thanks!
Reply With Quote
     
     
  #606  
Old Posted Sep 28, 2014, 2:12 AM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
does anyone know when the DA Was signed? going through the thread, it was approved by council in may 2011, and expires in 3 years if construction of the parking levels hasent started, and if building permits arnt issued.

i was told they still don't have a general contractor (bird, elis don, PCL etc)chosen, and am thinking they dont have a lot of time left to get a hole dug and something started.
Reply With Quote
     
     
  #607  
Old Posted Sep 28, 2014, 3:36 PM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by Ziobrop View Post
does anyone know when the DA Was signed? going through the thread, it was approved by council in may 2011, and expires in 3 years if construction of the parking levels hasent started, and if building permits arnt issued.

i was told they still don't have a general contractor (bird, elis don, PCL etc)chosen, and am thinking they dont have a lot of time left to get a hole dug and something started.

Reading through the original Development Agreement (DA) for this project, it requires that construction must begin within 3 years of the date of registration of the Agreement at the Registry of Deeds or Land Registry Office - http://www.halifax.ca/boardscom/Dist12PAC/documents/RoyBuildingReport.pdf . Often the DA say that a project must start 3 years from the signing of the development agreement whereas this one is worded slightly differently. Does anyone know how to check to see when the agreement was registered at the Registry of Deeds or Land Registry Office?
Reply With Quote
     
     
  #608  
Old Posted Sep 28, 2014, 5:30 PM
counterfactual counterfactual is offline
Registered User
 
Join Date: Jul 2013
Location: Parts Unknown
Posts: 1,796
Quote:
Originally Posted by fenwick16 View Post
Reading through the original Development Agreement (DA) for this project, it requires that construction must begin within 3 years of the date of registration of the Agreement at the Registry of Deeds or Land Registry Office - http://www.halifax.ca/boardscom/Dist12PAC/documents/RoyBuildingReport.pdf . Often the DA say that a project must start 3 years from the signing of the development agreement whereas this one is worded slightly differently. Does anyone know how to check to see when the agreement was registered at the Registry of Deeds or Land Registry Office?
Reznick just registered it last week!

(I'm joking. I don't know).
Reply With Quote
     
     
  #609  
Old Posted Sep 28, 2014, 8:02 PM
hokus83 hokus83 is offline
Registered User
 
Join Date: Apr 2013
Posts: 284
Do pre sales count? they seem really serious about this project I find it hard to believe they would just let the deadline slide and have this be scrapped .

And are you sure a general contractor haven't been hired yet. I've seen 6 or 7 people in construction outfits onsite in the last few days standing around talking.
Reply With Quote
     
     
  #610  
Old Posted Sep 28, 2014, 9:08 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by hokus83 View Post
Do pre sales count? they seem really serious about this project I find it hard to believe they would just let the deadline slide and have this be scrapped .

And are you sure a general contractor haven't been hired yet. I've seen 6 or 7 people in construction outfits onsite in the last few days standing around talking.
I have a good source. As of Friday nothing was awarded.
Reply With Quote
     
     
  #611  
Old Posted Sep 29, 2014, 12:11 PM
IanWatson IanWatson is offline
Registered User
 
Join Date: Feb 2013
Posts: 1,425
Signed October 20th, 2011 and registered October 28th, 2011
Reply With Quote
     
     
  #612  
Old Posted Sep 29, 2014, 12:27 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by IanWatson View Post
Signed October 20th, 2011 and registered October 28th, 2011
so if i understand the DA Correctly they have until October 28th to get permits, dig a hole and pour a footing.. or ask for an extension.

i don't think they have enough time... without an extension.
Reply With Quote
     
     
  #613  
Old Posted Sep 29, 2014, 1:12 PM
JET JET is online now
Registered User
 
Join Date: Feb 2007
Posts: 2,059
Quote:
Originally Posted by Ziobrop View Post
so if i understand the DA Correctly they have until October 28th to get permits, dig a hole and pour a footing.. or ask for an extension.

i don't think they have enough time... without an extension.
Wouldn't the three Moes, with a couple of shovels, meet the start criteria? also, it shouldn't take them very long.
Reply With Quote
     
     
  #614  
Old Posted Sep 29, 2014, 1:15 PM
Keith P.'s Avatar
Keith P. Keith P. is offline
Registered User
 
Join Date: Mar 2006
Posts: 8,902
Quote:
Originally Posted by JET View Post
Wouldn't the three Moes, with a couple of shovels, meet the start criteria, also it shouldn't take them very long.
It's the Five Guys Named Moe, and they are all busy not finishing the Q Loft condos.
Reply With Quote
     
     
  #615  
Old Posted Sep 29, 2014, 1:26 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
Quote:
Originally Posted by JET View Post
Wouldn't the three Moes, with a couple of shovels, meet the start criteria? also, it shouldn't take them very long.
the DA reads start construction on the parking level. I guess technically starting the hole is Starting construction, though nothing is actually built...

I haven't seen new drawings either for the building, since the 2011 proposal.
Reply With Quote
     
     
  #616  
Old Posted Sep 29, 2014, 2:10 PM
JET JET is online now
Registered User
 
Join Date: Feb 2007
Posts: 2,059
Quote:
Originally Posted by Keith P. View Post
It's the Five Guys Named Moe, and they are all busy not finishing the Q Loft condos.
Too bad that they are 'busy' at Q; with five of them they'd be able to dig a pretty good hole, given a little bit of time.
Reply With Quote
     
     
  #617  
Old Posted Sep 29, 2014, 2:12 PM
Drybrain Drybrain is offline
Registered User
 
Join Date: Sep 2012
Posts: 4,568
The DA says "commencement of development shall mean the installation of the founding for the building."

But am I to understand from comments here that while they had a demolition permit for the original building, they didn't have a permit to begin construction on the new one, which is the cause for concern? That issuing permits will take too long for the Oct 28th deadline to be met?

(Anyway, I have to agree that while I'm curious as to what's going on, I find it pretty unlikely they'd take such a deliberate and circuitous route to get to this point, only to "Whoops, DA expired. Oh well." Maybe it's just ego: They assume, probably correctly that the city isn't going to deny them an extension of the agreement if they ask for it, especially now that the original Roy is gone.)
Reply With Quote
     
     
  #618  
Old Posted Sep 29, 2014, 2:55 PM
OldDartmouthMark OldDartmouthMark is online now
Registered User
 
Join Date: May 2010
Posts: 10,541
So if the old DA expires, what does that mean? A new DA has to be approved? Perhaps one where there is no longer a requirement for original materials to be used in the new façade, since it was "accidentally" disposed of?

I dunno, it all sounds a little strange to me. I'm sure there is a good explanation.
Reply With Quote
     
     
  #619  
Old Posted Sep 29, 2014, 3:50 PM
halifaxboyns halifaxboyns is offline
Registered User
 
Join Date: Feb 2010
Location: Planet earth
Posts: 3,883
I thought there was an extension of the DA? I remember there being a decision by Council to do so and wasn't it appealed by our friends at the HT? Or was it one of the dt developer?
Reply With Quote
     
     
  #620  
Old Posted Sep 29, 2014, 4:38 PM
Ziobrop's Avatar
Ziobrop Ziobrop is offline
armchairitect
 
Join Date: Mar 2013
Location: Halifax
Posts: 722
im not aware of an extension - and starfish explicitly wrote a letter against extending the DA for the discovery center - basically saying they were ready to go, and it would be unfair if they stalled for 2 more years.

Both these projects are PRE HRMxD. therefore if the DA Expires, they have to start over from scratch.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 9:46 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.