Quote:
Originally Posted by DizzyEdge
|
I'm wondering if it would work to have it elevated through that much residential. I could see a lot of opposition (noise, shadow, etc.). My current preference (it's changed many times) would be to have it underground to 41 ave and then pop up to grade at the park east of Centre, navigate the parks and schools east of Centre to 60 ave, expropriate the houses on the east side of Centre from 60 ave to Blackthorn Rd and then travel the east side of Centre all the way to Beddington Drive, expropriate the houses on the east side of Centre between Beddington Drive and Beddington Trail and then the middle of Harvest Hills the rest of the way. It would still be underground or off Centre in the areas most likely to densify.