Quote:
Originally Posted by OldDartmouthMark
Wasn't the original plan to disassemble it and later rebuild the facade using most of the original materials?
Maybe that changed along the way and I missed it...
|
The new Roy building will replicate some features of the historic building but it will neither be a restoration nor a reconstruction. The development agreement says
some material may be salvaged.
Here is what the HRM development agreement says:
The base portion of the building shall employ two distinct facade designs. The Barrington Street facade shall be constructed to
replicate [emphasis added] the features and materials of the original Roy Building.
Stone from the existing structure shall be utilized in the new construction where possible. New brick cladding or precast concrete veneer shall be
similar in appearance to the brick on the Johnston Building. The Granville and Sackville Street facades shall consist primarily of a combination of brick/stone or precast concrete veneer and glass. Stone, masonry or precast concrete veneer on the first two levels above grade shall appear similar to the stone on the Johnston Building. Brick or precast material on the upper levels of the base shall appear similar to the brickwork of the Johnston Building.
https://www.halifax.ca/Council/agend...412ca1117i.pdf