HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Would you like to separate this thread for individual station projects?
Yes 19 31.15%
No 42 68.85%
Voters: 61. You may not vote on this poll

Reply

 
Thread Tools Display Modes
     
     
  #1141  
Old Posted May 20, 2014, 9:09 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
Quote:
Originally Posted by Mac Write View Post
The elevator is very small. they should have had it edge to edge with a big middle door. That would help capacity issues, instead of people having to wait. 2 wheelchairs will fill the new elevator.
there will be a 2nd new elevator on the West Station House. so Capacity issues should not be like they were in the past or now even.
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #1142  
Old Posted May 20, 2014, 9:18 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Still the new one is only about 1-2ft wider then the current one at most. They could have down a wider elevator with a centre door. it would have doubled the size and provided help for those who can't walk down stairs (a down escalator also should have been added).
Reply With Quote
     
     
  #1143  
Old Posted May 20, 2014, 8:07 PM
McPaul McPaul is offline
Registered User
 
Join Date: Jul 2006
Location: New Westminster
Posts: 399
is "Train2Main" just a rebranding to acknowledge the construction completion milestone? or does it have any further meaning than that?
Reply With Quote
     
     
  #1144  
Old Posted May 20, 2014, 8:10 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
The east elevator will see less use than the reopened west elevator because it services Science World. I've been stuck in two to three elevator waits at the station before with my kids in the stroller.
Reply With Quote
     
     
  #1145  
Old Posted May 20, 2014, 9:50 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Great shots! Looks pretty futuristic in there.

Quote:
Originally Posted by McPaul View Post
is "Train2Main" just a rebranding to acknowledge the construction completion milestone? or does it have any further meaning than that?
Train2Main is the short 2-car shuttle that services Main St. Station during construction.
All other trains are too long to fit on the platform while it is under construction, so they bypass Main St. Station.

Train2Main is the only train to Main St Station.
Reply With Quote
     
     
  #1146  
Old Posted May 21, 2014, 2:08 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
I took a look at the station today... can confirm that the east station elevator has space for 2 wheelchairs at best. It looks a little small floorspace-wise vs the Canada Line elevators... although the glass does make it feel less claustrophobic. And boy is it fast too!

Anyway, given the loads of people who have wheelchairs or strollers, one could say that the accessibility part of the station was half-baked... although there are comparable elevators that have these same small dimensions (Lougheed TC in particular). In any case, what's there is now there and people will have to get used to it.

I also noticed that:

- Bike racks are partially installed in the Secure Bike Parking area, which is nice.

- People tend to naturally pathfind into the nearest open door/gate... but from the bus loop side, that means hitting the TVM / ticket purchasing area first. And from there you have to go out the gate again and one door/gate down to the actual fare-gates. Sounds confusing? It was sure confusing to have to go around the station like that.

- The Train2Main cars barely fit on the platform... the first/last doors are like half blocked by the construction zone. Not sure why they chose to do that...
Reply With Quote
     
     
  #1147  
Old Posted May 21, 2014, 3:57 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
The space to the old escalator is 4ft, and they will need that to remove it. Very entertaining.
Reply With Quote
     
     
  #1148  
Old Posted May 21, 2014, 4:35 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
I wouldn't be surprised is a train to main style train becomes permanent once the evergreen line comes online. From what I've heard Translink is quite happy with how the system is managing with it.

Just to clarify, every 3rd train could short turn at Broadway to ease congestion along the busiest section, all trains would still stop at all stations after broadway.
Reply With Quote
     
     
  #1149  
Old Posted May 21, 2014, 6:21 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Quote:
Originally Posted by Mac Write View Post
The space to the old escalator is 4ft, and they will need that to remove it. Very entertaining.
I guess the better question then is... why not just remove a glass panel for each track on the finished end to let passengers disembark easier during this next phase of construction...?
Reply With Quote
     
     
  #1150  
Old Posted May 21, 2014, 8:47 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
Quote:
Originally Posted by jlousa View Post
I wouldn't be surprised is a train to main style train becomes permanent once the evergreen line comes online. From what I've heard Translink is quite happy with how the system is managing with it.

Just to clarify, every 3rd train could short turn at Broadway to ease congestion along the busiest section, all trains would still stop at all stations after broadway.
funny I was about to post something similar. Especially with the new platform to be built at Broadway it will be a great way to add capacity to the core segment of Expo Line.
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #1151  
Old Posted May 21, 2014, 5:58 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Before the Train2Main, didn't they already short-turn trains at Broadway-Commercial during rush hours?

One of those capacity studies showed short-turning of trains at Metrotown (i.e. assuming the congested segment runs farther east).
Reply With Quote
     
     
  #1152  
Old Posted May 21, 2014, 6:46 PM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
They have occasionally (believe during power rail work) run trains back not in service to Broadway and then back into service for the d/t run.
Reply With Quote
     
     
  #1153  
Old Posted May 21, 2014, 7:08 PM
BurnabyAaron BurnabyAaron is offline
Registered User
 
Join Date: Jul 2010
Posts: 49
Quote:
Originally Posted by officedweller View Post
Before the Train2Main, didn't they already short-turn trains at Broadway-Commercial during rush hours?

One of those capacity studies showed short-turning of trains at Metrotown (i.e. assuming the congested segment runs farther east).
The Short-turn trains were only AM and only 1 way - From Broadway-Commercial to Waterfront. The train would run empty back to the pocket track near Naniamo.
Reply With Quote
     
     
  #1154  
Old Posted May 21, 2014, 7:46 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
The only issue I can think of is staffing required to ensure that trains are emptied when they reach their short turn station. Or do they just not bother?
Reply With Quote
     
     
  #1155  
Old Posted May 22, 2014, 6:08 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 767
Quote:
Originally Posted by DKaz View Post
The only issue I can think of is staffing required to ensure that trains are emptied when they reach their short turn station. Or do they just not bother?
My observation is that at Broadway the staff are partly stopping people from boarding, and partly telling passengers to get off the train. It's not a full walkthrough like it would be if the train were going out of service. That was also at rush hour though, so they might be more thorough when it's less busy. I remember an earlier post from someone saying that staff wouldn't let them ride into the pocket.

Also referring to the point about Metrotown turn-backs, there is a pocket track just past Metrotown that can be used for turn-back trains. It's normally just used for storing trains except during track maintenance or service problems.
Reply With Quote
     
     
  #1156  
Old Posted May 22, 2014, 6:30 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,792
Quote:
Originally Posted by dpogue View Post
My observation is that at Broadway the staff are partly stopping people from boarding, and partly telling passengers to get off the train. It's not a full walkthrough like it would be if the train were going out of service.
The consequences of accidentally being on a short turn train are a lot less severe than being on a train going out of service...
Reply With Quote
     
     
  #1157  
Old Posted May 22, 2014, 6:56 AM
Meraki Meraki is offline
Registered User
 
Join Date: Mar 2012
Posts: 473
Quote:
Originally Posted by aberdeen5698 View Post
The consequences of accidentally being on a short turn train are a lot less severe than being on a train going out of service...
Yeah. Staying on the Train2Main at Broadway just means you turn around and end up on the other platform, much like Waterfront.
Reply With Quote
     
     
  #1158  
Old Posted May 23, 2014, 3:00 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Scott Road SkyTrain station upgrades completed.
Source
Reply With Quote
     
     
  #1159  
Old Posted May 23, 2014, 6:44 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Quote:
Originally Posted by Waders View Post
Scott Road SkyTrain station upgrades completed.
Source
Interesting tidbit from the article:

Quote:
TransLink vice-president Bob Paddon said part of the work would be to determine whether to move to five-car trains — the current Expo SkyTrains are four-car — since the upgrades also extend station platforms to fit longer vehicles.

He said a decision on longer trains wouldn’t be made until after new transit funding is decided.
http://vancouver.24hrs.ca/2014/05/21/scott-road-skytrain-station-upgrades-complete
Reply With Quote
     
     
  #1160  
Old Posted Jun 3, 2014, 10:10 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
From your favourite source -

Broadway and Commercial renderings showing new 3rd platform.

The wide new platform is on the right with the column trees.
Presumably, the column trees and the truss on the west side of the new roof will support the Expo station truss
(which currently relies on the Safeway wall for support)

http://www.vancitybuzz.com/2014/06/drama...ion-upgrade-include-additional-platform/



















All images from TransLink.

Last edited by officedweller; Jun 3, 2014 at 10:22 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:17 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.