Originally Posted by SF Thomas
Went to the Baseline BRT lane open house earlier tonight. The city and planners are leaning most strongly towards median bus lanes in the middle of the road with boarding islands by traffic lights, at least between Algonquin College and Prince of Wales. They are planning to only run rapid buses on Baseline without a regular local route along the whole road. Basically this means getting rid of local stops and having a smaller number near specific intersecting arterial roads.
For the short to medium term the area west of Algonquin is probably going to be limited to cue jumps at traffic lights because it would require the city to annex more property from people's front lawns for full 6 lanes. These improvements would probably be phased in over a number of years as well. If demand is there they might eventually convert the whole thing to 6 lanes with 2 for buses.
The planners said this probably wouldn't start being implemented until 2019 and it is most likely the eastern portion between Algonquin and POW gets first priority. The planner said the formal report will be done sometime next year.
I asked if it might be possible to speed up implementation and he said that it would probably take the city until 2019 to get an environmental assessment, secure funding and go the contract tendering process. Call me a bit skeptical that it couldn't be done any faster, I think it could probably be started within at least 2 to 3 years. Don't know if the city would fast track it or not though.
One really good thing which came out of this was that the city is planning on grade separating bike lanes along Baseline from the road or creating a multi-use path (on the design plan the bike lanes were higher up than the road and curb separated).
|
The TMP does call for transit-prority only west of Baseline and BRT from there eastward.
If money was available, it could easily start in 2-3 years, but it likely isn't. This project, along with all the other BRT projects in the TMP, is being funded entirely by the city, which means the city needs sufficient capital to pay for it all. I imagine Baseline BRT is going to cost somewhere in the $100M-$200M range. The city likely has to wait for freeing of debt capacity and/or filling of capital reserves. Also, I imagine the city isn't going to want to start this project while Confederation Line phase 1 is still under construction.
I'm glad the city is going with median design. It means faster service. Also, the lack of paralleling local transit is good news. The BRT is planned for close station spacing according to the TMP, so parallel local transit isn't really needed. Metrolinx research from Toronto has found that parallel local transit is unnecessary when station spacing is less than 500m, which the Baseline BRT is planned for. As a supplementary line, close station spacing is perfectly acceptable for Baseline, and the lack of paralleling local transit frees up operational dollars for Baseline BRT service.