Quote:
Originally Posted by vegeta_skyline
Projects have been scooping up much of the available land in the entertainment district, is there really much land/big enough lots left for multiple 900 foot tall projects?
|
With empty lots? No. Anything industrial/office below 10 floors is available for demolition though (subject to OMB's interpretation of preservation rules). It would be a similar ratio to 88 Scott and Chaz old/replacements. The lot bounded by Pearl, Adelaide, Duncan, and Simcoe is one obvious site where you could put up 2 large towers; Duncan to John would be harder to consolidate but doable. The CBC building is another nearby site ready to go in the next 30 years as is the Toronto Hydro site (underground replacement in the basement?) behind 300 Front.
Mirvish towers are 10 to 15 years from completion so 30 years is relatively soon.
Quote:
|
But even if Mirvish gets built as is I doubt it will lead to a slew of 900ft giants there's only so much the market can support.
|
Mirvish buildings will be around for more than a few years. The market can support hundreds of 900ft buildings given enough time.
The statement was that Mirvish buildings only look good if they are taller than their surroundings. That means they've failed as the surroundings will eventually catch up and pass them.