Quote:
Originally Posted by VIce
With current infrastructure? Nope. Headway on 7th ave is close to 120 seconds during rush hour (5 minutes on blue line, 3-5 minutes on red line), which is remarkable given the at-grade crossings, and suffers from serious congestion at the switching locations at both ends of downtown. Given the 8th ave subway one day, both lines could be reduced to 120 seconds considering only downtown limitations, but then they'd have serious congestion near at-grade intersections outside of the downtown core (Heritage drive would need grade separation, and 36th street might have some serious pinch points of its own, etc.)
Basically we're at the point where all the low-hanging fruit have disappeared, and the next LRT improvement will be billions.
|
Just a couple minor points:
7 Ave will not be able to manage the same headways with four car trains as with four car trains.
An 8 Ave Subway with modern signalling, when taken in isolation, would be able to beat 120 second headways; 90 should be doable.
I would also add that post construction of the 8 Ave Subway, capacity boosts to the NW-S line will return to affordability very quickly. Heritage Drive and 25 Avenue would likely pose immediate issues and need to be addressed concurrently with Subway construction, unless Roads builds interchanges first, but the proposed interchanges are not overly complex and wouldn't break the bank. After that though we'll have plenty of spare capacity and additional capacity boosts won't cost much. Five car trains would mean rebuilding SAIT and 39 Ave, minor track realignments, and platform extensions. It would be comparable to the current move from three to four cars.
The NW-S line is, outside of downtown, just ridiculously close to being grade separated. It wouldn't even be that expensive to grade separate it. The W-NE line is different. Large portions of it, pretty much all of 36 St, would need to be completely rebuilt.