Agree with most of this, BRT as crosstown lines will suffice for a long time, and LRT to the airport is a bad way to go.
Don't think a western crescent line has to be all that cost prohibitive though, especially when it comes to ROW. Almost all of it is already city property.
Using Shaganappi ROW, from northland mall, to market, to ACH, foothills and across the river up to Sarcee.
Then down Sarcee ROW stoping at Sirocco and down to a new station/TOD/maint yard at signal hill.
Onward elevated over Glenmore with a stop for Grey Eagle development, before continuing on to MRU campus.
Continuing elevated eastward to Crowchild, south to Glenmore and over the reservoir and turning south at 14 St with a stop for Rocky View / Heritage Park.
Then south on 14th to a presumed combo LTR/flood relief tunnel under heritage drive, with an underground station linking to heritage on SLRT, and resurfacing for a hilltop deerfoot meadows station.
South again along Blackfoot, across deerfoot to future quarry west development and finally ending with a link across the river to the Quarry Park SELRT.
Lot's of elevated track for sure, and the flood tunnel makes or breaks the project IMO, but there really isn't much, if any private land acquisition required for this.
Question becomes, is linking all of those points to the rapid transit network worth the cost?
I think so
Quote:
Originally Posted by Bassic Lab
No other routes really make sense to even be in this conversation. I'm ignoring incremental improvements to various BRTs because they don't really entail major capital expenditures although some might be on the border of qualifying. 17 Ave E is likely decades away from the kind of growth that would justify it being added to the list. 16 Ave N could probably make due with bus lanes for a long time. The airport doesn't make any kind of sense except politically. An inner west side circumferential line, which I'm strongly in favour of, lacks a ROW that would keep costs below astronomical. Past that and ideas start getting really thin.
|