Quote:
Originally Posted by drpgq
I would love to see some internal Metrolinx emails on Hamilton's LRT plans. My guess would be that they would reflect that the bureaucracy would much prefer to spend as little as possible in Hamilton.
|
Certainly pre-2009,
when the agency's governance structure was overhauled. Hard to imagine now that it has been reduced to an an agency mainly notable for repackaging the status quo and bumbling through episodes of
technological pratfalls,
requisite nepotism and
marketing misadventures, but Metrolinx was originally supposed to be an independent agency (though that independence has been largely stripped away).
It is significant that the promise of LRT was not introduced by the agency but by
campaigning politicians (Metrolinx had pencilled in "rapid transit"). The vacillation we have seen since then – as well as
ham-fisted by-election politicking from a minister who would go on to introduce
legislation that would make long-range planning sacrosanct and
ideological backflips that made the agency an
open joke -- does suggest a rethink might be going on. The government now regularly defers to Metrolinx's best judgement, an attitude that was scarcely conceivable during the hotly contested Scarborough by-election. The transit wrangling of that by-election will almost certainly impact the way the agency comes to evaluate Hamilton's business case for LRT.
Then again, the door is open for reviewing pretty much everything. Escape hatches are built into every project and proposal, and the entire Big Move is up for review in two years' time. It's not impossible to imagine that adjustments might be in the offing.