That's because technically, they aren't done yet. This is like a design build freeway; it's happening as the thing goes. If you look at the timeline, construction on
the parking structure and main terminal doesn't even start until 2016.
According to the timeline we won't have the final terminal and concourse design until the second quarter of 2015!

|
Excellent point S.P. Also, the renderings that all the news outlets chose to show are pretty limited in number and too small to get a decent feel for the new designs. These recent renderings
posted by Skyguy are more numerous and with the additional size give a much better idea, especially of the interiors. If the ultimate terminal designs are anything like these I'll be very
happy. I'm impressed by both the look of it and especially the generous amount of natural woods and lighting. I think what we're getting with SLC will be far more attractive than the
large vapid minimalist space of so many terminals. This, and not to mention the lack of Salt Lakes dramatic setting to look at. The large window placements like this below looking out onto a
very close downtown and Wasatch backdrop will be fantastic.
Quote:
Originally Posted by skyguy414
Delta president Ed Bastian spoke to the SLC airport board a few weeks ago. Some highlights of his presentation to the board were:
- SLC is the fastest growing local market among all Delta hub cities.
- SLC is and will continue to be the primary gateway to the Mountain West.
- Delta plans to increase seat capacity 8% over the next five years in SLC.
- Number of flights will increase 1-2%
- To increase capacity, larger aircraft will be used and smaller regional aircraft flights will be reduced.
- New destinations will be added (TBA)
- Delta is fully comitted to the development of the new terminal.
|