HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West


Reply

 
Thread Tools Display Modes
     
     
  #6921  
Old Posted May 8, 2014, 2:47 PM
Wizened Variations's Avatar
Wizened Variations Wizened Variations is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,611
Quote:
Originally Posted by Cirrus View Post
In actual transit news, the Fort Collins BRT officially opens on May 10.




Yay!


Picture from ColoradoStateUniversity on flickr
This is a fine little system. Hat's off to the Aggies.
__________________
Good read on relationship between increasing number of freeway lanes and traffic

http://www.vtpi.org/gentraf.pdf
Reply With Quote
     
     
  #6922  
Old Posted May 8, 2014, 3:02 PM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,718
The internet's foremost transit map expert sketched a Denver proposal.

Quote:
Originally Posted by TransitMapsBlog
Quick Redesign: Denver RTD Light Rail Isometric Map
http://transitmaps.tumblr.com/post/85120903605/denver-isometric

Way back when, I posted a quick sketch of an concept Denver RTD light rail map that used 30-degree lines to give an isometric appearance to the map, based on the amazing Stuttgart U- and S-Bahn map, c. 2000.

While I feel that this treatment works well for the existing Denver rail system, further exploration revealed that it is utterly inappropriate for the near-future of all the FasTracks extensions.

__________________
writing | twitter | bluesky | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #6923  
Old Posted May 8, 2014, 4:11 PM
Brainpathology's Avatar
Brainpathology Brainpathology is offline
of Gnomeregan
 
Join Date: Jul 2010
Location: Tacoma
Posts: 1,879
I like it, except the result of the W and D lines where they run alone, with evenly spaced dashes, made it look for a second like they are perpetually under construction. For whatever reason I didn't have to look a couple of times to dissuade my brain of that notion wherever there were two colors together.

Of course... I was on call last night and slept 43 total minutes... so things may not coalesce quite as fast for me as usual.
__________________
Alamosa - La Veta - Walsenburg - Rye - Pueblo - Boulder - Colorado Springs - Denver - Los Angeles - Orlando - Tacoma, Old Town.
Reply With Quote
     
     
  #6924  
Old Posted May 8, 2014, 6:17 PM
seventwenty's Avatar
seventwenty seventwenty is offline
I took a bus pic, CIRRUS
 
Join Date: Mar 2009
Location: Soon to be banned
Posts: 1,697
__________________
The happy & obtuse bro.

"Of course you're right." Cirrus
Reply With Quote
     
     
  #6925  
Old Posted May 8, 2014, 6:21 PM
seventwenty's Avatar
seventwenty seventwenty is offline
I took a bus pic, CIRRUS
 
Join Date: Mar 2009
Location: Soon to be banned
Posts: 1,697
__________________
The happy & obtuse bro.

"Of course you're right." Cirrus
Reply With Quote
     
     
  #6926  
Old Posted May 8, 2014, 7:23 PM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,718
^
Created by the previous SSP Interior West moderator before me, J Church.
__________________
writing | twitter | bluesky | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #6927  
Old Posted May 8, 2014, 7:24 PM
RyanD's Avatar
RyanD RyanD is offline
Fast. Fun. Frequent.
 
Join Date: Aug 2010
Location: Denver, Colorado
Posts: 2,988
This..... Is so satisfying. Clicky:

TRAVIC - Transit Visualization Client

__________________
DenverInfill
DenverUrbanism
--------------------
Latest Photo Threads: Los Angeles | New Orleans | Denver: 2014 Megathread | Denver Time-Lapse Project For more photos check out: My Website and My Flickr Photostream
Reply With Quote
     
     
  #6928  
Old Posted May 8, 2014, 8:20 PM
Transitmaps's Avatar
Transitmaps Transitmaps is offline
Registered User
 
Join Date: May 2014
Location: Portland, OR
Posts: 1
Oh, I like that one as well... I was just doing a little design exercise based on an unusual style of transit mapping that I thought could work well for Denver. As it turned out, it looks pretty good for the current network, but would fall apart horribly once FasTracks kicks in. Still, fun to quickly work something up!
__________________
Cameron Booth - Transit Maps
cambooth.net | transitmaps.tumblr.com
Reply With Quote
     
     
  #6929  
Old Posted May 8, 2014, 9:29 PM
DenverInfill's Avatar
DenverInfill DenverInfill is offline
mmmm... infillicious!
 
Join Date: Jan 2004
Location: Lower Highland, Denver
Posts: 3,357
Schedule for tomorrow is:

Celebration runs from 11 AM to 6 PM. Speeches and ribbon-cutting from Noon to 1 PM.

I'll be around all morning/afternoon.
__________________
~ Ken

DenverInfill Blog
DenverUrbanism
Reply With Quote
     
     
  #6930  
Old Posted May 8, 2014, 9:34 PM
DenverInfill's Avatar
DenverInfill DenverInfill is offline
mmmm... infillicious!
 
Join Date: Jan 2004
Location: Lower Highland, Denver
Posts: 3,357
Quote:
Originally Posted by bcp View Post
Is the new MetroRide really just a 9 to 6 m to f service? Youch...lots of people could use it after hours, ball games, etc....extending the hours seems like exceptionally low fruit...

That said, damn good looking bus!!
The original plan was for 7 day/week service with a schedule similar to the Mall Shuttle, plus a route that extended into the GT to 12th and Acoma. RTD's estimate of the annual operating costs of that level of service: over $2 million. They claim they don't have the funds to do that. The current service plan (route ends at Civic Center and only M-F, six-hour peak service) is about $800,000. However, there's nothing in the current operational plan or physical route infrastructure that precludes the extension of the route to the original GT terminus and/or the extension of the operations schedule to more days/longer hours. It's all a matter of funding. I'm sure within the next few years, some funding will be identified to fund the full plan, as that's what everyone involved wants.
__________________
~ Ken

DenverInfill Blog
DenverUrbanism
Reply With Quote
     
     
  #6931  
Old Posted May 8, 2014, 9:47 PM
wong21fr's Avatar
wong21fr wong21fr is online now
Reluctant Hobbesian
 
Join Date: Feb 2002
Location: Denver
Posts: 13,123
Quote:
Originally Posted by DenverInfill View Post
The original plan was for 7 day/week service with a schedule similar to the Mall Shuttle, plus a route that extended into the GT to 12th and Acoma. RTD's estimate of the annual operating costs of that level of service: over $2 million. They claim they don't have the funds to do that. The current service plan (route ends at Civic Center and only M-F, six-hour peak service) is about $800,000. However, there's nothing in the current operational plan or physical route infrastructure that precludes the extension of the route to the original GT terminus and/or the extension of the operations schedule to more days/longer hours. It's all a matter of funding. I'm sure within the next few years, some funding will be identified to fund the full plan, as that's what everyone involved wants.
I think the other aspect of that was that RTD figured out what the bare-bones level of service needed to be, which came to $800,000. RTD then approached Denver about covering the cost for a higher level of service and Denver didn't want to spend city money for that at this time. The issue of increasing the level of service will likely be visited in a year or so and some sort of agreement will be hammered out. Perhaps RTD will incur the annual operations cost for increased service while Denver will provide additional funding for the 16th St Mall refurbishment.
__________________
"You don't strike, you just go to work everyday and do your job real half-ass. That's the American way!" -Homer Simpson

All of us who are concerned for peace and triumph of reason and justice must be keenly aware how small an influence reason and honest good will exert upon events in the political field. ~Albert Einstein

Reply With Quote
     
     
  #6932  
Old Posted May 9, 2014, 12:08 AM
bcp's Avatar
bcp bcp is offline
BANNED
 
Join Date: Jul 2001
Posts: 5,143
Six hours total per day? This has the potential to.scare away people that want transit when they still have to schlep it over to 16th.....

Im glad we have this, but it's an awfully soft launch.
Reply With Quote
     
     
  #6933  
Old Posted May 11, 2014, 2:00 AM
Fritzdude Fritzdude is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,013
http://www.engadget.com/2014/05/09/solar-highway-indiegogo/?ncid=txtlnkusaolp00000589

Interesting idea by some Idaho inventors. Solar Powered panels designed for roads which provide power, create heat to melt snow, and provide framework for a smart grid to interact with electric vehicles. Could this be a viable replacement to our current roadwork boondoggle? Supposedly testing has proved they're durable enough to withstand traffic loads. I'd love to see CDOT experiment with a few miles of roadway somewhere.
Reply With Quote
     
     
  #6934  
Old Posted May 11, 2014, 4:00 PM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,718
How much does it cost? That's really the only thing that matters. It has to be cheaper than our existing roads, over the long term if not for straight up construction.
__________________
writing | twitter | bluesky | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #6935  
Old Posted May 11, 2014, 4:26 PM
denverryan's Avatar
denverryan denverryan is offline
Registered User
 
Join Date: Jun 2006
Posts: 169
While we're on the topic of maps, I'm obviously partial to the map I created a few years ago, which I never got around to finishing and updating because I have a really time-consuming job.

I'm convinced that altering the scale between downtown and the suburbs is the key way to make the map useful. The most recent RTD maps have headed more in this direction—maybe they even saw my map—but they don't take it far enough, I think.


Reply With Quote
     
     
  #6936  
Old Posted May 11, 2014, 5:13 PM
RyanD's Avatar
RyanD RyanD is offline
Fast. Fun. Frequent.
 
Join Date: Aug 2010
Location: Denver, Colorado
Posts: 2,988
Quote:
Originally Posted by Cirrus View Post
Wow.

I expect a lot of pictures.
Alright mister, to make up for not riding the Velocirfta you have:

Denver Union Station: Transit Center Grand Opening Part 1

Denver Union Station: Transit Center Grand Opening Part 2

Denver Union Station: Transit Center Grand Opening Part 3

With Part 4 and Part 5 coming in the next two days...

And as an added bonus:

Goodbye Market Street Station!

How 'bout them apples?
__________________
DenverInfill
DenverUrbanism
--------------------
Latest Photo Threads: Los Angeles | New Orleans | Denver: 2014 Megathread | Denver Time-Lapse Project For more photos check out: My Website and My Flickr Photostream
Reply With Quote
     
     
  #6937  
Old Posted May 11, 2014, 5:39 PM
CPVLIVE's Avatar
CPVLIVE CPVLIVE is offline
Registered User
 
Join Date: Sep 2006
Posts: 576
Interesting angle of the new hotel from the Denver Post -



(Hyoung Chang, The Denver Post)
Reply With Quote
     
     
  #6938  
Old Posted May 11, 2014, 6:50 PM
Fritzdude Fritzdude is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,013
Quote:
Originally Posted by Cirrus View Post
How much does it cost? That's really the only thing that matters. It has to be cheaper than our existing roads, over the long term if not for straight up construction.
Yeah.. they were admittingly vague on cost estimates, but it's probably due to what scaling can be projected on manufacturing volume, solar efficiencies gleaned, and other cost benefits that would be factored in. Such as, what is the benefit to the city of always having clear roads during the winter without needing snow plows? Fewer accidents and traffic jams as a result. How would you quantify that? It's definitely a paradigm shift that is interesting to think about.

There would be some tricky cost ratio formulas to work out. Lets say a mile of road costs 3 times more than current pavement estimates, but the solar energy captured is able to recoup that expense over 20 years..? When does it make sense to invest in unproven technologies? And who pushes this envelop? Private enterprise? Or more likely grants from the the Energy Dept to foster development. I think it's a fascinating idea.
Reply With Quote
     
     
  #6939  
Old Posted May 11, 2014, 7:59 PM
bunt_q's Avatar
bunt_q bunt_q is offline
Provincial Bumpkin
 
Join Date: Aug 2002
Location: Denver, CO
Posts: 13,203
We haven't been able to make solar powered street lights cost effective (except in the context of a nationbuilding boondoggle, where military officers are rated by their ability to spend money, but even then the things got a little dirty and stopped generating power unless you pay somebody to clean them.) If we can't make it work for something as simple as streetlights on a large-scale basis, roads seem a million years off.

There's nothing tricky about the calculations of the lifecycle cost savings. That's undergraduate engineering work. The trick is in the maintenance, and the politics of funding. Our roads today area perfect example. The choice between asphalt and concrete is driven in large part by funding sources - we can't fund maintenance for asphalt.
Reply With Quote
     
     
  #6940  
Old Posted May 12, 2014, 4:42 PM
Wizened Variations's Avatar
Wizened Variations Wizened Variations is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,611
A metaphor

Quote:
Originally Posted by bunt_q View Post
Our roads today area perfect example. The choice between asphalt and concrete is driven in large part by funding sources - we can't fund maintenance for asphalt.
Concrete is far more expensive per linear foot, particularly if done correctly: at least 8 inches thick with some rebar. However, well laid concrete lasts far longer binding sand and gravel than does asphalt. Asphalt, unless laid down upon properly designed expensive rubber(like) mats, is very vulnerable to water, and, it's evil ice twin.

The question, as you know, remains what road does one redo in concrete at a far higher cost than does one do in new asphalt or patch work, based upon some combination of taxes, possible bond issues, and, neighborhood political will.

The primary problem with redoing roads lined with businesses in concrete is the length of time. Businesses, particularly those not somewhat protected via franchise generally operate on quick receivables and 90 day payables. In essence, many operate on a 90 day cushion and, after those 90 days, either have to borrow money to service debt or increase cash flow, possibly via new long term tax credits that can lower the cost of borrowing that money. Regardless, most small businesses facing paralleling roads prefers asphalt resurfacing to rebuilding such roads with continuously cast concrete.

Concrete is not the best patch material, and, is far stronger when laid down full width.

This a metaphor for all infrastructure.
__________________
Good read on relationship between increasing number of freeway lanes and traffic

http://www.vtpi.org/gentraf.pdf
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 8:34 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.