  #2141  
Old Posted Mar 20, 2014, 2:11 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
The records don't phase a true Rider fan. It hurts but we stick through it! Go Riders Go!
Reply With Quote
     
     
  #2142  
Old Posted Mar 20, 2014, 10:54 PM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
This site will see lots of action in August by the looks of the construction schedule.
Reply With Quote
     
     
  #2143  
Old Posted Mar 21, 2014, 1:33 PM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
Quote:
Originally Posted by dsmmace View Post
This site will see lots of action in August by the looks of the construction schedule.
I wonder how many construction cranes are going t be at this site
Reply With Quote
     
     
  #2144  
Old Posted Mar 21, 2014, 5:25 PM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Quote:
Originally Posted by thefourthtower View Post
I wonder how many construction cranes are going t be at this site
A [tower crane operator] buddy of mine figures two (with rails); I think it'll be four.
Reply With Quote
     
     
  #2145  
Old Posted Mar 21, 2014, 7:07 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,085
Quote:
Originally Posted by SkydivePilot View Post
A [tower crane operator] buddy of mine figures two (with rails); I think it'll be four.
I believe they used a lot of mobile cranes at IGF.
Reply With Quote
     
     
  #2146  
Old Posted Mar 30, 2014, 4:16 PM
Migs Migs is offline
BANNED
 
Join Date: Dec 2006
Location: Regina, Sk, Canada
Posts: 3,774
Confirmed: the design of the Regina stadium will be publically released the 1st or 2nd week of May.
Reply With Quote
     
     
  #2147  
Old Posted Mar 30, 2014, 5:50 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Quote:
Originally Posted by Migs View Post
Confirmed: the design of the Regina stadium will be publically released the 1st or 2nd week of May.
Can't wait for this official announcement.
Reply With Quote
     
     
  #2148  
Old Posted Mar 30, 2014, 7:26 PM
Dougler306 Dougler306 is offline
Registered User
 
Join Date: Oct 2011
Location: Regina
Posts: 468
I'm truly expecting something that will blow me away!! We as rider fans have waited for this for such a long time. I sure hope we didn't cheep out in anyways like we do for most projects in SK. We need to have the best of something between Toronto and Vancouver..
Reply With Quote
     
     
  #2149  
Old Posted Mar 30, 2014, 7:45 PM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
Quote:
Originally Posted by Dougler306 View Post
I'm truly expecting something that will blow me away!! We as rider fans have waited for this for such a long time. I sure hope we didn't cheep out in anyways like we do for most projects in SK. We need to have the best of something between Toronto and Vancouver..
From what I was told don't expect to ----
Reply With Quote
     
     
  #2150  
Old Posted Mar 30, 2014, 9:48 PM
Migs Migs is offline
BANNED
 
Join Date: Dec 2006
Location: Regina, Sk, Canada
Posts: 3,774
Quote:
Originally Posted by thefourthtower View Post
From what I was told don't expect to ----
You've been told by who?
Reply With Quote
     
     
  #2151  
Old Posted Mar 31, 2014, 3:19 AM
cebubu's Avatar
cebubu cebubu is offline
Registered User
 
Join Date: Jul 2009
Posts: 138
Quote:
Originally Posted by Migs View Post
You've been told by who?
His poker buddies
Reply With Quote
     
     
  #2152  
Old Posted Apr 1, 2014, 5:09 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
I had recently heard that the construction budget for the stadium is only around 180M of the 278M dollar cost. The rest would be for site preparation, and servicing. As well as, paying for the consultants costs.

Also that if the stadium were to be built like the rendering depicted earlier in 2013 it would have been around double the original budget not 278M. So I would expect a stadium that is similar to Winnipeg's.
Reply With Quote
     
     
  #2153  
Old Posted Apr 1, 2014, 10:47 PM
dsmmace dsmmace is offline
Registered User
 
Join Date: Jun 2012
Location: Saskatoon
Posts: 423
You can suspect all you guys want, we won't see anything until a full award is given to PCL. Until then, PCL in particular will not share anything with the general public.
Reply With Quote
     
     
  #2154  
Old Posted Apr 1, 2014, 11:43 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,085
Quote:
Originally Posted by North_Regina_Boy View Post
I had recently heard that the construction budget for the stadium is only around 180M of the 278M dollar cost. The rest would be for site preparation, and servicing. As well as, paying for the consultants costs.

Also that if the stadium were to be built like the rendering depicted earlier in 2013 it would have been around double the original budget not 278M. So I would expect a stadium that is similar to Winnipeg's.

I do not believe it could be anywhere near that high. Plus every project including IGF has site prep and consultants fees built into its cost. the original 2010 dome design had these cost estimates:

Construction cost $319.6 million
Furniture, fixtures and equipment: 10.8 million
Land, consulting and fit-out costs: 60.8 million
PST remission credit ($5 million)

Total facility cost: $386.2 million

So about 16%. $11 million was for storm sewer issues. I am not sure the new site has those problems. Also "fit-out" is really part of the facility - TV's, amenities, art, furniture, garbage cans and so on. Architects alone can be 7%
Reply With Quote
     
     
  #2155  
Old Posted Apr 2, 2014, 12:21 AM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by Stormer View Post
I do not believe it could be anywhere near that high. Plus every project including IGF has site prep and consultants fees built into its cost. the original 2010 dome design had these cost estimates:

Construction cost $319.6 million
Furniture, fixtures and equipment: 10.8 million
Land, consulting and fit-out costs: 60.8 million
PST remission credit ($5 million)

Total facility cost: $386.2 million

So about 16%. $11 million was for storm sewer issues. I am not sure the new site has those problems. Also "fit-out" is really part of the facility - TV's, amenities, art, furniture, garbage cans and so on. Architects alone can be 7%
Architects fees are based on how much the building cost is. 7% for the first amount 5% for the next 3% for the next and so on.
Reply With Quote
     
     
  #2156  
Old Posted Apr 2, 2014, 2:12 AM
Udon'tknow's Avatar
Udon'tknow Udon'tknow is offline
Registered User
 
Join Date: Oct 2011
Posts: 360
Reply With Quote
     
     
  #2157  
Old Posted Apr 10, 2014, 7:30 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,085
City Administration Report for Monday's Council meeting says:

Site prep is $28.2 million and Stadium is $250 million

Also:

Capital Cost Capital Funding
Provincial Grant 80.0
Provincial Loan 100.0
SRFC 25.0
City Land Contribution 3.3
City Cash 2.5
City Loan 67.4

Total Capital Cost 278.2 Total Capital Funding Sources 278.2
Reply With Quote
     
     
  #2158  
Old Posted Apr 10, 2014, 8:13 PM
Migs Migs is offline
BANNED
 
Join Date: Dec 2006
Location: Regina, Sk, Canada
Posts: 3,774
I set up a twitter acct to take daily photos of the construction site. Give it a follow, lots of activity down there at Evraz Place this morning.

http://www.twitter.com/YQRstadium
Reply With Quote
     
     
  #2159  
Old Posted Apr 10, 2014, 8:20 PM
Dan0myte Dan0myte is offline
Registered User
 
Join Date: Jul 2009
Posts: 927
Quote:
Originally Posted by Migs View Post
I set up a twitter acct to take daily photos of the construction site. Give it a follow, lots of activity down there at Evraz Place this morning.

http://www.twitter.com/YQRstadium
Good work!
Reply With Quote
     
     
  #2160  
Old Posted Apr 10, 2014, 8:21 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by Migs View Post
I set up a twitter acct to take daily photos of the construction site. Give it a follow, lots of activity down there at Evraz Place this morning.

http://www.twitter.com/YQRstadium
Thanks Migs! Will do!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:15 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.