Quote:
Originally Posted by StethJeff
How fast do concrete pours usually go? I'm assuming a floor every 4 days is very fast.
|
There is a 280-unit, 12-13 floor building under construction across the street from our apartment in DC and they are building about 1.5 floors per week. I am very impressed at their productivity. Admittedly, a 12-story box has a lot less engineering than the Wilshire Grand will.