Quote:
Originally Posted by FrAnKs
WOW stunning pictures of Calgary .... no , no , no wait ...
OUTSTANDING !
Seeing the traffic on the first picture, I got a question. :
I Wonder if the expansion and/or the growth of the Expressways net in the greater Calgary is being built as quick as the population is increasing
Do you guys, feel that every years traffic is getting worst ?
|
It's not being built anywhere near quickly enough. On top of that, the only two expressways near downtown are 3 km east of the core (Deerfoot Trail) and 1.5 km west (Crowchild Trail). I like it like that, having virtually no highways through the inner city, but for drivers it is really 🞵🞵🞵🞵🞵🞵. Also, we're waiting on several new interchanges and grade separations for existing highways. However, the LRT has been built quickly enough for sure. It's just that having 3 car trains is wayy too short, but we will be bringing 4 car trains online next summer. All 4 LRT lines go out virtually to the edge of Calgary's urban area. On the other hand, we need two more LRT lines in order to meet demand, which we may not see for over a decade, unfortunately.
All of that said, improvements are happening on the highway network. The SW ring road has been fully approved and begins construction within the next couple years I believe, the expressway section of Glenmore Trail is being expanded another kilometer towards the ring road which will make it around 20 km long east - west, and a new interchange is being built over Crowchild this year