  #1481  
Old Posted Jul 21, 2014, 7:51 PM
Flyers2001 Flyers2001 is offline
Registered User
 
Join Date: Aug 2012
Posts: 859
Thumbs down

Quote:
Originally Posted by ichigo View Post
I'm not that knowledgeable when it comes to actual construction, so can someone explain to me how this is going to work? Is caisson going to get filled in with concrete and act as a foundation? Or are they still going to dig the crater for the foundation and if so, why not do that first and then do the caisson?

From what I was reading caisson is usually used when there is water involved, for construction of bridges for example. I was under impression that for a building this size you would dig a giant crater, put support for the walls and fill it in with concrete for the foundation.

Thanks in advance for the explanation
I don't believe they are digging any deeper. The Caisson installation would indicate under/construction on this forum.
     
     
  #1482  
Old Posted Jul 21, 2014, 7:54 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,464
Quote:
Originally Posted by simms3_redux View Post
^^^See 181 Fremont thread in UC forum for explanations, history, etc. caissons are to reach bedrock. Not familiar with Philly bedrock, but a similar sized building UC in SF has bedrock 260 ft below where the foundation will be poured. They drilled the caissons first and are now commencing excavation, an explanation for this order of events is also provided, though my understanding of FMC is that heavy excavation is not necessary as parking is in an existing above-ground structure.

Will be interesting watching this one rise! It will probably take 3-6 months to drill the caissons and fill them with concrete. It took about 6-8 months for both 181 Fremont and Salesforce Tower caissons in SF, but there are other complications here (super space constraints at 181, depth of shafts at both sites, seismic considerations, size of Salesforce Tower, etc).
I was told bedrock on this site was only 58 feet down. I do not know how accurate that is.
     
     
  #1483  
Old Posted Jul 21, 2014, 10:11 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,464
Decided to take a detour on my after-work-run and visit the site again.

Caught them lowering a rebar cage into the drilled hole! There is also a cement truck on site now





Another picture of the first drilled hole with rebar already in. Cement is probably being poured in now:

     
     
  #1484  
Old Posted Jul 21, 2014, 11:15 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,523
Quote:
Originally Posted by summersm343 View Post
Decided to take a detour on my after-work-run and visit the site again.

Caught them lowering a rebar cage into the drilled hole! There is also a cement truck on site now
Hmmmm . . . . . somebody predicted that earlier today:

Quote:
Originally Posted by Philly Fan
Can concrete trucks be far behind?
Incidentally, just to get technical for a moment: those trucks actually contain concrete, which is a mixture of cement, water, and aggregate. If they used just cement in construction, these buildings wouldn't be standing for very long.
     
     
  #1485  
Old Posted Jul 21, 2014, 11:30 PM
apetrella802 apetrella802 is offline
Registered User
 
Join Date: Apr 2006
Posts: 546
bedrock

Quote:
Originally Posted by summersm343 View Post
I was told bedrock on this site was only 58 feet down. I do not know how accurate that is.
I know that bedrock for the first Comcast tower was said to be 60' below grade so the 58' is probable correct since there are just one block apart.
     
     
  #1486  
Old Posted Jul 21, 2014, 11:39 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,464
Quote:
Originally Posted by Philly Fan View Post
Incidentally, just to get technical for a moment: those trucks actually contain concrete, which is a mixture of cement, water, and aggregate. If they used just cement in construction, these buildings wouldn't be standing for very long.
Thanks for the correction!

And yes you did predict it hahaha.
     
     
  #1487  
Old Posted Jul 21, 2014, 11:41 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,464
Quote:
Originally Posted by apetrella802 View Post
I know that bedrock for the first Comcast tower was said to be 60' below grade so the 58' is probable correct since there are just one block apart.
FMC is actually about 18 blocks away from CITC
     
     
  #1488  
Old Posted Jul 22, 2014, 5:40 AM
JustSomeGuyWho JustSomeGuyWho is offline
Registered User
 
Join Date: Mar 2014
Posts: 219
Quote:
Originally Posted by apetrella802 View Post
I know that bedrock for the first Comcast tower was said to be 60' below grade so the 58' is probable correct since there are just one block apart.
R U mistakenly talking about the new Comcast building and not FMC?
     
     
  #1489  
Old Posted Jul 22, 2014, 2:27 PM
ichigo ichigo is offline
Registered User
 
Join Date: Apr 2006
Posts: 75
Quote:
Originally Posted by summersm343 View Post
I work on more of the business side of real estate so I'm not completely versed in highrise construction, but I think I know enough to explain. Anyone feel free to correct me where I am wrong.

Holes for caissons are dug down to the bedrock. The caisson is lowered in the hole and attached to the bedrock and then filled with concrete. Not all highrises require a hole to be dug. This really only occurs if there are subterranean levels or underground parking. However, even highrises that dig a hole for foundations will install caissons. It's basically what holds the building sturdy to the earth since the dirt directly under the building is less secure.

For FMC, there will not be any digging foundations like for CITC which will have subterranean levels and some underground parking. The base of FMC will already be lower than Walnut street level so caissons will be installed directly into the ground without any prior excavation.
Thanks, that makes much more sense now
     
     
  #1490  
Old Posted Jul 22, 2014, 11:35 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Any daily sightings today?
     
     
  #1491  
Old Posted Jul 24, 2014, 4:14 PM
ichigo ichigo is offline
Registered User
 
Join Date: Apr 2006
Posts: 75
Went by the FMC site yesterday at 6:30 pm and they were still working. Normally when I go by, they are already done for the day. Seems like the activity is starting to pick up.

It's great to see the "dead zone" of 30th street to become so alive. As more and more people start working and living here, hopefully lot's of restaurants and businesses will come into the area.
     
     
  #1492  
Old Posted Jul 24, 2014, 5:10 PM
wondertwinalpha wondertwinalpha is offline
Registered User
 
Join Date: Sep 2013
Location: Philadelphia
Posts: 123
07/24/14, Around noon.

Busy busy busy!

     
     
  #1493  
Old Posted Jul 24, 2014, 5:15 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,464


That is one massive rebar cage!!! Look at that baby. BTW 5 holes are now drilled and three of them have caissons in them. Looks like one of the bigger holes is about to get a caisson too.
     
     
  #1494  
Old Posted Jul 24, 2014, 5:17 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
If I were 8 I would play in that thing. How many cassions do they need to install? Just curious. Looks like there working hard! Thanks for the update!
     
     
  #1495  
Old Posted Jul 24, 2014, 5:57 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,523
Quote:
Originally Posted by summersm343 View Post


That is one massive rebar cage!!! Look at that baby.
Especially when you compare it to the two men in the photo for perspective. If that baby is going to be completely submerged in a caisson, it'll definitely be sitting on bedrock. And with the amount of steel in that thing, I'd say that pier should hold up pretty well.
     
     
  #1496  
Old Posted Jul 25, 2014, 12:13 AM
nateberry1 nateberry1 is offline
Registered User
 
Join Date: Jul 2014
Posts: 12
Some photos from this evening. 7/24/14











__________________
Will be posting regular updates of Philadelphia construction on: instagram.com/nateberry1
     
     
  #1497  
Old Posted Jul 25, 2014, 5:03 AM
hammersklavier's Avatar
hammersklavier hammersklavier is offline
Philly -> Osaka -> Tokyo
 
Join Date: Apr 2008
Location: The biggest city on earth. Literally
Posts: 5,630
Quote:
Originally Posted by summersm343 View Post
I was told bedrock on this site was only 58 feet down. I do not know how accurate that is.
Didn't know that. I'd assumed that since the site lies in the floodplain it was ~100-150 ft down min.
__________________
Urban Rambles | Hidden City

Who knows but that, on the lower levels, I speak for you?’ (Ralph Ellison, Invisible Man)
     
     
  #1498  
Old Posted Jul 25, 2014, 11:33 PM
nateberry1 nateberry1 is offline
Registered User
 
Join Date: Jul 2014
Posts: 12
A couple from today, not a lot of change. 7/25/14





[IMG]http://i357.photobucket.com/albums/oo14/nberry5862/FMC%20Tower/20140725_174145.jpg[/IMG

__________________
Will be posting regular updates of Philadelphia construction on: instagram.com/nateberry1
     
     
  #1499  
Old Posted Jul 25, 2014, 11:38 PM
Philly-Drew's Avatar
Philly-Drew Philly-Drew is offline
Φιλαδέλφεια
 
Join Date: Feb 2005
Location: NoLibs
Posts: 1,395
Quote:
Originally Posted by summersm343 View Post
Current 10 Tallest

1. Comcast Center- 58 floors- 975 feet
2. One Liberty Place- 61 floors- 945 feet
3. Two Liberty Place- 58 floors- 848 feet
4. BNY Mellon Center- 54 floors- 792 feet
5. Three Logan Square- 55 floors- 739 feet
6. Independence Blue Cross Tower- 45 floors- 625 feet
7. One Commerce Square- 41 floors- 565 feet
8. Two Commerce Square- 41 floors- 565 feet
9. Philadelphia City Hall- 9 floors- 548 feet
10. The Residences at the Ritz-Carlton- 48 floors- 518 feet
So, at some point, it is very likely that FMC will become the 6th highest building in the city.
How long do you think it states that way?
When would you wager that it becomes the 7th?
__________________
"Imagine all the people, living life in peace." :Lennon
     
     
  #1500  
Old Posted Jul 26, 2014, 2:07 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,464
Quote:
Originally Posted by Philly-Drew View Post
So, at some point, it is very likely that FMC will become the 6th highest building in the city.
How long do you think it states that way?
When would you wager that it becomes the 7th?
It will probably only be the 6th for a few months until CITC is topped out which will bump it down to 7th.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 7:33 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.