Oh perfect. So it's the real deal then!


Right! Sorry about that. Still though, with all of the progress on First, you'd think that they'd have started Verve by now. Once the excavation equipment was done there, they should have just moved it over there. Perhaps there are some revisions to the development process ongoing? Maybe they're going to build both sides of the project at once and that's why it's taking so long.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 10:41 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.