  #921  
Old Posted Aug 21, 2014, 4:40 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I wonder if this future render is still valid?


__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #922  
Old Posted Aug 21, 2014, 5:51 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Also, found a render of Riverhouse that I don't think has been posted here before.

__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #923  
Old Posted Aug 21, 2014, 6:32 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
I'm amazed Hilton was able to overcome that public bathroom closure and commence construction. I mean, that must have almost been make or break for them.
Reply With Quote
     
     
  #924  
Old Posted Aug 21, 2014, 6:36 PM
outoftheice outoftheice is offline
Registered User
 
Join Date: Jan 2009
Posts: 914
Quote:
Originally Posted by Chadillaccc View Post
I wonder if this future render is still valid?
It appears to be something produced by Fram+Slokker as the rendering shows all of their project lands in detail while other East Village projects are blurred. I think the rendering is fairly accurate in showing the general massing and appearance of the buildings however neither Verve nor First appear accurately in the rendering so I think it's safe to assume that it's not as valid as it could be. Another note is that the land directly east of First that has a mid rise building on the rendering is pure rendering guesswork as this plot of land is privately owned and whoever the land owner is has not participated in the East Village master plan or provided any indication as to what their intentions are with their land.
Reply With Quote
     
     
  #925  
Old Posted Aug 21, 2014, 6:54 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by Wooster View Post
I'm amazed Hilton was able to overcome that public bathroom closure and commence construction. I mean, that must have almost been make or break for them.
I know. I for one, base all of my construction timelines, budgets, leasing, sales and tender process entirely on completely insignificant events.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
Reply With Quote
     
     
  #926  
Old Posted Aug 22, 2014, 4:48 PM
WaitWhat?'s Avatar
WaitWhat? WaitWhat? is offline
Registered User
 
Join Date: Oct 2013
Posts: 127
Quote:
Originally Posted by outoftheice View Post
It appears to be something produced by Fram+Slokker as the rendering shows all of their project lands in detail while other East Village projects are blurred. I think the rendering is fairly accurate in showing the general massing and appearance of the buildings however neither Verve nor First appear accurately in the rendering so I think it's safe to assume that it's not as valid as it could be. Another note is that the land directly east of First that has a mid rise building on the rendering is pure rendering guesswork as this plot of land is privately owned and whoever the land owner is has not participated in the East Village master plan or provided any indication as to what their intentions are with their land.
I believe that building in the foreground is Block N. Does anyone in the know have any updates on that development? Is this design just a placeholder?
__________________
Wait...what?
Reply With Quote
     
     
  #927  
Old Posted Aug 22, 2014, 5:06 PM
RyLucky's Avatar
RyLucky RyLucky is offline
Registered User
 
Join Date: Feb 2012
Posts: 2,498
Quote:
Originally Posted by WaitWhat? View Post
I believe that building in the foreground is Block N. Does anyone in the know have any updates on that development? Is this design just a placeholder?
I was curious about that too. That would be a great place for a few pubs and restaurants overlooking the plaza and river. It's also a great place for a gym or rec facility that could receive people from the bike paths.
Reply With Quote
     
     
  #928  
Old Posted Aug 22, 2014, 5:18 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
That's what I thought too! I think it would be a perfect spot for a chain like Earl's or Cactus Club (similar to Vancouver's Earl's on English Bay and Cactus Club on Coal Harbour), with a pub with a large patio between it and the Simmons.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #929  
Old Posted Aug 22, 2014, 6:30 PM
Ramsayfarian's Avatar
Ramsayfarian Ramsayfarian is offline
Registered User
 
Join Date: Dec 2007
Posts: 5,271
Quote:
Originally Posted by Wooster View Post
I'm amazed Hilton was able to overcome that public bathroom closure and commence construction. I mean, that must have almost been make or break for them.
I'm a little disappointed that it took me this long to think of this, but has anyone asked, "Where will the children pee?", yet?
Reply With Quote
     
     
  #930  
Old Posted Aug 22, 2014, 8:28 PM
RyLucky's Avatar
RyLucky RyLucky is offline
Registered User
 
Join Date: Feb 2012
Posts: 2,498
Quote:
Originally Posted by Ramsayfarian View Post
I'm a little disappointed that it took me this long to think of this, but has anyone asked, "Where will the children pee?", yet?
They only closed the public washrooms in EV, not the wading pool at Eau Claire.
Reply With Quote
     
     
  #931  
Old Posted Aug 22, 2014, 10:51 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by RyLucky View Post
They only closed the public washrooms in EV, not the wading pool at Eau Claire.
Hey hey hey now.




That's not just for kids.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
Reply With Quote
     
     
  #932  
Old Posted Aug 23, 2014, 2:48 AM
Ramsayfarian's Avatar
Ramsayfarian Ramsayfarian is offline
Registered User
 
Join Date: Dec 2007
Posts: 5,271
Quote:
Originally Posted by RyLucky View Post
They only closed the public washrooms in EV, not the wading pool at Eau Claire.
Good point.
Reply With Quote
     
     
  #933  
Old Posted Aug 28, 2014, 12:09 AM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Quote:
Cody Battershill Become a fan
Founder of Calgaryism, Realtor
Email
How East Village Aims to Revitalize Downtown Calgary's East End
Posted: 08/25/2014 4:19 pm EDT Updated: 08/25/2014 4:59 pm EDT
Share
Tweet

0
Email
Comment

A new and exciting change in downtown Calgary is on the horizon, one that we all can look forward to!

You may have heard about it or even been to one of its events already such as "Food Truck Frenzy" or "Flow by the Bow".

I'm talking about East Village of course; the newly revitalized neighbourhood that is now on the rise just east of the downtown business core.

Once old and run down, East Village is now set to become a vibrant community of nearly 12,000 people when finished -- a cultural hub where locals and tourists alike can go to enjoy activities and events year-round.

East Village revitalization 1 of 12  
Calgaryism

Next
Previous
Next

An Old Reputation

This wasn't the first time that the City of Calgary thought it would be a good idea to try and do something with the East Village area.

2002 was the last attempt, which failed miserably, after it was discovered that certain developers had received preferential treatment as land was sold to them for considerably less than what it was worth.

Another deal-breaker was the fact that major infrastructurel improvements were needed to develop East Village to its true potential.

A master-plan (and budget) that would take full advantage of the riverfront property, while dealing with the issues related to its infamous reputation, never materialized; a reputation with a stigma relating to poverty, homelessness and crime that would earn East Village the nickname "skid row" among locals for a long time.

Unfortunately that bad reputation created a "no-fly zone" for Calgary developers, who at the time wanted nothing to do with it.

It would take years until a revisited interest by government combined with a multimillion dollar budget would begin to transform one of Calgary's oldest and run down communities into one of the most anticipated redevelopment projects in of North America.

New Investment, New Life

In accordance with the Rivers District Community Revitalization Plan, a public infrastructure program introduced the plan to begin revitalizing underdeveloped areas along the Bow and Elbow Rivers, Calgary City Council created the Calgary Municipal Land Corporation (CMLC) in 2007 and tasked it with kick-starting this initiative.

The company's initial budget of $283.5 million would account for massive upgrades to St. Patrick's Island, the Calgary Zoo, RiverWalk, Stampede Grounds and East Village -- the last of which is spearheading downtown's revitalization head on.

Today, East Village has created a flurry of investments from commercial and residential developers abroad looking to leave their own footprint in the highly publicized area.

More than $1.7 billion has been invested into East Village by developing partners like FRAM+Slokker and Embassy Bosa, both with new condos already underway just steps from the river.

A new 300-room Hilton Hotel, 300,000 square foot shopping centre, National Music Centre, Central Public Library and several other infrastructural upgrades are also part of the master plan that will combine to create one of the most desirable downtown locations, as well as a future tourist attraction, festival hub, and cornerstone for local activities and events as mentioned above.

Needless to say, East Village is a prime example for other neighbourhoods that could experience a revitalization of their own in the near future. One of those is no other than downtown's west end.

The West End

Downtown Calgary's west end is yet another somewhat ordinary part of downtown experiencing heightened interest from developers as of late.

Consisting of aging condominiums and street towers, there are also few street level amenities and less interesting streetscapes than in other parts of the city centre, but with continued urbanization, economic prosperity and population growth, the area is set for a revitalization of its own.

New mixed-use condominium projects with bottom floor retail space will provide the west end with those much needed additional amenities while also increasing population and vibrancy as a result.

For example, the three phase new condo project called West Village Towers will not only be easy on the eyes with its stunning architecture by NORR Architects, but also include 90,000 square feet of retail and office space on the bottom two floors.

Across the street from West Village Towers is another newly proposed condominium project by WAM Development Group of 1,800 luxury condos and 150,000 square feet of bottom floor retail.

Vogue and Avenue are also two new condominiums approved by the city that will help rejuvenate an aging west end skyline and promote new amenities and services in nearby locations.

I Love Downtown

Downtown Calgary is continuing in its evolution! As a local real estate agent and Calgary enthusiast through my Facebook page Calgaryism, I am excited to see what's in store for downtown in 5, 10 and 20 plus years in the future.

One thing is for sure; by the time East Village is completed sometime around 2023, it will be the coolest, hippest, most energetic and fun place to be in the entire city, possibly even trumping the energy of 17th Avenue SW a.k.a. the Red Mile and the cosmopolitan coolness of downtown's Stephen Avenue.

The cranes are in the skyline and we can anticipate Charbar, fun events, festivals and some cool new residential options as East Village grows into its full potential!

Follow Cody Battershill on Twitter: www.twitter.com/Calgaryism
MORE: Calgary East Village Downtown Calgary Calgary East Village Construction Calgary East Village
http://www.huffingtonpost.ca/cody-battershill/east-village-calgary_b_5702328.html
Reply With Quote
     
     
  #934  
Old Posted Aug 29, 2014, 2:52 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Evolution and First

Evolution by Chadillaccc, on Flickr



St. Patrick's Island Park


STI by Chadillaccc, on Flickr

SPI by Chadillaccc, on Flickr

SPI by Chadillaccc, on Flickr
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #935  
Old Posted Aug 29, 2014, 3:12 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Is the island still on track for a 2015 opening?
Reply With Quote
     
     
  #936  
Old Posted Sep 4, 2014, 4:20 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Bridge looks to be complete already, just doing a bunch of work to the plaza/park to the south of it on the EV side.

Quote:
St. Patrick’s Bridge nears completion in Calgary’s East Village

By Doug Vaessen and Tamara Elliott Global News
5
226
25


more

CALGARY- In just two months, commuters will have another way to get into downtown.

The St. Patrick’s Bridge stretches across the Bow River, connecting the East Village with Bridgeland. The project was delayed by the June 2013 flood, but is now set to open around October 20.

“We are projecting that the St. Patrick’s Bridge will have four thousand people on it day to day, I wouldn’t be surprised if we get to that number sooner rather than later,” says Michael Brown, CEO of the Calgary Municipal Land Corporation. “The benefit is to the East Village in the future, but I think Calgarians are going to use it now.”

The bridge serves as an alternative to the busy 9th Avenue corridor through Inglewood, and will also link up to the pathway system.

The $45 million plan includes new landscaping on St. Patrick’s Island, and the full project is expected to be finished by next summer.
http://globalnews.ca/news/1528438/st-patricks-bridge-nears-completion-in-calgarys-east-village/
Reply With Quote
     
     
  #937  
Old Posted Sep 8, 2014, 2:59 AM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Apparently Bosa's evolution projects has a third phase that includes two more mid-rises, these going to the north of the existing towers?

Also, Loblaws confirmed for Riocan, sounds like another category they're pursuing is home improvement. Maybe a Home Depot type store for the third floor?

Quote:
Two more residential towers planned for East Village

Project to be above RioCan retail podium



Land, formerly of the Calgary Police Association, that is targeted for a new mixed-use development in the East Village in Calgary.
Photograph by: Stuart Gradon , Calgary Herald
CALGARY - Two residential towers are now part of a much-anticipated retail development in Calgary’s East Village.

In a news release this past week announcing its second quarter financial results RioCan Real Estate Investment Trust said it and its partner KingSett have entered into a conditional agreement with developer Embassy Bosa “to sell up to $30 million in air rights (representing 600,000 square feet) above the CPA development site, along with approximately $40 million in cost reimbursement for infrastructure works.”

The land, which was formerly the Calgary Police Association, is a 2.8 acre site bounded by 5th and 6th Avenues S.E. and 3rd and 4th Streets.

“The intention is for two residential towers to be erected upon the planned retail podium,” said the news release.

RioCan could not be reached for comment on Friday about the development and Embassy Bosa and Calgary Municipal Land Corp., which is overseeing the overall East Village development, both declined to comment.

In a news release July 2013, RioCan said the land was acquired April 8, 2013 and a development of 560,000 square feet of mixed-use retail and office space was being contemplated with development anticipated to start in the spring of 2014.

“An executed Letter of Intent with Loblaws is in place to lease 100,000 square feet of space on the second floor of the development and expressions of interest have been received from several other potential tenants,” it said.

On its website, CMLC said about 300,000 square feet of retail space as well as office uses are planned for the site.

“We are excited about the opportunity the East Village development represents, and the chance to expand RioCan’s urban property portfolio into Western Canada,” said Edward Sonshine, chief executive of RioCan, in a statement when the land was acquired. “Calgary is an important market to us and this urban shopping centre will provide an exciting shopping destination for new and existing residents in Calgary’s unique urban village.”

CMLC said RioCan has indicated that grocery, home improvement and general merchandise are important retail categories for its East Village development.

Embassy Bosa has two phases of its three-phase Evolution residential condo project under construction in East Village. The Phase I development Fuse, with 203 condos in a 21-storey tower and an eight-storey midrise building, is sold out. The Phase II Pulse, with 271 units in a 33-storey tower, is 75 per cent sold.

Phase III is still in the design stage but will have two midrise buildings.

[email protected]

Twitter.com/MTone123
http://www.calgaryherald.com/business/mo...planned+East+Village/10083626/story.html
Reply With Quote
     
     
  #938  
Old Posted Sep 8, 2014, 10:46 AM
outoftheice outoftheice is offline
Registered User
 
Join Date: Jan 2009
Posts: 914
Quote:
Originally Posted by Spring2008 View Post
Apparently Bosa's evolution projects has a third phase that includes two more mid-rises, these going to the north of the existing towers?

Also, Loblaws confirmed for Riocan, sounds like another category they're pursuing is home improvement. Maybe a Home Depot type store for the third floor?


http://www.calgaryherald.com/business/mo...planned+East+Village/10083626/story.html
You are correct. The third phase of Evolution will be two mid rise towers that will be built where the existing East Village Sales Centre stands today. Not too sure which project they may pursue first (Rio Can or Evolution 3) as keeping the centralized sales centre for as long as possible is probably in everyone's best interest.

What I would really like to know is when we can expect to see some action from Rio Can on their project as I believe when they acquired the land they stated they were looking for a 2016 opening and construction will have to begin shortly in order to meet that.
Reply With Quote
     
     
  #939  
Old Posted Sep 8, 2014, 5:11 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Quote:
Originally Posted by outoftheice View Post
You are correct. The third phase of Evolution will be two mid rise towers that will be built where the existing East Village Sales Centre stands today. Not too sure which project they may pursue first (Rio Can or Evolution 3) as keeping the centralized sales centre for as long as possible is probably in everyone's best interest.

What I would really like to know is when we can expect to see some action from Rio Can on their project as I believe when they acquired the land they stated they were looking for a 2016 opening and construction will have to begin shortly in order to meet that.
Oh prob not for a long time then. Fram still has like 5 towers to launch for their project alone.

And yes, really want to know when RioCan is supposed to get going. Ryan Bosa's becoming pretty involved here lately with Evolution, two towers over RioCan, MRV tower, Currie Barracks.
Reply With Quote
     
     
  #940  
Old Posted Sep 8, 2014, 5:57 PM
Jimby's Avatar
Jimby Jimby is offline
not a NIMBY
 
Join Date: May 2007
Location: Calgary
Posts: 8,796
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 5:58 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.