HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #7861  
Old Posted Mar 13, 2014, 5:14 AM
H.E.Pennypacker's Avatar
H.E.Pennypacker H.E.Pennypacker is offline
Registered User
 
Join Date: May 2013
Posts: 1,941
Quote:
Originally Posted by milomilo View Post
Higher capacity and fleet interchangeability are two benefits. Is there going to be any street running? I don't think there is any on the SE section where the route is fairly well developed, and I believe the north of Beddington Trail section has been given a right of way, leaving only the northern section of Centre Street undecided (assuming the underground option is taken) to potentially be running on-street. Even so, I wouldn't call that mostly.

Fuzz has pretty much lined out why I disagree with that particular decision. Additionally, whatever we build now will be permanent and with us for decades, potentially centuries. Let's get it right.
Pretty much sums up my thoughts exactly .. Underground please
     
     
  #7862  
Old Posted Mar 13, 2014, 5:40 AM
Policy Wonk's Avatar
Policy Wonk Policy Wonk is offline
Inflatable Hippo
 
Join Date: Mar 2006
Location: Suburban Las Vegas
Posts: 4,015
Is nothing being built instead an acceptable outcome to you?

This is the city that can't get the 8th Ave tunnel built, and talking about a tunnel to Beddington Trail, or even 16th Ave for that matter is to be taken seriously?
__________________
Public Administration 101: Keep your mouth shut until obligated otherwise and don't get in public debates with housewives.
     
     
  #7863  
Old Posted Mar 13, 2014, 7:16 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Quote:
Originally Posted by Cage View Post
Your URL indicates Number 3 road in Richmond. Prior to RAV line buildout, 3 road was six lanes wide, post RAV line its four lanes wide, so this confirms that elevated guideway would takeup at least 2 lanes.

The big question is how could at grade only take up 2 lanes, even considering low floor LRT option?
Well not necessarily, it confirms that after they put in the skytrain they reduced the lanes to 4. It looks like about 1 lane for the train+bike lane, and more than one lane for a much larger sidewalk:



(pre and post skytrain, the new sidewalk is more than a full car lane in width)



Huge sidewalk compared to the old one



Bike lane




I mean you can clearly see from this last photo that the supports for the track are not even a 1 car lane in width.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #7864  
Old Posted Mar 13, 2014, 9:27 AM
Policy Wonk's Avatar
Policy Wonk Policy Wonk is offline
Inflatable Hippo
 
Join Date: Mar 2006
Location: Suburban Las Vegas
Posts: 4,015
An elevated ROW casting a shadow on people's front yards will be a very tough sell.
__________________
Public Administration 101: Keep your mouth shut until obligated otherwise and don't get in public debates with housewives.
     
     
  #7865  
Old Posted Mar 13, 2014, 3:01 PM
joe498 joe498 is offline
Registered User
 
Join Date: Aug 2013
Posts: 295
So am I correct in assuming the SE / NC - LRT / Busway will be built in stages starting from the core outwards or is it to all be built at once to the far out suburbs?

Calgary would benefit much more rapidly if they were to build the SE LRT / Busway to Quarry and worry about the deep south later when more funding arrives.

I just don't like the time frames I am hearing, the last thing we need is a SW Stoney Trail like Saga. (60 years)
     
     
  #7866  
Old Posted Mar 13, 2014, 3:15 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
What needs to happen is both subways under construction by 2020, both Eighth Avenue and 2nd Street Subways done by 2023 or 2024. Then build out the suburban 203 line from there, with completion from Quarry Park to Mcknight in the first phase around 2027 or 2028.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #7867  
Old Posted Mar 13, 2014, 3:23 PM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
I'm just happy I can ride my bike 8 months of the year, given the time frames. In 10 years with 25% growth, its going to be impossible to move around the core without work starting ASAP. HARPER and REDFORD send money!
     
     
  #7868  
Old Posted Mar 13, 2014, 3:36 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by Fuzz View Post
I'm just happy I can ride my bike 8 months of the year, given the time frames. In 10 years with 25% growth, its going to be impossible to move around the core without work starting ASAP. HARPER and REDFORD send money!
Agreed. You are going to see more and more people shift to walking and cycling within 5 km of the core. It is the only way to pack more people down there in the absence of serious commitment for transit from other levels of government, akin to how committed the province is to building the Ring Roads. Serious, multi-billion, multi-year transit funding is the only source.

While we are waiting for that (i.e. forever), I am happy on my bike and feet
     
     
  #7869  
Old Posted Mar 13, 2014, 4:06 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
To everyone, please go read the full reports before making your opinions up

Low Floor - From 16th north is planned as an in-street lrt, in the southern end (130th south) it will be a similar situation where the train runs beside the roadway. In both these situations it is far better to have a low floor system. Given the modal split on center is over over 60% public transit and only going to increase, not to mention that once the dedicated bus lanes go in it will be down to 2 lanes anyway, I'm not sure that you'll end up with much if any push back from the people immediately affected by the change.

Crescent Heights stop - There are destinations there (including a high school) and only are going to be more going forward, there is no reason to treat this line any differently than the rest. The assumption that seems to be made here is that everyone's destination is downtown, what about the people travelling from the SE to Crescent Heights or the reverse? Given that this line will travel by the major industrial areas in the city, it's going to be a valuable resource for those people that work in that area.

Elevated - Ah no, one thing that you almost never see under an elevated track is active uses, I would take at grade over elevated, clearly buried would be ideal.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #7870  
Old Posted Mar 13, 2014, 4:09 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by Chadillaccc View Post
What needs to happen is both subways under construction by 2020, both Eighth Avenue and 2nd Street Subways done by 2023 or 2024. Then build out the suburban 203 line from there, with completion from Quarry Park to Mcknight in the first phase around 2027 or 2028.
If the other levels of government can get off their fat @##$% and start putting our tax dollars to work for us were we live, this can happen right away (<10 years). The issues is that Calgary is not a swing voting area (sure things shouldn't work this way) so we don't get these sort of massive projects funded in a single round.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #7871  
Old Posted Mar 13, 2014, 4:14 PM
Bassic Lab Bassic Lab is offline
Registered User
 
Join Date: Oct 2005
Location: Calgary
Posts: 1,934
Quote:
Originally Posted by MasterG View Post
Agreed. You are going to see more and more people shift to walking and cycling within 5 km of the core. It is the only way to pack more people down there in the absence of serious commitment for transit from other levels of government, akin to how committed the province is to building the Ring Roads. Serious, multi-billion, multi-year transit funding is the only source.

While we are waiting for that (i.e. forever), I am happy on my bike and feet
The 8 Ave subway with a concurrent boost in the size of the LRT fleet is by far the cheapest method of significantly increasing total transportation capacity into the core. With current levels of funding, the city could easily afford to do it by the early 2020s. Remaining bus capacity into the core, increased with bus lanes, and four car trains should provide enough capacity until then. It just requires delaying the Green Line.
     
     
  #7872  
Old Posted Mar 13, 2014, 4:31 PM
O-tacular's Avatar
O-tacular O-tacular is offline
Fake News
 
Join Date: Jul 2008
Location: Calgary
Posts: 26,067
Quote:
Originally Posted by VIce View Post
Being only 25% larger after 20 years is an annual growth of less one percent... even with a slowdown at 2-3% growth, you're looking at a doubling in that timeframe.
Well that makes my case even stronger. I was trying to be conservative, but you're right we'll probably be closer to 2 million by then. Boggles the mind considering it felt like it took forever for us to reach 1 million...
     
     
  #7873  
Old Posted Mar 13, 2014, 4:33 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,597
Quote:
Originally Posted by Full Mountain View Post
If the other levels of government can get off their fat @##$% and start putting our tax dollars to work for us were we live, this can happen right away (<10 years). The issues is that Calgary is not a swing voting area (sure things shouldn't work this way) so we don't get these sort of massive projects funded in a single round.
When the province needs LRT, roads, hospitals, schools, seniors homes, all in record number, and we already spend 3 times the national average per capita on public infrastructure, much more spending and you reach the point where everything costs more but you don't end up with much more production.

It is frustrating to high hell for sure. Can't meet the demands for everyone at the same time in the short term or even medium term.
     
     
  #7874  
Old Posted Mar 13, 2014, 4:42 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by MalcolmTucker View Post
When the province needs LRT, roads, hospitals, schools, seniors homes, all in record number, and we already spend 3 times the national average per capita on public infrastructure, much more spending and you reach the point where everything costs more but you don't end up with much more production.

It is frustrating to high hell for sure. Can't meet the demands for everyone at the same time in the short term or even medium term.
This is less focused at the provincial government and more at the federal, they seem to forget about us, look at how much they sent to Toronto for a subway yet the same doesn't seem to be coming this direction. IMO this country needs to realize that the economic center has shifted and that public spending needs to keep pace with economic growth (now if we can cut of the gangrene limb that is Quebec... or maybe they'll do it themselves).
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #7875  
Old Posted Mar 13, 2014, 4:46 PM
O-tacular's Avatar
O-tacular O-tacular is offline
Fake News
 
Join Date: Jul 2008
Location: Calgary
Posts: 26,067
Quote:
Originally Posted by Full Mountain View Post
This is less focused at the provincial government and more at the federal, they seem to forget about us, look at how much they sent to Toronto for a subway yet the same doesn't seem to be coming this direction. IMO this country needs to realize that the economic center has shifted and that public spending needs to keep pace with economic growth (now if we can cut of the gangrene limb that is Quebec... or maybe they'll do it themselves).
Yep. We're the good ol' Conservative base, yet they only throw us crumbs. I guess they feel they can just count on our vote forever. Funny when I read your thing about the gangrene limb I was thinking more about the Federal Conservatives than Quebec.

Last edited by O-tacular; Mar 13, 2014 at 5:25 PM.
     
     
  #7876  
Old Posted Mar 13, 2014, 4:49 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,597
We don't miss out compared to others in federal funding, the funding level for everyone is just really low.
     
     
  #7877  
Old Posted Mar 13, 2014, 4:50 PM
Bassic Lab Bassic Lab is offline
Registered User
 
Join Date: Oct 2005
Location: Calgary
Posts: 1,934
Quote:
Originally Posted by Full Mountain View Post
To everyone, please go read the full reports before making your opinions up

Low Floor - From 16th north is planned as an in-street lrt, in the southern end (130th south) it will be a similar situation where the train runs beside the roadway. In both these situations it is far better to have a low floor system. Given the modal split on center is over over 60% public transit and only going to increase, not to mention that once the dedicated bus lanes go in it will be down to 2 lanes anyway, I'm not sure that you'll end up with much if any push back from the people immediately affected by the change.

Crescent Heights stop - There are destinations there (including a high school) and only are going to be more going forward, there is no reason to treat this line any differently than the rest. The assumption that seems to be made here is that everyone's destination is downtown, what about the people travelling from the SE to Crescent Heights or the reverse? Given that this line will travel by the major industrial areas in the city, it's going to be a valuable resource for those people that work in that area.

Elevated - Ah no, one thing that you almost never see under an elevated track is active uses, I would take at grade over elevated, clearly buried would be ideal.
130 Ave and south is three suburban stations on a SE portion that is entirely within a dedicated ROW. The difference between high floor and low floor is nominal for the SE.

The report suggesting at grade north of 16 Ave is the entire debate. It is deeply flawed, it arbitrarily gives additional points to at grade in various categories. This includes an instance where at grade is given additional points over underground for the portion north of Beddington Trail where both options follow the same at grade ROW in the median of Harvest Hills Boulevard. Basically the report was written so as to favour predetermined routes. Even still it notes that additional grade separation would be needed. It is hardly the final word on deciding that the NC LRT will run in street.

Turning Centre Street into 36 St NE but with half the traffic lanes will definitely cause a backlash and for good reason; it will hugely affect traffic and create a massive barrier between the east and west for vehicles and pedestrians.

Low floor systems involve 15% higher costs to vehicle maintenance and 20% higher costs for track maintenance. The vehicles are also generally more expensive. The designs of low floor vehicles involve real compromises that affect performance. Combine that with all of the synergies that a unified fleet allows and there is no reason to create a second low floor system in Calgary. Low floor systems might make sense in routes that swing closer to the streetcar end of the spectrum in cities that lack preexisting routes, which isn't Calgary, isn't the SE LRT, and shouldn't be the NC LRT.
     
     
  #7878  
Old Posted Mar 13, 2014, 4:51 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Quote:
Originally Posted by O-tacular View Post
Well that makes my case even stronger. I was trying to be conservative, but you're right we'll probably be closer to 2 million by then. Boggles the mind considering it felt like it took forever for us to reach 1 million...
Remains to be seen whether we'll be able to sustain historical rates of growth for the city proper, but a 2.7% growth rate over 20 years would bring us to 1,958,563 for the city proper in 2033.
     
     
  #7879  
Old Posted Mar 13, 2014, 4:55 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,597
The decision between underground north of 16th and at grade has to be a political one. If you can commit to taking all buses off the road, two lanes for LRT wouldn't be such a huge loss. And from a purely rational perspective, you will gain a lot more corridor capacity than is lost.

To make the judgement call that the loss of road capacity would scuttle the project from a public outcry perspective is not one consultants can or should make.
     
     
  #7880  
Old Posted Mar 13, 2014, 5:01 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by MalcolmTucker View Post
When the province needs LRT, roads, hospitals, schools, seniors homes, all in record number, and we already spend 3 times the national average per capita on public infrastructure, much more spending and you reach the point where everything costs more but you don't end up with much more production.

It is frustrating to high hell for sure. Can't meet the demands for everyone at the same time in the short term or even medium term.
How about not building $5B ring road sections and allowing for per capita primary health care systems rather than just fee for service (which 92% of primary care doctors use in Alberta)? Maybe try working on efficiency rather than just throwing money at problems.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:39 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.