Brighouse is "Richmond" (as in Richmond Centre).
The max travel time from Richmond to Waterfront is 30 min in section 1.2.1.1
Quote:
Originally Posted by aberdeen5698
And if I'm reading that table correctly,
given that the frequency for Brighouse is stated as 7.5 minutes it appears that a 2:1 ratio has already been agreed to.
|
Yes, the frequency interval [headway] for Richmond-Waterfront is max 7.5 min in Peak.
The frequency interval [headway] for YVR-Waterfront is max 15 min in Peak.
So ultimately, the table allows a 2:1 ratio in Peak at the slowest headways (with room to vary at higher frequencies),
but the ratio must even out early morning and late evening (at the slowest headways).
The "
Combined Bridgeport-Waterfront" is for the current configuration with the wye facing south.
- 2 routes - Richmond-Waterfront and Airport-Waterfront with the overlap/combined being Bridgeport-Waterfront.
The "
Combined Bridgeport-Airport" is for the theoretical configuration with a
Airport-Richmond route.
See the requirement at the end of Section 1.1.6. for through running from Airport to Richmond.
So in addition to there being combined service on Bridgeport-Waterfront, service on Airport-Bridgeport would also be combined
from 2 routes that overlap/combined being Bridgeport-Waterfront, but the max interval of 7.5 min means that
it would only be implemented if there is high train frequency / demand.