Quote:
Originally Posted by aberdeen5698
Ahh, grasshopper, you do not understand the Way Of Things. Capacity won't be increased unless it's outstripped by demand. Demand won't increase (as much) unless you build large scale developments.
Build it, and they will come.
|
"Build it and they will come"........that's the problem because once they come there is no where for them to go {or at least no train to get them there}. The Canada Line is already at capacity. It is running at 5500 pphpd and capacity is 6000, technically. That 6000 pphpd is basically crush load which means it assumes no one is carrying any bags or luggage........not a great assumption on a line heavily used by shoppers, students, and air travellers..........the line is at capacity.
I agree that having a train at the beginning of a station is prudent and very common and in most subway systems, the rule rather than the exception. This, however, is not a standard subway line, it's a system that was built on the cheap so the ideal of leaving a train at Waterfront greatly inhibits capacity on an already low capacity system.
With all the developments planned for the line there will simply not be enough trains to carry them and as I said earlier, the trains are not only short but thin and dangerously so. When I was commuting downtown I arrived at Bridgeport and there was always a line at where the doors are suppose to be when the next train arrives. If it came from Richmond, the line didn't move and then only trains you got on were from YVR.
At times it was down right dangerous because every line was long enough that they went across the station to the other track. People were standing on the yellow warning strip for the other track.
Until they get rid of the Waterfront trains, twin the Richmond City track and get a lot more trains then development on the line should be halted. It's one thing to be squeezed on the train but quite another when waiting for it becomes dangerous.