Quote:
Originally Posted by makr3trkr
Approximate population densities (various sources, most data from 2006-2009):
1,430/km² - UBC (permanent population only, that is, those who would be directly affected by a guideway)
2,330/km² - Point Grey
2,900/km² - Whalley
3,200/km² - Fleetwood
4,300/km² - Surrey City Centre
7,900/km² - Kitsilano
If Point Grey and the Endowment Lands deserve a subway, I don't see why the fine citizens in Surrey City Centre and Fleetwood shouldn't deserve one, too.
An elevated Skytrain down Fraser Highway would be smack in front of thousands of houses ... and would also undoubtedly cause massive traffic disruption.
And there are certainly beautiful parks like Green Timbers that would be 'scarred' by an elevated guideway.
|
You're forgetting a thing called employment density. More people work in the Broadway corridor than anywhere in Surrey. It's B.C's second largest employment region.
Also UBC's daytime population is quite high. I've heard around 40,000 people so yeah put that into your figures as well.
Surrey's deserves better bus service, then when it finally densifies and becomes the city it markets itself to be, maybe a subway or LRT. It's simply not there yet.
People from all over the region use the system in Vancouver because it is the cultural, entertainment, shopping, restaurant, tourist, beaches, parks mecca of Metro Vancouver. There's a lot of people using the system throughout and Broadway is beyond capacity right now. Underground isn't the only option, but we know that is the only palatable option for the west side of the city and so it should be.
Surrey is what? A suburb that funnels people into the city to use all the amenities it has. Then go back home.
In reality UBC should kick in some of the funds to get the line all the way there.
It's not a Surrey vs Vancouver thing. It's a reality thing. Build the subway in Van, then uses the buses normally deployed along Broadway and put them to work in Surrey.
Then once Surreyites stop using park and rides, we can talk about more LRT or maybe even a subway. There about 10 years away from that minimum. The Broadway line should have been built 20 years ago.