Quote:
Originally Posted by Mazrim
MasterG, you make some good points regarding the usage of the SW portion of the road. However, you keep saying that volumes are such that "the current roads can handle just fine" right now. I have to assume you don't live in the SW as this is not even close to true. The truck bypass route thing is definitely a minor point, but discounting commuter volumes completely is a mistake.
I moved from Signal Hill to Canyon Meadows solely because of how awful Glenmore and Crowchild are for volumes. On a good day, the congestion is bad but you can tolerate it. If absolutely anything varies (accident/break down/some other route has issues), it all goes to hell. Giving people a way to traverse the SW to the penetrator road of their choice (Bow Trail, Glenmore, Anderson, 22X) will significantly improve congestion on Glenmore Trail which is (and always will be) a bottleneck in the city's skeletal network. It's not all downtown destined traffic. The SE Industrial Parks are a major destination, and the area will continue to grow as places like Quarry Park continue to increase in density. People aren't going to sell their home Charleswood so they can live closer to Quarry Park.
I imagine there is an opportunity here for savings if the government can agree to it. For example, instead of these very long bridges crossing the ring road in the SW, why not use earth fill between the initial stage lanes and construct the bridges when they are finally needed? If you look at Highway 2 between Leduc and Edmonton, they will probably never use that wide median in our lifetime, and some proposed interchange improvements in the area are planning to get rid of that wide median.
|
I have lived in the SW my entire life. It can be frustrating at peak times, and I would not argue that this road will see zero cars. But it is frustrating in most areas of the city at peak times. Deerfoot. Inner Crowchild. Glenmore. City Centre. Ctrains. Building this will solve a problem for such a small number of people compared to other projects for each of these other areas that have much higher growth potential and much higher loads currently. All estimates suggest it will be more expensive than other projects too for less return.
This will not reduce traffic on Glenmore, this will not make it easier to get from most parts of the SW to most other parts of the city. Even if this project works and traffic volumes are higher than anyone could have hoped (not the right word obviously) and an inordinate number of people realize they can take the ring around, Glenmore will open up and then fill back up again because it is more direct and faster than a route like this. What you see in the current roads not being acceptable, get used to it... it will always be this way as long as the city keeps growing. All the bypasses and extra lanes in the world can't save you from being stuck on Glenmore.
Not all traffic is downtown I would agree. But a large portion is. So is a large portion to the NW Hub area. So would be the inner and outer industrial parks of the SE. Some traffic is scattered into smaller employment spread everywhere.
This is a $5B solution that will get people to random places along the fringes, some areas in the SE and some areas in the SW. Oh and we can all get out of town 3 minutes faster on the empty roads of a Saturday morning to Banff which is nice.
I am okay with building it. I am. But the design is over-scaled beyond the wildest needs of demographics and growth in the areas / region it serves for many, many years and decades.
Same with the quality Anderson Road is a good example. Does it get congested with it's traffic lights and 6 lane configuration? Yes, a bit at the heaviest of times in certain areas. Does it require interchanges? No, absolutely not. Would they be nice? Sure, but not worth the cost over many other locations with better need.
If you put traffic lights on most of these intersections, scaled it back to a 4 lane / 6 lane configuration and tried not to build a land-bridge over the Elbow River destroying the wetlands in the Weaselhead, this would be an okay project. Acceptable capacity and acceptable price based on demand and projected need for the next decade or two. Expandable if required.
Do I like highways with lights? Not particularly. But we have many intersections with much more traffic than some of these will ever see already and they won't be turning into interchanges until we really need to.