[email protected]
"Please be advised that the following are now complete, as part of the South Fraser Perimeter Road Project:
* Deltaport Way between west of 57B Street and Highway 17 - Phase 4
* Road work and construction resulting in lane shifts
* Highway 99 between 72 Street and 64 Street
* Road work and construction resulting north and southbound lane closures
* North and Southbound Nordel Way at Weigh Scales Access
* Road work and construction resulting north and southbound lane closures
* Vicinity of Timberland Road and Tannery Road
* Road work and utility installations resulting in single-lane alternating traffic
* Old Yale Road at Bridge Road
* Road work, construction, and paving resulting in single-lane alternating traffic
* Grace Road at SFPR
* Utility works and construction resulting in the closure of the intersection
* 115 Avenue/King Road between 132A Street and 139A Street
* Utility installations, road works, and wall construction resulting in single-lane alternating traffic
* 129 Street between 116 Avenue and 116A Avenue
* Construction and utility installations resulting in single-lane alternating traffic
* 130 Street North of 116A Avenue
* Utility installations and road works resulting in single-lane alternating traffic
* Highway 17 between 56 Street and Deltaport Way
* Construction and road works resulting in north and southbound lane closures
* 57B Street at Deltaport Way
* Road work and construction resulting in a full closure and detour
* Highway 91 Connector at River Road
* Paving and utility installations resulting in single-lane alternating traffic
* Knudson Road at River Road
* Wall construction resulting in a lane shift
* Timberland Road west of Tannery Road
* Utility installations resulting in a lane shift
* Bridgeview Drive between 115 Avenue and 116A Avenue
* Road works and construction resulting in single-lane alternating traffic
* Industrial Road/116 Avenue between 112 Avenue and 129 Street
* Road work and construction resulting in single-lane alternating traffic"