Pics by me today - second skin being installed at Robson & Granville
(and still 3 levels of framing to be installed above - that'll be a while):
Steel columns being installed at the main entrance facing Georgia St.:
Additional level of curtain wall (and solid wall) being installed on the Georgia St. side
(and some odd steel framing on the level below - probably for marble cladding):