Old Posted Jan 11, 2014, 2:21 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,439
by European and Asian standards, Canadian cities have Crapid Transit. I suggest this label, and we can all (homers and haters...I don't know what is worse) adopt it with pride.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
     
     
  #3522  
Old Posted Jan 11, 2014, 8:13 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Quote:
Originally Posted by J.OT13 View Post
Every few months, the same debate. Rapid Transit is a rail based, 100% grade separated urban transit system. It has nothing to do with speed (partly determined by distance between stations). As for frequency, it's determined by automation/technology (heavy rail usually have lower frequencies than lrt). Up to 90 seconds, but does not exclude systems running at 120seconds.
This kinds blew my mind - if Montréal's Metro doesn't run on rails (they're only there as a safety mechanism only in case a tire blows), is heavy-rail? Or is it BRT?

More importantly, I think it highlights how these definitions are kinda silly and the only important metrics are passenger experience (speed, station density, capacity, frequency, reliability [including grade separation insofar as it's relevant to this], etc.)
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #3523  
Old Posted Jan 11, 2014, 8:15 PM
Nouvellecosse's Avatar
Nouvellecosse Nouvellecosse is offline
Volatile Pacivist
 
Join Date: Aug 2005
Location: Nova Scotia
Posts: 11,312
To be clear, it does run on rails (like most rubbered-tyred metros), it just happens to be tires on rails rather than steel wheels on rails.

And of course, rails are simply a type of guideway to allow much longer vehicles to be used since without them such a long vehicle couldn't easily be controlled during turns. So even systems where the train doesn't run right "on" the rails, it still uses a fixed guideway such as side rails or a centre rail for the same purpose.
__________________
"The reasonable man adapts himself to the world; the unreasonable one persists in trying to adapt the world to himself. Therefore all progress depends on the unreasonable man." - George Bernard Shaw
Don't ask people not to debate a topic. Just stop making debatable assertions. Problem solved.
     
     
  #3524  
Old Posted Jan 11, 2014, 9:24 PM
Blader Blader is offline
Calgary Martindale
 
Join Date: Nov 2006
Location: Saskatoon-Toronto-Calgary
Posts: 889
What I see in this thread, is a classic case of failure to communicate, perhaps even willful.
In broad and loose strokes, when I refer to rapid transit with my friends and neighbors they understand. If I were to refer to Vancouver transit, specifically the SkyTrain, and call it automated guideway (AG) in APTA parlance they would be mystified and they're not dumb.

We all understand one another in this thread and yet there is an unwillingness to accept that language can be broad, loose, and universally understood, or defining and less understood, using definitions provided by a reputable source.

Last edited by Blader; Jan 11, 2014 at 10:28 PM. Reason: spelling
     
     
  #3525  
Old Posted Jan 12, 2014, 2:56 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Ok, I've found some pictures on the Metrolinx Flickr Feed as Well as the Tumbler Account of a one jacoblorinc, so you can see not only what is happening above Union Station but deep below and underground, under the station and tracks. They are building a retail concourse to relieve some of the crowding that occurs in the station at present. It's a huge station, but the concourse used for GO is rammed to capacity at most times, and especially during the rush hours from 3pm to 7 or 8pm it's difficult to get through the station, and sometimes even later when there is a game at the ACC the station can be clogged until 11pm which is pretty close to when operations shut down.



Courtesy Metrolinx

And Here take a look what is happening below ground



jacoblorinc on tumblr

This new area being dug from under the existing tracks and station will form the new concourse area with retail. It will allow for a massive increase in passenger capacity. Which of course is greatly needed due to massive overcrowding in the current system.

Here is the existing Go Concourse which will now sit above the new concourse which is being constructed deep underground. The current capacity of Union Station including the existing concourse is believed to be around 300,000 passengers a day. With the renovation that presently underway, the capacity of the Union Station Terminal will double to over 600,000 passengers per day. The scale of the project is impressive, and the time to construct it is also monumental, as it will likely not be completely finished until 2018 or at least 4 years from now.


from bobolink at flickr.com

This project, along with the Airport Rail Link, and the Eglinton Crosstown LRT (Underground Portion Runs Through Old City's of Toronto, York, and East York) are the most fascinating Toronto Transportation projects, and while there are others, such as the Spadina Subway Extention, New LRT vehicles, New Subways, the scale of these construction projects is impressive, and of course badly needed do the the capacity issues transit in Toronto is currently experiencing.
     
     
  #3526  
Old Posted Jan 12, 2014, 3:39 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,865
scheduled completion is 2015 IIRC. They want it done for the Pan Ams.

And somehow I have never noticed the ceiling of Union station being like that despite walking through there almost every day..
     
     
  #3527  
Old Posted Jan 12, 2014, 4:01 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
Quote:
Originally Posted by Innsertnamehere View Post
scheduled completion is 2015 IIRC. They want it done for the Pan Ams.

And somehow I have never noticed the ceiling of Union station being like that despite walking through there almost every day..
The Airport Rail link will be done by 2015, and that's the most important factor for the Pan Am Games which will be at that time.

The full station, second platform, retail concourse will not be complete until 2017 or 2018.
     
     
  #3528  
Old Posted Jan 12, 2014, 4:27 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Awesome Union update Cal. Sure is taking a long time, but it will be well worth it.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
     
     
  #3529  
Old Posted Jan 12, 2014, 4:40 AM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is offline
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 7,489
Quote:
Originally Posted by Innsertnamehere View Post
And somehow I have never noticed the ceiling of Union station being like that despite walking through there almost every day..
Me either.

The changes are most welcome and long overdue.
     
     
  #3530  
Old Posted Jan 12, 2014, 5:18 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,865
sorry, 2016. not 2018 though.

http://www.insidetoronto.com/news-story/...union-station-will-be-completed-by-2016/

The new York Concourse (essentially half of the project) is supposed to open sometime "in early 2014" to allow for reconstruction of the current Bay Concourse, so that is coming very soon. That is the underground space pictured in Cals update, which certainly looks far from completion but judging by how the workers are dressed were taken in the summer. (there is a giant hole in the side of Union station right now to allow access to the construction site, it would be very cold there in the winter)

edit: looks like the current concourse pic is quite old as well (not that it really matters, it looks pretty much exactly like that today) there are no PRESTO machines, they instead seem to have ticket validators (the green things by the pillars) and the current Tim Hortons is a Country Style! The Lids store is something else as well.


edit: just noticed the avatar posters, so from late 2009 or early 2010 I take it.

Last edited by Innsertnamehere; Jan 12, 2014 at 6:15 PM.
     
     
  #3531  
Old Posted Jan 12, 2014, 10:40 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
No problem Chad! What I posted here is just a penny on a Million, if you go to Metrolinx's Flick Page Here, you will see they have over 1000 photos of construction pictures of some pretty massive projects that are ongoing in the Toronto Area.

Yes, Insertnamehere, the pictures are old, but it looks the same today, just because the project is lagging, and will take a long time to complete. With the scale of the project, the delays and overruns, I don't have much faith in the scheduled completion date anyway.

Quote:
The big renovation, now in the fourth year of a six-year schedule, seeks to turn it into a bigger and more efficient transfer point. New underground concourses will give travelers on foot a cleaner, quicker route to where they are going. A new connection to the PATH network will help, too.

A new train, the Union-Pearson Express, will whisk travelers to and from the airport. A second subway platform will make connections to the TTC much better.

Union will become a true hub, with spokes going out in all directions in various modes. Passengers trains, GO buses, commuter trains, the airport train, the subway, the streetcar to the west (and, with luck, one day the east) harbourfront -- all will go through Union.

The growing foot traffic will flow in all directions, too -- to the sports stadiums, to the bank and office towers, to the new attractions of the waterfront, to the CN Tower and aquarium. Few cities are lucky enough to have so much, so close to their central transportation hub.
http://www.theglobeandmail.com/globe-deb...ealthy-height-obsession/article16124595/
     
     
  #3532  
Old Posted Jan 12, 2014, 1:51 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 26,220
Quote:
Originally Posted by Innsertnamehere View Post
scheduled completion is 2015 IIRC. They want it done for the Pan Ams.

And somehow I have never noticed the ceiling of Union station being like that despite walking through there almost every day..
Stop to admire the ceiling and you'll be trampled to death!
     
     
  #3533  
Old Posted Jan 12, 2014, 3:04 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,795
I still think it looks like they're building that big chamber in the Mines of Moria down there.
     
     
  #3534  
Old Posted Jan 12, 2014, 9:31 PM
miketoronto miketoronto is offline
Registered User
 
Join Date: Jul 2001
Location: Toronto, Ontario, Canada
Posts: 9,932
I had no idea London, Ontario started an express bus.
I am glad it is a success. But to start an express service on a half hour frequency is pretty pathetic. Why not go 15 min from the start?
__________________
Miketoronto
     
     
  #3535  
Old Posted Jan 12, 2014, 11:17 PM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,758
Quote:
Originally Posted by miketoronto View Post
I had no idea London, Ontario started an express bus.
I am glad it is a success. But to start an express service on a half hour frequency is pretty pathetic. Why not go 15 min from the start?
...because it's London, Ontario. This is the same transit system that put a Park and Ride about a 10 minute walk from downtown.
     
     
  #3536  
Old Posted Jan 12, 2014, 11:48 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,795
Some of Gatineau's Rapidbus routes show up like every three hours during the afternoon...
     
     
  #3537  
Old Posted Jan 12, 2014, 11:59 PM
miketoronto miketoronto is offline
Registered User
 
Join Date: Jul 2001
Location: Toronto, Ontario, Canada
Posts: 9,932
Quote:
Originally Posted by Beedok View Post
Some of Gatineau's Rapidbus routes show up like every three hours during the afternoon...
I hope Gatineau gets their Rapibus working properly.

I knew the Rapibus would have a lot of growing pains just by looking at the schedules for the feeder buses.
People are not going to enjoy transferring to feeders that operate every 20 to 30 minutes in peak, and 60 minutes off peak.
That is no way to introduce a transfer system, unless you have dedicated Rapibus trips which meet designated feeder bus departures.
__________________
Miketoronto
     
     
  #3538  
Old Posted Jan 13, 2014, 2:43 AM
GreaterMontréal's Avatar
GreaterMontréal GreaterMontréal is offline
Registered User
 
Join Date: Dec 2013
Posts: 4,628
Here is the plan for the Blue line extension.
http://www.amt.qc.ca/docs/appel/1000680_DEV01.pdf
page 5
     
     
  #3539  
Old Posted Jan 13, 2014, 3:15 AM
Rico Rommheim's Avatar
Rico Rommheim Rico Rommheim is offline
Look at me!
 
Join Date: Jun 2007
Location: City of Bagels
Posts: 13,921
Let's hope the blue line extension spurs on some densification projects to that god forsaken ugliness that is the urbanity of the north-east.
     
     
  #3540  
Old Posted Jan 13, 2014, 4:18 AM
GreaterMontréal's Avatar
GreaterMontréal GreaterMontréal is offline
Registered User
 
Join Date: Dec 2013
Posts: 4,628
Quote:
Originally Posted by Rico Rommheim View Post
Let's hope the blue line extension spurs on some densification projects to that god forsaken ugliness that is the urbanity of the north-east.
It will. And the yellow line extension will start right after. around 2020. in 2017, 25 trolleybus on St-Michel boul. right now, 40 000 daily ridership on St-Michel boul.



[url]http://www.stm.info/fr/a-propos/grands-projets/electrification-du-reseau-de-surface[/url

there is also iBUS, later in 2014.

Last edited by GreaterMontréal; Jan 13, 2014 at 4:34 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 2:28 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.