Quote:
Originally Posted by J.OT13 View Post
I agree, considering the population back then, Calgary made the right call leaving the downtown tunnel for a later date, but I think that later date might be a bit overdue.
It is. The Red and Blue lines interline at 7th avenue. During rush hour there is congestion at the switching at both ends, and the rest is signalling limited (120 second combined headway) - not at all helped by the fact that this is the only section of the system that occasionally yields to crossing traffic.

Thus, the South leg of the red line is at capacity - cars are loaded beyond nameplate capacity, and are at their signalling limited headway. rains are being extended to 100m (or like, 90-something), but that capacity will be eaten up quickly. The only option for increasing Red line capacity to the south is by separating the Red and Blue lines.
     
     
  #3962  
Old Posted Mar 12, 2014, 1:58 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,020
SE-LRT refersher, start 2015/16, opens 2020.

SE-LRT images from Edmonton


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935364.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935448.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935447.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935446.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935445.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935444.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935420.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935363.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935365.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935366.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935367.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935368.jpg?size=620x400s)


(http://www.edmontonjournal.com/news/edmonton/cms/binary/8935369.jpg?size=620x400s)

http://www.edmontonjournal.com/news/edmonton/Photos+Southeast+taking+shape/8935382/story.html
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #3963  
Old Posted Mar 13, 2014, 5:16 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
From the Metrolinx Homepage.... UPX Construction Update from Union Station

     
     
  #3964  
Old Posted Mar 17, 2014, 3:44 PM
Daveography's Avatar
Daveography Daveography is offline
Klatuu Barada Nikto
 
Join Date: Sep 2007
Location: The Island of Misfit Architecture
Posts: 4,483
Edmonton's new MacEwan LRT station (which will also serve the new Arena), just about ready to go:


MacEwan Station by Daveography.ca, on Flickr
     
     
  #3965  
Old Posted Mar 17, 2014, 7:42 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,131
Not sure if anyone in the Canada section would care, but have been working on this for quite some time now, so I'm posting it anyway.

This is what I think is a realistic vision for Vancouver's skytrain system in 2040 (or before depending on investment levels). All lines are grade seperated skytrain or similar tech with the exception of the Surrey LRT which would run at grade and be similar to Portland or Calgary's systems.


Larger Version


Rough buildout would be:

2016 - Evergreen to Coquitlam
2020 - E/M Line to UBC
2023 - Expo Line Extension
2027 - Hastings Line
2030 - Surrey LRT
2033 - Millennium Line
2038 - Canada Line Extension
2040 - Crosstown Line

This buildout would represent a similar rapid transit capital expenditure per year as Vancouver has currently been seeing, which I feel is pretty conservative since the region will be growing denser and transit will be growing as a mode share.

I have not included express bus, westcoast express or any streetcar programs since I didn't want to clutter the map, however they would naturally compliment the system.

Enjoy
     
     
  #3966  
Old Posted Mar 17, 2014, 7:53 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
It will be pretty damn sweet to be able to take the Skytrain straight to the beaches on Point Grey!

No Canada Line extension under Burrard Inlet to North Van and up Lonsdale? Dang.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #3967  
Old Posted Mar 17, 2014, 8:46 PM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Great map and not unrealistic either, producing a very extensive system.

May I ask what software you used to generate it?
     
     
  #3968  
Old Posted Mar 17, 2014, 10:33 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,131
Thanks for the comments. The program is a really bare bones web based program:
http://beno.org.uk/metromapcreator/#

It has almost no features and is really finicky, but works well enough to make a simple map like this. Would love to see others take a crack at their cities!

Quote:
Originally Posted by Chadillaccc View Post
No Canada Line extension under Burrard Inlet to North Van and up Lonsdale? Dang.
It was discussed a while back in the vancouver local, apparently Burrard Inlet is so deep it's almost physically impossible. Seabus will have to do for now.
     
     
  #3969  
Old Posted Mar 17, 2014, 11:35 PM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,425
Aren't there tunnel designs that float and are suspended from the bottom of the waterbody? Maybe something like that would work in Vancouver.
     
     
  #3970  
Old Posted Mar 17, 2014, 11:39 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Metrolinx had some spare time like Leftcoaster.. they are dreaming. And put it in their advertising campaign across the city.



From the Metrolinx Homepage

The High Resolution Is Here:

http://bit.ly/1p3ydZ6
     
     
  #3971  
Old Posted Mar 17, 2014, 11:48 PM
MonkeyRonin's Avatar
MonkeyRonin MonkeyRonin is online now
¥ ¥ ¥
 
Join Date: Sep 2006
Location: Vancouver
Posts: 10,619
Or...a bridge. The Crosstown Line could be extended from Willingdon up to North & West Vancouver. It'd only need a ~500 m bridge there. Or a spur from the Hastings Line crossing over further to the west.

I wonder if it'd also be possible to build a lower deck on the Lion's Gate Bridge and run trains to the North Shore through there instead.
__________________
     
     
  #3972  
Old Posted Mar 18, 2014, 1:29 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by caltrane74 View Post
Metrolinx had some spare time like Leftcoaster.. they are dreaming. And put it in their advertising campaign across the city.



From the Metrolinx Homepage

The High Resolution Is Here:

http://bit.ly/1p3ydZ6
That's pretty cool - it's actually quite rare to see these sort of grand visions from transit bodies.

Leftcoaster Thanks! I'd actually already seen that and had a brief play, but yours looked way better than my results so I assumed you must have had something more advanced .
     
     
  #3973  
Old Posted Mar 18, 2014, 1:38 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Sorry double post please delete!
     
     
  #3974  
Old Posted Mar 18, 2014, 2:01 AM
ozonemania ozonemania is offline
Registered User
 
Join Date: Sep 2007
Posts: 678
Quote:
Originally Posted by MonkeyRonin View Post
Or...a bridge. The Crosstown Line could be extended from Willingdon up to North & West Vancouver. It'd only need a ~500 m bridge there. Or a spur from the Hastings Line crossing over further to the west.

I wonder if it'd also be possible to build a lower deck on the Lion's Gate Bridge and run trains to the North Shore through there instead.
It's possible that Lions Gate could be repurposed for transit/RRT as it nears the end of its current lifespan. That is decades out I'm sure, but by that time a 3rd crossing and a tunnel/bridge across the Burrard Inlet might be justified. Especially if North Van keeps upping their densities. It's doubtful the Lions Gate's supports, as it is, would be able to handle a second deck or higher capacities than it is now.
     
     
  #3975  
Old Posted Mar 18, 2014, 6:54 AM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,912
The Lion's gate's days are numbered as it will close to traffic around 2030.

The Lion's Gate was built with private money and given a 100 year lease to have the causeway thru Stanley park. Much to the dislike of Victoria, the Parks Board has said that there will be no extensions and even Victoria and City Hall cannot override them...............the causeway will be gone. The Parks Board has said that they may keep it open for buses, bikes, and pedestrians but that's it. They are very legitimately saying that the City and province have had 100 years to get a replacement and it's not their responsibility to have to bail them out due to their lack of forethought.

Whatever they do it is going to cost a small fortune. A main Street extension via a tunnel to North Vancouver has been suggested by North Vancouver doesn't want it because they rightfully say that there would be no where for all the traffic to go once it gets there as the roads are already clogged and the TCH is 2km away thru a very densely populated area.

North Vancouver has said it would consider a widening or even twinning of the iron Workers from 6 to maybe 10 lanes but only if a SkyTrain connection is made to North Vancouver Quay to rid the city of the Seabus. Of course the problem with that is that it would be very out of the way for West Vancouver and would leave only one bridge to the North Shore and the routes to it both from the North Shore and downtown Vancouver would be horribly backed up.

It would also mean that any accident on the bridge would leave the entire North Shore and routes to Squamish, Sunshine Coast, Whistler, and ferries to Nanaimo completely cut off.

No matter what they do it is going to be a horrid political battle all because Vancouver and Victoria have ignored the problem for so long and incredibly bad transportation planning.
     
     
  #3976  
Old Posted Mar 18, 2014, 7:25 AM
logan5's Avatar
logan5 logan5 is online now
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,146
Main St. to Fell Ave. where the auto mall is. Lots of room. Lots of street connections, and it splits the difference between North and West Vancouver.
     
     
  #3977  
Old Posted Mar 18, 2014, 4:18 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Agreed with Logan. If all other options are shit, choose the lesser evil... which happens to be the most effective one too!
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #3978  
Old Posted Mar 18, 2014, 8:32 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,833
The province announced all day GO service to Kitchener today, with a phase 1 of 2 additional trains opening in 2016, and all day service starting at an unspecified date (presumably when the portion of the line through Brampton gets it, which is supposed to be late 2010's or early 2020's). I presume it will be paid for by expanding the transit taxes to KWC.
     
     
  #3979  
Old Posted Mar 18, 2014, 9:53 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
This is a good start. Minor improvements like this may end up going a long way when service and traffic on the lines picks up.
     
     
  #3980  
Old Posted Mar 18, 2014, 11:31 PM
WhipperSnapper's Avatar
WhipperSnapper WhipperSnapper is offline
I am the law!
 
Join Date: Sep 2002
Location: Toronto+
Posts: 22,892
Train service? That's a heavy freight corridor. Go would have to build their own lines.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 10:20 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.