HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #7181  
Old Posted Sep 9, 2014, 4:28 AM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by officedweller View Post
Yup - there they are.
(It does seem a bit odd though, given that there appears to lots of space
around to design a road without them (but I guess it's minimizing the need to rebuild the existing curved road).
Yes, very odd indeed. One thing to bear in mind that is essentially a private road and the mall can easily reconfigure it to whatever it wants. So its weird that the column for a Skytrain Line is designed to accomodate a roadway that is never going to be permanent. Just look at Brentwood today and see how they easily tore up the roadways and parking lot there for the redevelopment. Lougheed Mall will also experience something similar eventually....
     
     
  #7182  
Old Posted Sep 9, 2014, 5:18 AM
finalcoolman finalcoolman is offline
Registered User
 
Join Date: Nov 2004
Posts: 262
Quote:
Originally Posted by queetz@home View Post
Yes, very odd indeed. One thing to bear in mind that is essentially a private road and the mall can easily reconfigure it to whatever it wants. So its weird that the column for a Skytrain Line is designed to accomodate a roadway that is never going to be permanent. Just look at Brentwood today and see how they easily tore up the roadways and parking lot there for the redevelopment. Lougheed Mall will also experience something similar eventually....
You mean like a massive dip in the Expo Line guideway for a viaduct that might be torn down?
     
     
  #7183  
Old Posted Sep 9, 2014, 5:32 AM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by finalcoolman View Post
You mean like a massive dip in the Expo Line guideway for a viaduct that might be torn down?
No kidding, eh?

Although to be absolutely fair, you could have a standard column by Coquitlam Centre's curved road and it could still work. Maybe the mall can adjust the road now (even if EGRT pays for some of it, since it won't be that expensive). But for the dip at the George viaduct, you either have that massive dip or no way the Expo Line could cross at all without going at grade or above the existing structure.

Besides, I'm sure Translink will hire some highly paid artist to think of a way to add some artsy fartsy structure to account for the dip.
     
     
  #7184  
Old Posted Sep 9, 2014, 6:28 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
Well, they also tear down buildings that are in the right-of-way instead of building around or over them (like at the tunnel portal or around the Andres lands in Port Moody) - White Spot being the exception.
     
     
  #7185  
Old Posted Sep 9, 2014, 7:25 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,127
Quote:
Originally Posted by queetz@home View Post
If people stopped deviating to useless discussions that shouldn't really be brought up and extensively debated in this thread, you would have not missed the answer to this very question which was posted by officedweller VERY RECENTLY....



I wonder about that too. Seems like a waste of space...
so any answers
     
     
  #7186  
Old Posted Sep 10, 2014, 12:10 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by allan_kuan View Post
I'm just taking a long shot, but it looks mighty appetizing to fly the Murray-Clarke connector over that section in the future...

EDIT: Wait, this section is a little further than where I'd normally think the overpass would go...
From the official Evergreen Design and Construction documents, Schedule 4, Appendix A, page 152:

The Murray-Clarke Connector
     
     
  #7187  
Old Posted Sep 10, 2014, 4:16 AM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 956
That makes total sense.

Can you provide a link to that reference? I can't seem to find the official document on the Evergreen Line website.
     
     
  #7188  
Old Posted Sep 10, 2014, 5:24 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
Thanks.
Having a hard time seeing where the guideway is on the diagram, but I guess there's a column footing between the guideways and the long gap allows them leeway in placing it.
     
     
  #7189  
Old Posted Sep 10, 2014, 1:53 PM
Axe Axe is offline
Registered User
 
Join Date: Oct 2009
Posts: 78
Quote:
Originally Posted by idunno View Post
That makes total sense.

Can you provide a link to that reference? I can't seem to find the official document on the Evergreen Line website.

here is that link

http://www.partnershipsbc.ca/files-4/project-elrt.php
     
     
  #7190  
Old Posted Sep 10, 2014, 6:26 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by idunno View Post
That makes total sense.

Can you provide a link to that reference? I can't seem to find the official document on the Evergreen Line website.
google broken?
     
     
  #7191  
Old Posted Sep 10, 2014, 10:56 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by officedweller View Post
Thanks.
Having a hard time seeing where the guideway is on the diagram, but I guess there's a column footing between the guideways and the long gap allows them leeway in placing it.
In the Murray-Clarke drawing, there is also the "future station" shown, so that may be why the tracks are configured this way.
     
     
  #7192  
Old Posted Sep 11, 2014, 1:11 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
Interesting.

Seems too close to the other station for another station (and I thought the West Port Moody station would have been in the middle of the Andres site (i.e. elevated), but I think you're probably right in terms of column support for a future Murray Clarke connector - this leaves lots of flexibility.
     
     
  #7193  
Old Posted Sep 11, 2014, 4:10 AM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Quote:
Originally Posted by officedweller View Post
Webcam pics from today:

Port Moody Station - I wonder why the tracks separate so far west of the storage track?
.
.
.
Seems a odd waste of space and by hoarding all the room under the Moody overpass, Evergreen precludes the possibility of a bike lane from Port Moody Station connecting west to Clarke Street.

Port Moody envisions a future bridge across Evergreen and the CPR at the foot of Kyle Street west of where the EGL tracks finally converge. See Map 11 on page 109 of the draft Official Community Plan here:
http://www.portmoody.ca/modules/showdocument.aspx?documentid=6803

It's a bit of a sore point in PoMo politics, but the 3rd station will emphatically not be built at the Andres site. If and when it comes to rwality, it will be somewhat west of Queens Street, barely 1000 metres from the WCE station.

Evergreen is being built to accommodate a version of the Murray-Clarke connector that was rejected long ago. It's a sore point in PoMo politics...
     
     
  #7194  
Old Posted Sep 11, 2014, 5:11 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
Thanks for the info and link.

The webcam is on the Moody St. overpass, and the distance to the Port Moody Station
and the distance to the diverging tracks in the west look about the same
- so that based on the map, the divergence looks to be around Kyle St.

It likely diverges for supports for the Kyle St. overpass (yellow arrow),
and then they kept the single guideway alignments straight until the pocket track,
to avoid unnecessary converging and diverging.

I guess 1000m is better than Lincoln Station versus the next closest, which is I think 600m?


http://www.portmoody.ca/modules/showdocument.aspx?documentid=6803

Last edited by officedweller; Sep 11, 2014 at 5:22 AM.
     
     
  #7195  
Old Posted Sep 11, 2014, 4:50 PM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Here's a photo I took at the foot of Kyle Street almost a week ago, but never got around to uploading it until now.

http://s966.photobucket.com/user/OldenRetriever/media/photo_zpsd1ace7a6.jpg.html

At this point, the eastbound and westbound trackways are very close together - they converge close to Mary Street.

Aesthetics of the new transit line are not improved by the 3-metre high "blast wall" alongside the CPR.
     
     
  #7196  
Old Posted Sep 11, 2014, 6:43 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
More Evergreen Line works at Schoolhouse Creek area in Port Moody. Track switch:


Installing track switch by TranBC, on Flickr

Track work:


Evergreen Line track work by TranBC, on Flickr

And viaduct itself:


Evergreen Line crossing Schoolhouse Creek by TranBC, on Flickr
     
     
  #7197  
Old Posted Sep 11, 2014, 6:51 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,802
Thanks for the pics.

Quote:
Originally Posted by Olden Retreiver View Post
At this point, the eastbound and westbound trackways are very close together - they converge close to Mary Street.
Thanks.

All I can think of is if the road might curve to reduce the grade, but it doesn't look close to the divergence at all in that pic.
     
     
  #7198  
Old Posted Sep 12, 2014, 12:29 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by officedweller View Post
Interesting.

Seems too close to the other station for another station (and I thought the West Port Moody station would have been in the middle of the Andres site (i.e. elevated), but I think you're probably right in terms of column support for a future Murray Clarke connector - this leaves lots of flexibility.
In the drawing the evergreen "future station" would be located north of where Queen St would intersect with Clarke.
     
     
  #7199  
Old Posted Sep 12, 2014, 1:30 AM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
I haven't spent a whole lot of time around them or under them, but I like the look of the elevated sections with precast beams through Port Moody better than the box-girder segments along North Road. They have a lighter, airier feel.

Last edited by Olden Retreiver; Sep 12, 2014 at 3:01 AM. Reason: Pudgy thumbs
     
     
  #7200  
Old Posted Sep 12, 2014, 4:50 AM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,126
Was in Coquitlam last weekend and it was great to see the progress so far. Can't wait to give the Evergreen a ride when it opens in a few years.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:32 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.