Old Posted Apr 29, 2014, 5:21 PM
EdFromOttawa EdFromOttawa is offline
Registered User
 
Join Date: Sep 2013
Posts: 365
Tour of TD Place Stadium with Ottawa media and mayor Jim Watson.

Official status is now 90% complete according to the construction company working on the site. The stadium will be complete well in advance of the July 18th official opening date.

http://www.ottawasun.com/2014/04/29/lansdowne-park-redevelopment-update

Some pics from the tour showing the seats now going into the lower bowl of the south side stands plus the bridge which will be connecting the south side and north side concourses on the east side of the stadium.











     
     
  #5742  
Old Posted Apr 29, 2014, 5:42 PM
king10 king10 is offline
Registered User
 
Join Date: Feb 2009
Location: Hamilton
Posts: 2,776
drew edwards tweets that the Hamilton stadium is now on schedule to be opened for the ticats opening home game
     
     
  #5743  
Old Posted Apr 29, 2014, 5:53 PM
osmo osmo is offline
Registered User
 
Join Date: Nov 2005
Posts: 1,717
Not sure about 90% for Landdowne but it's almost there. Mid/end June it looks like from the eye test. Hamilton is smoking the good stuff if they are saying that it will done by the Ti-Cats home opener.
     
     
  #5744  
Old Posted Apr 29, 2014, 6:02 PM
FrankieFlowerpot's Avatar
FrankieFlowerpot FrankieFlowerpot is offline
Registered User
 
Join Date: Aug 2012
Posts: 3,478
Sounds like seating will get underway soon in Hamilton - they've got most of the holes drilled for the seats and they need to apply a concrete sealer to the bleacher slabs before installation

Almost 350-400 people on site per day most of them doing mechanical and electrical works.
     
     
  #5745  
Old Posted Apr 29, 2014, 6:22 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
I wish them luck, but to me it seems unbelievable that TD Place - nevermind THF - will be ready for action in 2 1/2 months. But they are moving quickly, so fingers crossed.
     
     
  #5746  
Old Posted Apr 29, 2014, 7:46 PM
Fatty McButterpants Fatty McButterpants is offline
BANNED
 
Join Date: Jul 2013
Posts: 287
Nice pics of the new half of TD Place.

Spoiler Alert: The other half of the stadium is still old and ugly.
     
     
  #5747  
Old Posted Apr 29, 2014, 8:20 PM
EdFromOttawa EdFromOttawa is offline
Registered User
 
Join Date: Sep 2013
Posts: 365
Quote:
Originally Posted by Fatty McButterpants View Post
Nice pics of the new half of TD Place.

Spoiler Alert: The other half of the stadium is still old and ugly.


I'm guessing you haven't yet been to the site in person? The whole setup looks incredible already. Add in the park and all the planned trees and art pieces and it'll be a jewel of the CFL/NASL.
     
     
  #5748  
Old Posted Apr 29, 2014, 9:11 PM
blueandgoldguy blueandgoldguy is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,854
Quote:
Originally Posted by Fatty McButterpants View Post
Nice pics of the new half of TD Place.

Spoiler Alert: The other half of the stadium is still old and ugly.
Man you need to get over this obsession with the refurbished side of the stadium. Sure it would have been nice to have triple the budget to tear down the other side of the stadium and build something that mirrors the new side..plus a new 10,000 seat arena for the junior team, but that amount of public expenditure just can't be justified. As it is, Ottawa is getting a nicely updated stadium with comfortable wide seats and plenty of legroom, vastly improved concessions, state-of-the-art jumbotron, suites and club seats with their own separate concourse with nearly all the seats between the goal lines. I say that's a pretty nice upgrade over the old stadium, wouldn't you?
     
     
  #5749  
Old Posted Apr 29, 2014, 10:03 PM
Fatty McButterpants Fatty McButterpants is offline
BANNED
 
Join Date: Jul 2013
Posts: 287
Quote:
Originally Posted by blueandgoldguy View Post
Man you need to get over this obsession with the refurbished side of the stadium. Sure it would have been nice to have triple the budget to tear down the other side of the stadium and build something that mirrors the new side..plus a new 10,000 seat arena for the junior team, but that amount of public expenditure just can't be justified. As it is, Ottawa is getting a nicely updated stadium with comfortable wide seats and plenty of legroom, vastly improved concessions, state-of-the-art jumbotron, suites and club seats with their own separate concourse with nearly all the seats between the goal lines. I say that's a pretty nice upgrade over the old stadium, wouldn't you?
Yes, that's exactly what I would call it. A very nice upgrade. Nothing more, nothing less.
     
     
  #5750  
Old Posted Apr 30, 2014, 12:51 AM
king10 king10 is offline
Registered User
 
Join Date: Feb 2009
Location: Hamilton
Posts: 2,776
Quote:
Originally Posted by Fatty McButterpants View Post
Yes, that's exactly what I would call it. A very nice upgrade. Nothing more, nothing less.
then call it that and not "old and ugly," because that would be less
     
     
  #5751  
Old Posted Apr 30, 2014, 1:09 AM
elly63 elly63 is offline
Registered User
 
Join Date: Feb 2013
Posts: 9,783
Quote:
Originally Posted by king10 View Post
drew edwards tweets that the Hamilton stadium is now on schedule to be opened for the ticats opening home game
The media tour was cancelled due to the muddy, unsafe conditions on the construction site.

350-400 workers on site, almost double what it was previously. 10/12 hr work days for trades including Saturdays.

Working with building inspectors now to ensure opening day will be met. Bad weather days are factored in schedule and worked around and are not an issue unless you get a week in a row of bad days. Progress was made on delays (the six weeks worst case scenario) looks like three weeks worst case.

June 30th will not be the substantial completion date. They're working with the Cats to identify and complete critical areas that need to be completed.

Most seat holes are drilled and a coating needs to be applied to the slabs but seats should start being installed next week. The stadium will be substantially completed (defined in contract) meaning it can be occupied (with all the permits that go with that) by July 26.

Some finishing trades (painting, carpet, tile) will be doubleshifted (a second crew added for an additional shift). Likely between two and eight weeks after opening day to be officially completed. Concentration will be on life and safety systems to make sure people are safe on opening day, other things such as concessions are being identified as to how they will operate on opening day ie serve beer out of cans if taps not ready

IO says it's on budget, weather was the biggest factor contributing to the delay.

Ticats are working to be playing at THF on opening day. Cats are giving two tickets to a game to every on site worker. Ticats don't expect to implement Plan B.

Funny, nobody asked about the field.

Last edited by elly63; Apr 30, 2014 at 1:33 AM.
     
     
  #5752  
Old Posted Apr 30, 2014, 1:10 AM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is offline
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 7,493
Quote:
Originally Posted by EdFromOttawa View Post
Some pics from the tour showing the seats now going into the lower bowl of the south side stands plus the bridge which will be connecting the south side and north side concourses on the east side of the stadium.

That's interesting - does it cross the "longitude" line for the middle of the field, atop the berms that make up the grassy area on the east end?

It's like another field-level entrance.

Nice progress. I really hope to make it to a game there in the first or second season
     
     
  #5753  
Old Posted Apr 30, 2014, 2:04 AM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Good news from Edmonton... after three and a half decades with those annoying rounded-corner endzones, the Eskimos are finally going to have regulation endzones at Commonwealth Stadium.

Quote:
In fact, construction began this week to add corners to the end zones at Commonwealth Stadium, which had previously been rounded off at each end in order to accommodate a running track.


http://www.edmontonsun.com/2014/04/29/es...ealine-with-rounded-end-zone-as-a-player
     
     
  #5754  
Old Posted Apr 30, 2014, 2:56 AM
artvandelay's Avatar
artvandelay artvandelay is offline
Registered User
 
Join Date: Dec 2007
Location: The City of Cows
Posts: 1,670
Wow nice, so no more track?
     
     
  #5755  
Old Posted Apr 30, 2014, 5:51 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by esquire View Post
Good news from Edmonton... after three and a half decades with those annoying rounded-corner endzones, the Eskimos are finally going to have regulation endzones at Commonwealth Stadium.





http://www.edmontonsun.com/2014/04/29/es...ealine-with-rounded-end-zone-as-a-player
YES!!!
     
     
  #5756  
Old Posted Apr 30, 2014, 7:26 AM
osmo osmo is offline
Registered User
 
Join Date: Nov 2005
Posts: 1,717
So if the track is gone?

Why not put back in grass? -_-
     
     
  #5757  
Old Posted Apr 30, 2014, 8:21 AM
elly63 elly63 is offline
Registered User
 
Join Date: Feb 2013
Posts: 9,783
New stadium will be ready for Ticats home opener: builder
Drew Edwards The Scratching Post April 29/2014

The new Hamilton stadium will be ready in time for the Ticats home owner, the builder announced on Tuesday

Garreth Barkey, site supervisor for Ontario Sports Solutions, the consortium building the $145-million stadium, said he expects to have the facility prepared for the July 26 game versus the Ottawa Redblacks.

"I'm confident that we're going to make the date," Barkey said.

The stadium is about three weeks behind schedule, Barkey said, and while it was originally slated to be delivered by June 30, Barkey acknowledged they won't hit that target. Instead, they are aiming for "substantial completion" in late July with the finishing touches added over the ensuing two to eight weeks.

"Substantial completion means you're watching a game in the stadium," Barkey said "There could some areas that need a final coat of paint, some of the exterior landscaping may not be planted but as a fan, you'll come and see the Ticats and enjoy a good fan experience."

Ticat team president Glenn Gibson said he doesn't think fans will mind if the stadium is still in need of a little spit and polish.

"I think 80 per cent of fan enjoyment comes from seeing our team win - that's a strong pull towards customer satisfaction," Gibson said. "I think the other 20 per cent is amenities, food and beverage and things like that.

"I think fans are just going to be so happy to be in a stadium, they'll be forgiving on the little things."
     
     
  #5758  
Old Posted May 1, 2014, 3:14 AM
Jaws Jaws is offline
Registered User
 
Join Date: Mar 2009
Posts: 1,360
Quote:
Originally Posted by osmo View Post
So if the track is gone?

Why not put back in grass? -_-
No relationship between the track and grass. Grass was too expensive to maintain.
     
     
  #5759  
Old Posted May 1, 2014, 5:38 AM
isaidso isaidso is offline
North of Gilead
 
Join Date: Dec 2008
Location: North of Gilead
Posts: 11,071
Ottawa's stadium looks great except for that press box. It wrecks what's otherwise a beautiful grand stand. It's many notches down from the rest of the build and looks like a complete after thought.

Quote:
Originally Posted by esquire View Post
Good news from Edmonton... after three and a half decades with those annoying rounded-corner endzones, the Eskimos are finally going to have regulation endzones at Commonwealth Stadium.
And it only took 35 years.
__________________
ELBOWS UP CANADA, ELBOWS UP UKRAINE, ELBOWS UP GREENLAND
CANADA, EUROPE, NZ, AUSTRALIA, JAPAN, MEXICO STRONG

US REPUBLICANS/MAGA/ICE NOT WELCOME HERE, STAY OUT
     
     
  #5760  
Old Posted May 1, 2014, 1:00 PM
Dalreg's Avatar
Dalreg Dalreg is offline
Registered User
 
Join Date: Mar 2006
Location: Somewhere over the rainbow
Posts: 2,002
Hate to see the track go in Edmonton, at least with turf it can be quickly removed and the running track re installed.
__________________
Blow this popsicle stand
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 9:29 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.