HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #12481  
Old Posted Sep 11, 2014, 9:03 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,797
Quote:
Originally Posted by officedweller View Post
Yup - YVR contributed $300 million or so to the line and imposed a travel time maximum of 24 minutes (I think) to downtown.
Is that really just travel time or is it travel time plus average or worst-case wait for the next available train to depart YVR station?
     
     
  #12482  
Old Posted Sep 11, 2014, 10:28 PM
spm2013 spm2013 is offline
More Towers
 
Join Date: Jan 2013
Posts: 2,312
Maximum train travel times during peak period of 25 minutes and 15 minute train intervals for Airport-Waterfront:

http://www.translink.ca/~/media/Document...greements/YVR%20Funding%20Agreement.ashx

Last edited by spm2013; Sep 12, 2014 at 12:17 AM.
     
     
  #12483  
Old Posted Sep 11, 2014, 11:59 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
Yeah, in Schedule E, section 1.2.12, the maximum travel time is 25 minutes, not interval.


http://www.translink.ca/~/media/Document...greements/YVR%20Funding%20Agreement.ashx
     
     
  #12484  
Old Posted Sep 12, 2014, 12:17 AM
spm2013 spm2013 is offline
More Towers
 
Join Date: Jan 2013
Posts: 2,312
Sorry miswrote on my reply, edited.
     
     
  #12485  
Old Posted Sep 12, 2014, 1:01 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,797
Quote:
Originally Posted by officedweller View Post
Yeah, in Schedule E, section 1.2.12, the maximum travel time is 25 minutes, not interval.
It appears that the travel time is irrelevant if what we're discussing is the ratio of trains going to YVR vs. Brighouse. From the looks of the agreement, the only relevant factor in that discussion is the requirement to have trains at 15-minute intervals. And if I'm reading that table correctly, given that the frequency for Brighouse is stated as 7.5 minutes it appears that a 2:1 ratio has already been agreed to.
     
     
  #12486  
Old Posted Sep 12, 2014, 2:49 AM
spm2013 spm2013 is offline
More Towers
 
Join Date: Jan 2013
Posts: 2,312
There's no Brighouse in that table, it's Bridgeport.
     
     
  #12487  
Old Posted Sep 12, 2014, 3:08 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
Brighouse is "Richmond" (as in Richmond Centre).

The max travel time from Richmond to Waterfront is 30 min in section 1.2.1.1

Quote:
Originally Posted by aberdeen5698 View Post
And if I'm reading that table correctly,
given that the frequency for Brighouse is stated as 7.5 minutes it appears that a 2:1 ratio has already been agreed to.
Yes, the frequency interval [headway] for Richmond-Waterfront is max 7.5 min in Peak.
The frequency interval [headway] for YVR-Waterfront is max 15 min in Peak.
So ultimately, the table allows a 2:1 ratio in Peak at the slowest headways (with room to vary at higher frequencies),
but the ratio must even out early morning and late evening (at the slowest headways).

The "Combined Bridgeport-Waterfront" is for the current configuration with the wye facing south.
- 2 routes - Richmond-Waterfront and Airport-Waterfront with the overlap/combined being Bridgeport-Waterfront.

The "Combined Bridgeport-Airport" is for the theoretical configuration with a Airport-Richmond route.
See the requirement at the end of Section 1.1.6. for through running from Airport to Richmond.
So in addition to there being combined service on Bridgeport-Waterfront, service on Airport-Bridgeport would also be combined
from 2 routes that overlap/combined being Bridgeport-Waterfront, but the max interval of 7.5 min means that
it would only be implemented if there is high train frequency / demand.

Last edited by officedweller; Sep 12, 2014 at 3:33 AM.
     
     
  #12488  
Old Posted Sep 12, 2014, 6:12 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,119
So... you're essentially looking at max 5 minute frequencies at all times of the day if you were going to go with a 2:1 ratio.

What's more likely is a 2:1 ratio during rush, switching back to a 1:1 off-peak

During rush (20 tph one-way):
Vancouver: 3 minute interval
Richmond : 3 or 6 minute interval
Airport : 9 minute interval

Off peak (12 tph one-way):
Vancouver 5 minute interval
Richmond: 10 minute interval
Airport: 10 minute interval.
     
     
  #12489  
Old Posted Sep 12, 2014, 7:03 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
Remember that that implied ratio above is just at the slowest headways.
As long as the YVR headway is not more than 7.5 minutes, the Richmond leg could run as often as you can run them.

That's according to the parameters noted above. There could be a "ratio" clause elsewhere in the agreement.
     
     
  #12490  
Old Posted Sep 12, 2014, 7:06 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,684
More trains! As always, that's the answer.
     
     
  #12491  
Old Posted Sep 12, 2014, 8:36 PM
st7860 st7860 is offline
BANNED
 
Join Date: Nov 2010
Posts: 1,299
https://ca.finance.yahoo.com/photos/worl...=X3oDMTBhdnVpNmo3BGxhbmcDZW4tQ0E-;_ylv=3

Vancouver
Vancouver's SkyTrain is a light rapid transit system in Metro Vancouver, British Columbia, Canada. SkyTrain has 68.7 km (42.7 mi) of track and uses fully automated trains on grade-separated tracks, running mostly on elevated guideways, which gives passengers views across the city and helps SkyTrain to hold consistently high (over 95%) on-time reliability.
     
     
  #12492  
Old Posted Sep 12, 2014, 10:50 PM
logicbomb logicbomb is offline
Joshua B.
 
Join Date: Sep 2010
Posts: 1,215
Oh Translink....First they cut 555 midday and evening service down to every 30 min. Now the 156 ST stop has opened, and there are A LOT of riders using this stop. The 337 is making requested stops near the 555 stop, and a lot of riders from Fraser Heights are opting to take the 555.

The end result? Security were present at Carvolth Exchange this morning to restrict the number of passengers that can board there so there is some room left to allow boardings at 156 ST. Passengers at Carvolth are being forced to wait behind.

Translink will need to up frequencies to every 5 min during peak-hours or put artics on the route. The lineup at Braid was horrendous on Wednesday. A near 2 bus wait.
     
     
  #12493  
Old Posted Sep 12, 2014, 11:45 PM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Nanaimo Station has lots of scaffolding / hoarding up. Looks like they are painting all the grids and trusses.

Also, One of the 130 busses never showed at Metrotown station. This led to people getting passed up on the first stops on the leg, even though they'd been waiting a long time. There were at least 7 people at Crystal Mall on Willingdon that were passed up.
I know there are eventual plans for 130 to be a B-line... it can't happen soon enough. Though I agree the 555 is more pressing at the moment.
     
     
  #12494  
Old Posted Sep 13, 2014, 12:00 AM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by logicbomb View Post
Oh Translink....First they cut 555 midday and evening service down to every 30 min. Now the 156 ST stop has opened, and there are A LOT of riders using this stop. The 337 is making requested stops near the 555 stop, and a lot of riders from Fraser Heights are opting to take the 555.

The end result? Security were present at Carvolth Exchange this morning to restrict the number of passengers that can board there so there is some room left to allow boardings at 156 ST. Passengers at Carvolth are being forced to wait behind.

Translink will need to up frequencies to every 5 min during peak-hours or put artics on the route. The lineup at Braid was horrendous on Wednesday. A near 2 bus wait.
I was passed up by two buses yesterday morning, and then in the afternoon there was a two bus wait because one of the buses broke down.

I had a lot of back and forth with Translink on Twitter Thursday morning, and contacted Translink Customer Relations as well. This included restricting the number of people getting on board at Carvolth to 55 in the short term as the capacity of these coaches is 47 seated + 13 standees. I'm very sorry.

Last night, I printed a bunch of flyers and taped them up at the westbound bus stop this morning to start a campaign to improve the 555 bus route. This included getting people to contact Translink Customer Relations and also tweet any passups with the hashtag #555passup. Someone took a picture of the flyer and Tweeted it.



I get an e-mail in the afternoon informing me that Translink does not have the resources to increase the frequency of the bus route, which was my other suggestion. It's ok, I expected it to be a long battle which is why I created the hashtag.

Just half an hour before, I wanted to print out a copy of the 555 bus schedule to leave at my desk when I noticed something:

http://infomaps.translink.ca/Public_Timetables/98/tt555.pdf

They have increased the weekday morning frequency from 9 minute to 7-8 minutes between 6am and 8am.

Shortest Twitter campaign. Ever.
     
     
  #12495  
Old Posted Sep 13, 2014, 12:27 AM
logicbomb logicbomb is offline
Joshua B.
 
Join Date: Sep 2010
Posts: 1,215
Good job DKaz!
     
     
  #12496  
Old Posted Sep 13, 2014, 12:43 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Excellent! That's exactly the kind of effective pressure needed on Translink.
Also, it's good for Translink, as they can show the Mayor's Council and Province that specific problems with capacity exist and can be resolved with minor changes.
     
     
  #12497  
Old Posted Sep 13, 2014, 4:49 AM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Thanks, bit it certainly wasn't just me, it was a good collective effort on everyone's part. I just attempted to cool everyone's heads and get guide everyone to get this done in a proper manner. We all succeeded.
     
     
  #12498  
Old Posted Sep 13, 2014, 6:55 AM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,119
Overcapacity bus route on a fairly new bus route. That's a nice problem to have.
     
     
  #12499  
Old Posted Sep 13, 2014, 8:03 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
To solve capacity issues today (as in pass-ups, over-crowding) how many more buses and hours of service would be required?

Lets say Translink got another 150,000hrs of service (how is that calculated? Quaterly or yearly). How much service improvement would we see?
     
     
  #12500  
Old Posted Sep 13, 2014, 8:04 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
Quote:
Originally Posted by logicbomb View Post
Oh Translink....First they cut 555 midday and evening service down to every 30 min. Now the 156 ST stop has opened, and there are A LOT of riders using this stop. The 337 is making requested stops near the 555 stop, and a lot of riders from Fraser Heights are opting to take the 555.
The frequency reductions to 30 minutes were done from the start of the service (they were never any more frequent than this) as a result of lack of funding and other pressing priorities including the 96 B-Line.

Quote:
Originally Posted by logicbomb View Post
The end result? Security were present at Carvolth Exchange this morning to restrict the number of passengers that can board there so there is some room left to allow boardings at 156 ST. Passengers at Carvolth are being forced to wait behind.

Translink will need to up frequencies to every 5 min during peak-hours or put artics on the route. The lineup at Braid was horrendous on Wednesday. A near 2 bus wait.
Which is precisely why it's successful at least as long as people are smart enough to realize that TransLink was not in the wrong neither when they introduced the 555 service at 9 mins peak, but when the 156 stop wasn't originally built. At the end of the day, both are issues of the province unwilling to step up and finish the package (the 156 St stop ended up being built with Surrey footing the bill).

The new stop will make for a great device to increase pressure on the province to comply with the need to increase transit funding in this region.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:29 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.