Quote:
Originally Posted by canabiz
I thought the number of firm sale would be more than that. This one is in a prime location and it doesn't hurt to have the Groupe Germain operating the hotel. I know the Marnie Bennett group heavily promoted this project.
Is 75% sold still required before they break ground? Or Is Broccolini big enough to start construction a bit earlier?
I checked MLS and there are currently 37 units in this project for sale from the Marnie Bennett Realty Shop.
|
I should have prefaced that by saying the report I get is basically compiled by a company (PMA Brethour) which sends people out to the sales offices of all the builders - the data is not really the most reliable. The # does seem a little low. I will report back when I get the December month end report which should be soon.
Quote:
Originally Posted by JackBauer24
That depends on your definition of Winter 2015. I'm guessing they mean Dec. 2015, not Jan/Feb 2015. Assuming they break ground in the next few months, that would give them slightly less than 2 years to build this project - definitely doable.
|
Ah ha. I stand corrected. I would have called that Winter/2016 though!
Quote:
Originally Posted by gjhall
I'm thinking that from a financing perspective it should be able to start construction with fewer condo sales than usual because from a GFA standpoint, the hotel portion is 100% sold to Germain Groupe, right? That pushes the whole 'sold' proportion of the constructed building way up.
|
That's correct - most lenders are not looking solely at the % of units sold, but rather the % of sold revenue against loan dollars.