Quote:
Originally Posted by ByeByeBaby
An interesting side note from the same document is the inner city transit plan:
Note that the south LRT was approved; the northwest LRT was approved with no construction date (there were serious community blowback from Hillhurst/Sunnyside especially). But look at the other three corridors; along Memorial drive east (i.e. the NE LRT), west along Bow Trail / 17th Ave (i.e. the current West LRT) - and the fifth leg is north along Edmonton Trail / Centre Street. Interesting, that the SE communities who claim they were "promised" the LRT don't actually have the older priority claim, and the NC LRT was promised earlier.
|
A version of the North Central line was part of the City's first ever rapid transit plan in 1967.