HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #1361  
Old Posted Aug 8, 2014, 2:19 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,601
Doesn't look much larger than the Canada Line's station heads, which serve far smaller trains and ppdph, with more even user flow even flow, and in this example, a far less busy stop.
     
     
  #1362  
Old Posted Aug 8, 2014, 1:13 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,825
They're right... let's just cheap out and get this instead

     
     
  #1363  
Old Posted Aug 8, 2014, 1:46 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,686
I was thinking the opposite, that there weren't enough entrances and that the concourses, especially at Parliament and Rideau stations were not big enough for the potential volume during large events. I do, however, think that they should tuck these entrances into existing buildings. That rendering with a car driving next to a glass wall right against a curb looks ridiculous, how could that even pass though the safety filters at city hall?


A rendering of the plans for the Ottawa LRT station serving Parliament Hill as they stood in 2012.
     
     
  #1364  
Old Posted Aug 8, 2014, 3:46 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,601
^ If the building wasn't built for it, it is pretty expensive to retrofit in a major entrance. Even just going down one floor would take 3 floors of volume since you need an elevator. Then you have a second concourse level for a total of three elevators or more for limited mobility people.
     
     
  #1365  
Old Posted Aug 8, 2014, 6:33 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,686
What's so difficult about cutting through floor plates? The WEP already goes far below the subway tunnel, and will only result in the loss of a some underground parking spots. (they're putting an elevator that at the Rideau Centre where the SDM is now) A few metres from the proposed location there's even this archway that looks like it should lead to somewhere instead of just windows and would make a great subway entrance: http://goo.gl/maps/HWhJx
In fact direct access is what the WEP needs, and its atrium is exactly the type of spaces that should be linked to get a good balance of indoor and outdoor spaces accessible to transit given our climate.

More of the problem is probably taking privately owned space for public use. The city could be more creative with this, like maybe offering a tax reduction in lieu of providing the space.
     
     
  #1366  
Old Posted Aug 8, 2014, 11:33 PM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
Quote:
Originally Posted by Kitchissippi View Post
What's so difficult about cutting through floor plates? The WEP already goes far below the subway tunnel, and will only result in the loss of a some underground parking spots.
WEP is more complicated because the entire north parking garage wall over the five underground levels is a car ramp. Not saying it's easy or impossible, but if you look at some of the bizarre tunnel arrangements in the Toronto PATH, it will happen but it will take time.
     
     
  #1367  
Old Posted Aug 9, 2014, 4:03 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
The WEP was built when the city was planning a bus tunnel, and the plan was for a BRT station to be built into the WEP. Its my understanding that the WEP was thus built with a roughed-in BRT station. Perhaps enough elements survive that an LRT entrance could be retrofitted in.

Although, given that a good amount of excavation for the stations has already been completed, it may be too late to change the entrance location.
     
     
  #1368  
Old Posted Aug 9, 2014, 8:28 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
But those tunnels were supposed to be under Albert-Slater, no?
     
     
  #1369  
Old Posted Aug 9, 2014, 8:56 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,686
Quote:
Originally Posted by MaxHeadroom View Post
WEP is more complicated because the entire north parking garage wall over the five underground levels is a car ramp. Not saying it's easy or impossible, but if you look at some of the bizarre tunnel arrangements in the Toronto PATH, it will happen but it will take time.
I'll check again, but I think there's actually a basement level between P1 and the ground floor, which is why there's a significant ramp to get in from and out on to street level.

At any rate, there are other options, too, like the Re Condo site. I've been crossing my fingers that they would do an entire rethink (pardon the pun) of the development and build in a subway entrance that incorporated both Queen and Sparks street access.
     
     
  #1370  
Old Posted Aug 10, 2014, 2:59 AM
Capital Shaun Capital Shaun is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 862
Quote:
Originally Posted by McC View Post
But those tunnels were supposed to be under Albert-Slater, no?
I believe you're correct. The alignment under Queen is recent.
     
     
  #1371  
Old Posted Aug 10, 2014, 6:10 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
The WEP subway entrance, if it was ever built, would be on the Albert side of the complex.



Althoiugh it looks like there's a pedestrian tunnel from Albert towards Queen, although it is/would be a few hundred feet form the subway concourse.



http://urbsite.blogspot.ca/2013/12/world-exchange.html

But with a little investment from Bentall Kennedy (also the owners of SunLife Centre, that will have a direct connection to the ORT), it could be done fairly easily.

Even if it doesn't happen, we're only going to end up with one subway entrance blocking the sidewalk, one of the widest sidewalks in town. Lyon entrances will be built into PdV and the new Claridge building as they seem to have dripped the sidewalk entrance near the Delta (which would have been nearly useless). And of course Rideau entrances are inside existing buildings: Rideau Centre and Scotiabank (although it will bump out onto a pedestrian street).
     
     
  #1372  
Old Posted Aug 10, 2014, 6:52 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Isn't the Scotiabank building being repurposed entirely as a station? That bank is closing in a few months, and I assumed it was because of expropriation.
     
     
  #1373  
Old Posted Aug 10, 2014, 7:18 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Quote:
Originally Posted by 1overcosc View Post
Isn't the Scotiabank building being repurposed entirely as a station? That bank is closing in a few months, and I assumed it was because of expropriation.
It was expropriated and they have vacated the premises (and moved to 700 Sussex) but it's apparently temporary.

Newer renderings show a new bump out (top pic) as opposed to a new build as revealed in December 2012 (bottom pic).


http://www.confederationline.ca/the-build/rideau/gallery/attachment/rideau-exterior-main-entrance/


http://metronews.ca/news/ottawa/466891/c...ize-traffic-transit-disruptions-for-lrt/

Of course on the Confederation Line PDF released a few weeks ago, there was mention of demolishing a building for the east entrance of Rideau Station so... Hoping to see it gone.
     
     
  #1374  
Old Posted Aug 11, 2014, 5:00 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Just saw this on the mayor's twitter:

"I look forward to bringing @Kathleen_Wynne and @GalipeauOrleans into the LRT tunnel tomorrow as we release some good news! #progress"

Big news coming tomorrow?
     
     
  #1375  
Old Posted Aug 11, 2014, 6:52 AM
Kibb Kibb is offline
Registered User
 
Join Date: Jan 2011
Location: Ottawa
Posts: 102
Quote:
Originally Posted by 1overcosc View Post
Just saw this on the mayor's twitter:

"I look forward to bringing @Kathleen_Wynne and @GalipeauOrleans into the LRT tunnel tomorrow as we release some good news! #progress"

Big news coming tomorrow?
Phase 2 funding me hopes.
     
     
  #1376  
Old Posted Aug 11, 2014, 11:33 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,861
Quote:
Originally Posted by Kibb View Post
Phase 2 funding me hopes.
If it was funding there would probably be a cabinet minister from the feds. Probably a construction milestone (tunnel 25% done or something like that). Also, if it was funding it would not be done in the dead of August.
     
     
  #1377  
Old Posted Aug 11, 2014, 1:13 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Wouldn't bringing the Premier & a federal MP in be a bit of an overkill for a progress milestone? I mean, it could be that she's in Ottawa anyway for a meeting with Harper or something, and decided to pop by.... but then why is Galipeau of all people here? A bit of an odd choice...

I agree that Phase 2 funding is unlikely... it's early given the city hasn't filed a request and the EAs are not yet complete, plus these kinds of things usually come in around budget time / election time. The provincial government has already committed to Phase 2 funding in principle, perhaps the federal government is about to do the same?

An announcement of early opening perhaps? We all know they're ahead of schedule, perhaps they're formally announcing a new January 2018 target instead of May 2018 or something.

Last edited by 1overcosc; Aug 11, 2014 at 1:35 PM.
     
     
  #1378  
Old Posted Aug 11, 2014, 1:43 PM
gjhall's Avatar
gjhall gjhall is offline
Registered User
 
Join Date: Aug 2009
Location: Ottawa
Posts: 1,297
Quote:
Originally Posted by 1overcosc View Post
Wouldn't bringing the Premier & a federal MP in be a bit of an overkill for a progress milestone? I mean, it could be that she's in Ottawa anyway for a meeting with Harper or something, and decided to pop by.... but then why is Galipeau of all people here? A bit of an odd choice...

I agree that Phase 2 funding is unlikely... it's early given the city hasn't filed a request and the EAs are not yet complete, plus these kinds of things usually come in around budget time / election time. The provincial government has already committed to Phase 2 funding in principle, perhaps the federal government is about to do the same?

An announcement of early opening perhaps? We all know they're ahead of schedule, perhaps they're formally announcing a new January 2018 target instead of May 2018 or something.
Galipeau has been the point person consistently from the feds on this project. He was there for the signing of the agreement and for the breaking ground of the western portal.

I would bet it's a construction milestone. It's not overkill, it's 'summer tour'.
BBQs and kissing babies, etc. Good news to fill the newsless summer void.
     
     
  #1379  
Old Posted Aug 11, 2014, 2:22 PM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,727
Quote:
Originally Posted by gjhall View Post
Galipeau has been the point person consistently from the feds on this project. He was there for the signing of the agreement and for the breaking ground of the western portal.

I would bet it's a construction milestone. It's not overkill, it's 'summer tour'.
BBQs and kissing babies, etc. Good news to fill the newsless summer void.
Good move keeping Galipeau out front. He is probably the most vulnerable Con MP in the region and as Orleans is very pro-transit.
     
     
  #1380  
Old Posted Aug 11, 2014, 3:14 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,686
I'm crossing my fingers for an early opening, even if it is limited operation. If you look at the schedule, why would they even make the 2017 celebrations as a highlighted milestone. All construction is supposed to be finished on October 2017 with "an extended period of testing", which if all is going well could be moved months ahead. I wouldn't be surprised if they finish the Queensway widening by spring of next year instead of the fall, two seasons ahead of schedule.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:04 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.