Quote:
Originally Posted by jb1969
I didn't realize while looking at the website in the past that they have eliminated the floors with 4, with the exception of the 40s. So the top floor is advertise as 61
|
The floors are still there, they just label them differently, but I understand what you meant and yes they do that in many buildings now for a well-discussed off-topic reason.
As for digging the holes at the same time, I would imagine they will be digging the hole for the entire project including tower 2 at somewhat the same time seeing as it was mentioned tower 2 is supposed to be completed only 6 months after the first. I'd imagine excavation will go similar to Park Avenue out in Surrey where they start at the first tower site and dig it out progressively moving to the other location. Right now they have the tower crane up and hole complete for tower 1 Park Avenue but are not 100% complete with the digging at the second tower site. It will be about 6 months behind.
Same deal here. They start near tower 1 and as it is digging out slowly move towards the tower 2 site. When site 1 is dug out, start base, get crane up, and start foundation as they complete digging site 2. Staggered by about 6 months.