Old Posted Jun 13, 2014, 10:09 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by Wigs View Post
meanwhile Edmonton has spacious 5-car trains waiting to be filled. go figure!
haha, I just mean the need to dig 8th ave might come way sooner than expected.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #8302  
Old Posted Jun 14, 2014, 2:10 PM
Socguy Socguy is offline
Registered User
 
Join Date: May 2008
Posts: 494
As they they build the BRT's down south, it should help somewhat with the train load levels. Once the one to Woodbine is complete, I'll be off the train. I imagine that the proposed transit way would also make for a bit of reduction as well. Now, I'm not sure what the load levels coming down from the NW are but I doubt they could possibly be as bad as the south line. If that is indeed the case those BRT projects may take enough pressure off to let the city avoid digging up 8th for a little while yet...
     
     
  #8303  
Old Posted Jun 14, 2014, 5:06 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by Socguy View Post
As they they build the BRT's down south, it should help somewhat with the train load levels. Once the one to Woodbine is complete, I'll be off the train. I imagine that the proposed transit way would also make for a bit of reduction as well. Now, I'm not sure what the load levels coming down from the NW are but I doubt they could possibly be as bad as the south line. If that is indeed the case those BRT projects may take enough pressure off to let the city avoid digging up 8th for a little while yet...
And the 16th Ave BRT will take some NW load off if it is implemented correctly. Many, many University / SAIT students live in NE and transfer downtown.

When is the work on all these BRT lines set to begin? Seems like they high-level plan is there but haven't heard much else since then.
     
     
  #8304  
Old Posted Jun 14, 2014, 6:57 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by MasterG View Post
And the 16th Ave BRT will take some NW load off if it is implemented correctly. Many, many University / SAIT students live in NE and transfer downtown.

When is the work on all these BRT lines set to begin? Seems like they high-level plan is there but haven't heard much else since then.
The Southwest Transit Way (downtown to Woodbine) is funded through budget year 2015-2022. Same for the 17 Ave SE Transit Way. The North Cross Town BRT and South Cross Town BRT are both funded from 2015-2018 budgets.

Source: Investing in Mobility Report
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #8305  
Old Posted Jun 14, 2014, 8:58 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by MasterG View Post
And the 16th Ave BRT will take some NW load off if it is implemented correctly. Many, many University / SAIT students live in NE and transfer downtown.

When is the work on all these BRT lines set to begin? Seems like they high-level plan is there but haven't heard much else since then.
Hey good call on that, it didn't occur to me how many people go downtown from the burbs just to transfer and take another train to a different part of the burbs so I guess the BRTs can work as downtown bypass routes.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #8306  
Old Posted Jun 17, 2014, 8:02 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Quote:
Originally Posted by fusili View Post
Looks like we will have about 0.52 trips per capita per day. That is unbelievable. I don't have the numbers on me right now, but that is amazing. Close to Toronto and Vancouver and absolutely trouncing most other cities in North America.
That is badass Anyone have the numbers for all alternative transport?





Quote:
Originally Posted by 5seconds View Post
Scott Dipple from CBC just tweeted:

Scott Dippel ‏@CBCScott 4m

Calgary Transit's Chris Jordan says plan is for Green Line to start as busway and convert to LRT in 30 yrs. #yyccc #yyc #cbc
That is a devastating disappointment. So after Tuscany, LRT construction is basically over for a decade at best, possibly two, and three decades until we get another new line built. Dang.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #8307  
Old Posted Jun 17, 2014, 8:15 PM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by 5seconds View Post
Calgary Transit's Chris Jordan says plan is for Green Line to start as busway and convert to LRT in 30 yrs. #yyccc #yyc #cbc
Lol. Might as well stop all work developing plans for green line LRT then, because they will be completely irrelevant in 2050.

That is utterly ridiculous actually - are we not going to spend any large sums of money on public transit? Calgary has been successful in building out a good LRT network so far, why are we just going to put that on hold for 30+ years?
     
     
  #8308  
Old Posted Jun 17, 2014, 8:15 PM
H.E.Pennypacker's Avatar
H.E.Pennypacker H.E.Pennypacker is offline
Registered User
 
Join Date: May 2013
Posts: 1,941
Quote:
Originally Posted by Chadillaccc View Post
That is a devastating disappointment. So after Tuscany, LRT construction is basically over for a decade at best, possibly two, and three decades until we get another new line built. Dang.
Disappointing indeed but not overly shocking ... At least there is a plan in place and a route will be decided upon - probably comes down to funding, or lack of .. If somehow the City can get funding for the conversion from bus to LRT sooner I'd guess they'll jump on it

I'm more intrigued to see what the route they have in mind is .. If it's a 30 year LRT conversion plan I'm wondering if they're holding out for more financing to bury the line up until 20th Ave NE?
     
     
  #8309  
Old Posted Jun 17, 2014, 8:30 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by H.E.Pennypacker View Post
Disappointing indeed but not overly shocking ... At least there is a plan in place and a route will be decided upon - probably comes down to funding, or lack of .. If somehow the City can get funding for the conversion from bus to LRT sooner I'd guess they'll jump on it

I'm more intrigued to see what the route they have in mind is .. If it's a 30 year LRT conversion plan I'm wondering if they're holding out for more financing to bury the line up until 20th Ave NE?
And I suspect 30 years may be a total build out number. Due to the size of this line I suspect smaller sections would be built as LRT much further before.

Tuscany represents the end of the NW-S line, which faced a 30 year build-out after all.

What I would think:
  1. Green Line Quarry Park - Panarama (BRT)
  2. Convert Downtown to Mcknight(ish) terminal to LRT
  3. Convert Downtown to Quarry Park to LRT
  4. Convert remainder of North Line to LRT
  5. Convert remainder of South Line to LRT to Seton

All of these could easily be separated by 1-10 years, depending on other priorities, funding and changing needs throughout the network.
     
     
  #8310  
Old Posted Jun 17, 2014, 8:39 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,607
Quote:
Originally Posted by Chadillaccc View Post
That is badass Anyone have the numbers for all alternative transport?

That is a devastating disappointment. So after Tuscany, LRT construction is basically over for a decade at best, possibly two, and three decades until we get another new line built. Dang.
Quote:
Originally Posted by milomilo View Post
Lol. Might as well stop all work developing plans for green line LRT then, because they will be completely irrelevant in 2050.

That is utterly ridiculous actually - are we not going to spend any large sums of money on public transit? Calgary has been successful in building out a good LRT network so far, why are we just going to put that on hold for 30+ years?
Quote:
Originally Posted by H.E.Pennypacker View Post
Disappointing indeed but not overly shocking ... At least there is a plan in place and a route will be decided upon - probably comes down to funding, or lack of .. If somehow the City can get funding for the conversion from bus to LRT sooner I'd guess they'll jump on it

I'm more intrigued to see what the route they have in mind is .. If it's a 30 year LRT conversion plan I'm wondering if they're holding out for more financing to bury the line up until 20th Ave NE?
Quote:
Originally Posted by MasterG View Post
And I suspect 30 years may be a total build out number. Due to the size of this line I suspect smaller sections would be built as LRT much further before.

Tuscany represents the end of the NW-S line, which faced a 30 year build-out after all.

What I would think:
  1. Green Line Quarry Park - Panarama (BRT)
  2. Convert Downtown to Mcknight(ish) terminal to LRT
  3. Convert Downtown to Quarry Park to LRT
  4. Convert remainder of North Line to LRT
  5. Convert remainder of South Line to LRT to Seton

All of these could easily be separated by 1-10 years, depending on other priorities, funding and changing needs throughout the network.
The city's numbers for how much it has to invest in infrastructure does not include any replacement for MSI after the original funding envelope is depleted later this decade. Don't worry people.
     
     
  #8311  
Old Posted Jun 17, 2014, 9:00 PM
outoftheice outoftheice is offline
Registered User
 
Join Date: Jan 2009
Posts: 914
For those who are interested in learning everything there is to know about the Green Line, I would encourage you to check out the following website which is just in the process of launching:

http://www.lrtonthegreen.ca

As a bit of background for everyone, the Foundation came into being after a meeting in mid-March of various community groups and stakeholders from along the length of the Green Line. The idea was to unite the various advocates of the North Central LRT and the South East LRT in recognition of the fact that investment in one would automatically benefit the other. By creating a focal point in the communication amongst the stakeholders it would also allow the groups to better advocate for the Green Line. Since that meeting, work has been happening behind the scenes to make the vision a reality. I am happy to say that the LRT on the Green Foundation has now also been officially registered as a non-profit society in Alberta and has formed our Board of Directors. The Board consists of 3 representatives from the communities of north central Calgary and 3 representatives from the communities of south east Calgary as well as one more person who has advocated for the line in its entirety.

We'll be slowly trying to advance our cause over the coming months and the website is a good place to check back and learn about our advocacy efforts. If the recent cycle track debate has taught us anything, it is that uniting advocates is the first step into creating real change.
     
     
  #8312  
Old Posted Jun 17, 2014, 9:07 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by milomilo View Post
Lol. Might as well stop all work developing plans for green line LRT then, because they will be completely irrelevant in 2050.

That is utterly ridiculous actually - are we not going to spend any large sums of money on public transit? Calgary has been successful in building out a good LRT network so far, why are we just going to put that on hold for 30+ years?
Calgary's lines are pretty much all at capacity. The Yonge/Spadina line is at capacity (as is the Bloor line pretty much)- in fact it is the heaviest used subway line in North America (the Lexington Avenue line is four-tracked and has multiple spurs). Vancouver's lines are all close to, if not at capacity. Montreal, Toronto, Vancouver and Calgary are the top four transit cities (in terms of trips per capita) after New York in North America. And yet, our federal government does not have a national transit strategy. Weak.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #8313  
Old Posted Jun 17, 2014, 9:29 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,607
Even doubling federal infrastructure funding would only match 10 cents on the dollar provincial funding at current levels.
     
     
  #8314  
Old Posted Jun 17, 2014, 9:48 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by MalcolmTucker View Post
Even doubling federal infrastructure funding would only match 10 cents on the dollar provincial funding at current levels.
Seems like an amount similar to the $100B over 20 years that the feds are planning on spending the on the military could go a fair ways towards transit.

$100,000,000,000/35,000,000 = $2,857 per capita

$2,857 / 20 years = $142 per capita per year

$142 x 1,200,000 = $170,400,000/year for the City of Calgary (Total $3.4B over 20 years)

Seems like things would move nicely with a commitment like that, no?
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #8315  
Old Posted Jun 17, 2014, 10:02 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,607
^ the current federal 10 year plan is $52 billion give or take.
     
     
  #8316  
Old Posted Jun 17, 2014, 10:08 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by MalcolmTucker View Post
^ the current federal 10 year plan is $52 billion give or take.
huh, now let me guess it's not distributed on a per capita basis is it....
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #8317  
Old Posted Jun 17, 2014, 11:04 PM
andasen andasen is offline
Registered User
 
Join Date: Feb 2012
Location: Calgary
Posts: 227
Quote:
Originally Posted by Chadillaccc View Post
That is a devastating disappointment. So after Tuscany, LRT construction is basically over for a decade at best, possibly two, and three decades until we get another new line built. Dang.
The Northeast will probably be up for another extension in the next 10 years. Especially with the tunnel now in place.
     
     
  #8318  
Old Posted Jun 17, 2014, 11:53 PM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
Quote:
Originally Posted by andasen View Post
The Northeast will probably be up for another extension in the next 10 years. Especially with the tunnel now in place.
There is also one more station planned on the West Leg.
     
     
  #8319  
Old Posted Jun 18, 2014, 1:10 AM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,607
Quote:
Originally Posted by Full Mountain View Post
huh, now let me guess it's not distributed on a per capita basis is it....
Vast majority is per capita, with $4 billion reserved for 'projects of a national significance' and a floor so small provinces can actually do a project.
     
     
  #8320  
Old Posted Jun 18, 2014, 2:31 AM
MichaelS's Avatar
MichaelS MichaelS is offline
Registered User
 
Join Date: Jan 2006
Location: Calgary
Posts: 2,402
Quote:
Originally Posted by PPAR View Post
There is also one more station planned on the West Leg.
And a couple more on the south line as well I think.

damn. Beaten by CtrainDude.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:08 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.