HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Mar 8, 2014, 1:58 AM
Reignman Reignman is offline
Registered User
 
Join Date: Oct 2013
Posts: 302
Quote:
Originally Posted by Biff View Post
The south Perimeter is also getting its first phase of median widening from St Mary's east to Hwy 1 and possibly interchange grading at St Mary's, St Anne's and Waverley - approx $250 million.
Wow! First I have heard of this! I thought I heard the SW perimeter was getting upgraded first. When was this announced? Between the two traffic lights and the numerous median openings allowing direct left turns out of the passing lane, this is the worst section of the entire perimiter in my opinion.

Speaking of that particular stretch, has there ever been any talk of upgrading 59/100 interchange from parclo to full cloverleaf?

Last edited by Reignman; Mar 8, 2014 at 2:11 AM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 9:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.