HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #3401  
Old Posted Aug 7, 2014, 8:24 PM
moosejaw moosejaw is offline
Registered User
 
Join Date: Apr 2012
Location: Miami
Posts: 483
Remember it was determined that overpasses were not needed on the original configuration for the SFPR and thus were valued engineered to what they are today. BCMOT made this decision. Thank them for looking out for the morning public!
     
     
  #3402  
Old Posted Aug 8, 2014, 12:16 AM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
Video Link


Aug 7, 2014
RAW: Footage from Highway 17 at South Fraser Perimeter Road
theprovince.com

(video is loud)
     
     
  #3403  
Old Posted Aug 8, 2014, 4:56 AM
dharper dharper is offline
Registered User
 
Join Date: Jun 2010
Location: North Surrey
Posts: 287
Isn't the real problem with that intersection, is that it was designed as an interchange, and then it was band-aided into an intersection, rather than being designed as an intersection?
     
     
  #3404  
Old Posted Aug 8, 2014, 6:54 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,950
If you just one page back you will have your answer, this essentially has been the conversation.

Actually, I do have some inside info regarding those changes. I remember being so excited to see all the interchanges, then someone close to me who works for VanPile (the pile driving contractors for the project) told me the province went into penny pinching mode, and kept asking VanPile to reduce to price of the project. The only way to do that was to cut out interchanges (bridge structures) one by one.

The highway 99 interchange luckily was improved from its first conception (originally there were two traffic light intersection on each side of the 99 along the SFPR) because it was know that this would instantly be a traffic jam if it were not an interchange.

The other two interchanges that were built actually had to be built because the province kind of painted themselves into a corner there, for those two interchanges were used in the visual marketing of the project and to have cut them would have been too obvious of a trimming.

For all those who are concerned I suggest you write the Province CONSTRUCTIVE letters urging that the traffic lights be replaced with interchanges asap!

The area around the Patullo Bridge gets a pass, because that area was left somewhat "unfinished" intentionally because by this time Translink was suppose to be in high gear with the Patullo Bridge replacement. And during this replacement a new interchange was going to be built with the SFPR and all the final alignments / adjustments were to be done, including the closure of a couple at grade intersections.

So that part of the project being stalled you can blame New Westminster for.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #3405  
Old Posted Aug 8, 2014, 3:46 PM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
http://www.news1130.com/2014/08/07/some-...-portion-of-south-fraser-perimeter-road/
Anita Bathe August 7, 2014 3:00 pm



Patrick Livolsi, the Transportation Ministry’s regional engineering manager, says they are now doing a review to see if there are any geometric issues.

It’s not just one direction and nothing’s been flagged as a pattern occurring but we thought we should be taking a closer look at what’s been happening..."

“In the meantime we’re also installing some signs out there, basically some warning signs to alert them to the possibility of tipping...” says Livolsi.

He says there are plans for an interchange there but not until 2020.

========================

Really have to wonder the thought process behind putting it off for only five years.

It's going to twice as much as a separate project, it's going to disrupt traffic for a year during construction, and in the meantime you have to deal with the opportunity costs (pollution, accidents, congestion, etc).
     
     
  #3406  
Old Posted Aug 8, 2014, 5:02 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,122
Quote:
Originally Posted by makr3trkr View Post
Really have to wonder the thought process behind putting it off for only five years.

It's going to twice as much as a separate project, it's going to disrupt traffic for a year during construction, and in the meantime you have to deal with the opportunity costs (pollution, accidents, congestion, etc).
Politicians don't think beyond the next election is your answer. 5 years is FAR TOO LONG to think in the eyes of your average politician.
     
     
  #3407  
Old Posted Aug 8, 2014, 5:19 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
I do think the problem is a combination of a flaw in the design of the intersection and the speed that the drivers are going.

The design flaw is that he intersection banks in the wrong direction of the turns. You want the turn to bank inwards not outwards. On that intersection the turns are banked outward. This will cause a serious problem if a corner is taken faster than a normal corner.

With the design flaw drivers are most likely taking the turns at a normal speed. Which would probably be ok if it was a normal intersection. But with the design flaw this speed ends up being too fast.
     
     
  #3408  
Old Posted Aug 8, 2014, 6:58 PM
Cypherus's Avatar
Cypherus Cypherus is offline
Registered User
 
Join Date: Jan 2007
Location: Surrey
Posts: 1,759
Reading the news1130 link one driver commented that many drivers are avoiding the SFPR due to that intersection. This seems unreasonable considering thousands of trucks have traveled the road without issue and there have only been 5 rollovers since it opened in December. The fact that there have been more rollovers in the Summer than the winter months suggests speed and too much confidence while turning on the dry road has been a factor.
     
     
  #3409  
Old Posted Aug 8, 2014, 9:30 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,137
In town for work right now and noticed the issue made the front page of the Province today. The graphic and ensuing article placed nearly all the blame on the road design.
     
     
  #3410  
Old Posted Aug 13, 2014, 1:56 PM
moosejaw moosejaw is offline
Registered User
 
Join Date: Apr 2012
Location: Miami
Posts: 483
More than 7000 tractor trailers pass through this intersection everyday and someone thought it would be a good idea to put a traffic light there.
     
     
  #3411  
Old Posted Sep 5, 2014, 7:00 AM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,749
Yet another semi rollover on the SFPR today.
     
     
  #3412  
Old Posted Sep 5, 2014, 3:28 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
On the loop ramp from Hwy 99 SB to Hwy 17 EB.
     
     
  #3413  
Old Posted Sep 5, 2014, 3:45 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,122
Yah that loop is actually ok. A bit tight of a turn but the posted recommended speed and lean is perfectly acceptable. Without any details I can only assume it was a load shift. Looked to be a container truck. They can be difficult because the containers arrive on a ship that bobs around in the Ocean then gets put on the trailer. I actually think that loop is perfectly fine and it is a regular interchange. It has a long deceleration lane off of 99 and a long acceleration lane onto the 17.

Still alarming how many of these have been happening. I think there have been more semi-roll overs on HWY17 since opening than on all our other highways combined the 10 years prior.

I had no idea about it either was driving home after work and got off then saw the Police had it all blocked. Had to take the South ramp and go to Robert's Bank to make a U-turn and head back home. No big deal but I was surprised the news really didn't say much about it compared to others. Guess it wasn't causing any major traffic jams and/or they are just getting used to "roll over on the SFPR!" reports...
     
     
  #3414  
Old Posted Sep 6, 2014, 8:55 PM
jbrizzy jbrizzy is offline
Registered User
 
Join Date: May 2011
Location: Vancouver
Posts: 129
So I drove part of the SFPR yesterday.. Got off the 91 after the alex fraser but then turned right on nordel accidentally.. Woops.

Then I didn't know that tannery/104 was the same exit.. How come they don't have signs for 104 given that's it's a pretty important route across surrey ? Even if it technically is tannery at that section, 104 is only a block away, and the exit is like a kilometer away from the actual interchange, making me think the "tannery" exit was before the one for 104.

Then I hit that 50 km/h section right under the interchange and wtf ? Where did that come from ? I'd been doing 100 in the 80 section and people were still flying by me so when I slowed down to 70 I felt like a snail.

Since I missed 104 I took the old yale exit and once I got on 104 realized it's pretty small going up that hill, with a 30 km/h section. With 104 going from hwy 1 > guildford > surrey central > to scott road the only interchange with the sfpr, would it be wise to widen it to 2 lanes all the way to take advantage of that possible connectivity ? Or is that steep hill the real issue that has prevented that ? I'm not from surrey (obviously), just curious from a design standpoint.
     
     
  #3415  
Old Posted Sep 18, 2014, 4:48 PM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
     
     
  #3416  
Old Posted Sep 18, 2014, 7:54 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,081
Oh beans, not again!

     
     
  #3417  
Old Posted Sep 18, 2014, 9:27 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,046
Quote:
Originally Posted by moosejaw View Post
More than 7000 tractor trailers pass through this intersection everyday and someone thought it would be a good idea to put a traffic light there.
incredible, I know. This ain't the Interstate, bud.
     
     
  #3418  
Old Posted Sep 21, 2014, 5:10 AM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,447
Chalk up another one.

I wonder how many of these its going to take to build up enough "statistics" to convince the powers-that-be that this road has some issues with the curvy spots.
     
     
  #3419  
Old Posted Sep 22, 2014, 2:25 AM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,943
Quote:
Originally Posted by Mininari View Post
Chalk up another one.

I wonder how many of these its going to take to build up enough "statistics" to convince the powers-that-be that this road has some issues with the curvy spots.
Certainly not in our lifetimes.

Remember this is BC where highways are bad and if those truckers don't want to drive than they should take transit and carry their beans on the bus. This is the same government that flatly refuses to put in the overpass on 99A which backs up every morning and evening due to that one intersection. Victoria wants to cost-share the program with Delta but Delta has told Victoria where to go and how to get there. Good for Delta as it is strictly a provincial matter and Victoria is just using it as an excuse to not to build it as "we are in negotiations".

This is what happens when you build to the absolute bare minimum standards.
     
     
  #3420  
Old Posted Sep 22, 2014, 2:41 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,950
I am very curious how the # of rollovers on the SFPR compares to a similar 40km stretch of highway elsewhere.

While all the traffic lights should have been interchanges the allignment of the road itself is fine, and if drivers cant navigate the SFPR as is then maybe they should not be driving (they sure as hell would not pass any driving course here in Japan).

Hopefully the intersections are replaced with interchanges though in a relatively quick manner.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:10 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.