Quote:
Originally Posted by Cirrus
You know why Denver is building commuter rail and light rail along its suburban corridors instead of a third-rail metro system like BART? Because the rest of the country has learned from BART's mistake
|
The rest of the country, IMO, seems not to have learned from what it did correctly. Granted the 3rd rail, aka NYC approach, and, granted the unique track gauge are NOT the best moves, but BART, as originally conceived was the only attempt to integrate a group of large urban centers. The major reason it failed to live up to expectations is simply that too many municipal governments pulled out of the deal, and, the true synergies that a fairly fast commuter train encircling the Bay would have realized.
Instead, virtually all systems built since have been hub and spoke, aka Chicago*, where virtually no interconnectivity built into the light rail/commuter rail layouts. And, like Chicago's hub and spoke system, little time effective interconnectivity has bean built BETWEEN spokes. This lack of inter spoke interconnectivity away from 1 urban station or via street running down a downtown street, IMO, has made most post WWII built transit systems an elaborate downtown development scheme, paid to a disturbing degree, by the suburbs.
Quote:
|
No, the proposal to extend BART to San Jose is exactly like the worst of RTD's planning. It's more about satisfying a political base than making an actually sensible transportation decision.
|
Much of the tragedy of this brilliant experiment lies in the great difference in the right-of-way laid out with the original municipal partners and the mess that has developed since. I am sure that the San Jose leg on the East Side of the Bay would have been laid out far differently in the 1960s than today. The area is far more built up and more freeway dominated.
And, I do agree with you that changes made to complete portions of regional transit systems years after original designs were thrown "out the window" are almost always worse the than original design.
We here in Denver can see this in the W line to the DUS light rail line interface (originally designed to be a 3 track setup) the DUS light rail station which originally was supposed to be right along commuter train platforms, the Commuter Station at DUS which was intended originally to be a through station, and, in the entire Boulder BRT/rail to Denver/rail to Longmont/BRT fiascos.
We know MORE, but HAVE'NT LEARNED MUCH.
*The DC subway is the curious exception