Latest Ottawa stadium pics.

Work continues at the south stands, on the east end.

The top sections of the Veil that will curve over the south stands are now being assembled on the ground.

Workers assemble the top sections of the Veil.

The new media box at the top of the south stands is fully enclosed and windows are installed.

The view of the field and north stands from the new media box.

A section of the new seating bowl at the front of the south stands is built.

At the north stands, the work on new field level seating continues.

The new buildings along Bank Street are taking shape.

The main concourse in the stadium is getting a new coat of paint.