Old Posted Apr 4, 2014, 8:30 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by GlassCity View Post
I should've been more clear, I mean specifically the part between VCC-Clark and Lougheed. From what I understand now it was just to connect Coquitlam to Vancouver?
In a way you are correct. While one of the purposes of the line is to connect the upcoming evergreen line. It was also built to help take some of the burden off the older expo line.

The section between columbia and waterfront on the expo line. Would be unable to handle hte number of trains that will be required from surrey if the trains from coquitlam were forced to from lougheed to columbia and then onto waterfront. The system would of be saturated.

So the millenium line was built between lougheed and vcc-clark to have the trains from coquitlam not use the expo line.
     
     
  #11802  
Old Posted Apr 4, 2014, 8:34 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by cabotp View Post
In a way you are correct. While one of the purposes of the line is to connect the upcoming evergreen line. It was also built to help take some of the burden off the older expo line.

The section between columbia and waterfront on the expo line. Would be unable to handle hte number of trains that will be required from surrey if the trains from coquitlam were forced to from lougheed to columbia and then onto waterfront. The system would of be saturated.

So the millenium line was built between lougheed and vcc-clark to have the trains from coquitlam not use the expo line.
Yeah, that makes sense, thanks a lot. It's too bad there isn't an actual arterial street that goes across northern Burnaby for a more urban transit line.
     
     
  #11803  
Old Posted Apr 4, 2014, 9:12 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,726
Quote:
Originally Posted by GlassCity View Post
I should've been more clear, I mean specifically the part between VCC-Clark and Lougheed. From what I understand now it was just to connect Coquitlam to Vancouver?
Oops. I misread 'why' as 'when'.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #11804  
Old Posted Apr 4, 2014, 9:39 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,124
The biggest issue with the Millenium line is that it was supposed to go part and parcel with Evergreen. Evergreen had the feet dragged on for over a decade though and the majority of that stretch is not really going to be hugely built up. Burnaby is focusing nearly all efforts on Brentwood and Metrotown.

Lougheed has some density but that's from 20+ years ago and there really weren't any plans to do anything else until Evergreen got the official go ahead. The only reason you've seen more projects and hype around Lougheed is because of Evergreen.

The rest of the stretch between points is largely low density industrial. When Evergreen is complete it will make more sense as a line imo. I still think it was a good idea to build the line even with the lower ridership numbers because it is accommodating for the future and it has sparked a focus on Brentwood which I don't think would have had anywhere the drive it does these days had it not received access to Millenium line.
     
     
  #11805  
Old Posted Apr 4, 2014, 11:17 PM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
$50 million surplus... mmm... and yet less ridership than last year. Most of it is also due to fare increases...

Q: If TransLink gets a surplus, how are the extra funds then distributed? Are there public consultations on such, or is it decided by the board?

My wishlist would be to see these funds redirected towards accelerated fleet replacement (buses), fleet refurbishment/replacement (SkyTrain), and also increased SkyTrain track maintenance. Why? Because TransLink often gets into a storm when buses or SkyTrain breaks down, and that's just bad for publicity.
     
     
  #11806  
Old Posted Apr 5, 2014, 1:33 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
Quote:
Originally Posted by GlassCity View Post
Would anybody mind telling me why the Milennium Line was built? I was very young and had just move to Canada when it was completed. Looking at it now it just seems like a really stupid place to put a rapid transit line, and the ridership reflects that.
The 1996 Livable Region Strategic Plan set out the rapid transit corrdiors for the region:


http://tinypic.com/view.php?pic=68iysms&s=1

The Millennium Line was a part of the "T-Line" connecting New West, Burnaby and Coquitlam - the Evergreen Line being one leg.

Before the 1996 LRSP, plans such as these (serving Coquitlam via a branch off the Expo Line) were proposed by the "then in control" BC Transit. They eventually decided that the additional capacity offered by a separate line was better.

Quote:
Originally Posted by officedweller View Post

++++++++++++

Guess its time to haul out the old Province newspaper articles again - dating from 1990. So remember that these
PREDATE Translink, the LRSP, the Westcoast Express and the M-Line.





     
     
  #11807  
Old Posted Apr 10, 2014, 4:29 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
Check this out. Here's Advanta's page on the design process they did for the next generation of INNOVIA Metro (SkyTrain) vehicles

http://advantadesign.com/64-bombardier-page/bombardier-acticle/112-innovia-300-for-bombardier.html
     
     
  #11808  
Old Posted Apr 10, 2014, 6:30 AM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Quote:
Originally Posted by xd_1771 View Post
Check this out. Here's Advanta's page on the design process they did for the next generation of INNOVIA Metro (SkyTrain) vehicles

http://advantadesign.com/64-bombardier-page/bombardier-acticle/112-innovia-300-for-bombardier.html
Nice find!
     
     
  #11809  
Old Posted Apr 10, 2014, 7:44 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
Agreed! Nice find!
     
     
  #11810  
Old Posted Apr 21, 2014, 4:43 AM
gillty gillty is offline
Registered User
 
Join Date: Jun 2009
Location: Hyogo, Japan / Vancouver
Posts: 182
Looks like Brentwood Station will be getting a new elevator, I'm assuming this will be for the south street level access, should be a welcome improvement for those affected by the new 123 and 25 bay configuration.

Quote:
Coun. Pietro Calendino said construction naturally causes inconvenience but noted there will be benefits to transit users. The distance to the SkyTrain station from new bus stops will be shorter than those for the bus loop. And the developer is giving money to TransLink to build a new elevator to the station to improve access for people with disabilities.
http://www.burnabynewsleader.com/news/255660501.html
     
     
  #11811  
Old Posted Apr 21, 2014, 9:18 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by xd_1771 View Post
Check this out. Here's Advanta's page on the design process they did for the next generation of INNOVIA Metro (SkyTrain) vehicles

http://advantadesign.com/64-bombardier-page/bombardier-acticle/112-innovia-300-for-bombardier.html
Is it too late to get the noses of the new four-car Mk.III sets changed to this design?
Would be nice to have the new four-car sets with a distinct look from the older two-car sets - different and 'more whoooosh' even standing still.

Last edited by jsbertram; Apr 22, 2014 at 12:28 AM.
     
     
  #11812  
Old Posted Apr 21, 2014, 9:32 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,726
^ My recollection is that the order for 28 cars for the Evergreen Line system expansion is for the Mk3 model and that they would likely be configured into 4-car trains for a total of 7 4-car Mk3 trains. I can't source that, but I've been walking around with that in mind after having read it somewhere. The 4-car trains would run exclusively on the Expo Line 'mainline' and I would expect that the Evergreen Line would likely receive a mixed fleet of Mk1 and Mk2s, just the like the Expo and Millennium lines.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #11813  
Old Posted Apr 22, 2014, 3:52 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
Quote:
Originally Posted by jsbertram View Post
Is it too late to get the noses of the new four-car Mk.III sets changed to this design?
Would be nice to have the new four-car sets with a distinct look from the older two-car sets - different and 'more whoooosh' even standing still.
This is the design.

@SFUVancouver: The Evergreen Line Project Team themselves confirmed that on Facebook.
     
     
  #11814  
Old Posted Apr 22, 2014, 4:49 AM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
What will the capacity of Mark 3 trans be?
     
     
  #11815  
Old Posted Apr 22, 2014, 7:30 AM
Meraki Meraki is offline
Registered User
 
Join Date: Mar 2012
Posts: 473
Quote:
Originally Posted by Gordon View Post
What will the capacity of Mark 3 trans be?
Probably slightly more than the current Mk. II revised set. As far as we know they'll keep the same 2 by 1 seating, but gaining some standing room replacing the coupling between the trainsets with open space.
     
     
  #11816  
Old Posted Apr 22, 2014, 7:39 PM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
If any of the concepts are correct, there will be a revised seating plan with a new mix of front/rear-facing and side-facing seating which may allow for more capacity - plus there will be wider walkways between train cars, and one more walkway than usual (4-car train)
     
     
  #11817  
Old Posted Apr 22, 2014, 8:04 PM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
will the mark3s be 4 cars be 2 married pairs or 1 articulated 4 car unit?
     
     
  #11818  
Old Posted Apr 22, 2014, 9:03 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
We're expecting a full 4-car articulated train for the MKIII - but we're wondering about a maintenance facility that it can fit into.
When oornto got its articulated Rocket trains, it had to uild a new maintenace facility.
     
     
  #11819  
Old Posted Apr 22, 2014, 9:16 PM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,180
What are the lengths of these trains? I presume these 4 car sets can be configured to accept another car to increase capacity down the road.
     
     
  #11820  
Old Posted Apr 23, 2014, 2:11 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by logan5 View Post
What are the lengths of these trains? I presume these 4 car sets can be configured to accept another car to increase capacity down the road.
The current Expo and Millennium platforms are a minimum of 250 Ft (80 M), so they are limited to 6-car Mk.I (A-B married pairs in A-B + A-B + A-B configuration) or 4-car Mk.II / Mk.III (A-B married pairs in A-B + A-B configuration) trains.

The new 4-car Mk.III train sets (in A-C-C-B configuration) might have room on the platforms to allow for a 5th middle car to be added in the future (in A-C-C-C-B configuration), but until then the new 4-car Mk.III set will be slightly shorter than 2 Mk.II sets joined together.

It is suspected that a 5-car Mk.III train set would have its first and last doors right at the platform ends (with the front and back ends of the train beyond the ends of the platform), which may disturb some people.

There are plans to have all Expo and Millennium platforms extended to 100 metres to accommodate longer trains in the future, so 5- and 6- car Mk.III trains may appear only after all the platform extensions are done.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:54 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.