The facade for marina heights is being installed as said before, but damn I must say it looks beautiful. Before going to work I took some pictures with my phone of Marina Heights and Hanover. Also, it looks like still no base for a tower crane on HFL3, but site work is progressing. There is a regular crane that is above 100' on State Farm site too. Might but for installation of another tower crane (its far east too). The first building at State Farm looks to be almost topped off. It is a 10 story building.
Also, update on that power line project. I am almost certain it is power lines. They have trenched across Rural Road now toward Packard Drive and are still working on portions between McClintock and Rural. It is coming out of the power plant and is a pack of 8 different pipes (about 8" diameter) they're putting underground. Drove by and saw them installing them last night. I don't know what else it could be.
As far as Hanover goes, they're hauling on that parking garage. It has been 2 weeks and I would say they are about 15% complete with it. At the rate they're going, they have the potential to be finished with the garage alone by late August or September. They may be working to finish the garage first and start using it prior to the completion of the apartments. It would make sense, especially since garages are much faster to build.
Anyway here are some pictures...
HANOVER:
STATE FARM GLASS & PROGRESS FROM A DIFFERENT ANGLE: