Quote:
Originally Posted by wong21fr
How many commuter trips are done each day on I-70? Take that number versus the number of passengers who will take a train to nowhere and you'll what should be prioritized. I don't pretend to think that the cost-benefit would even remotely favor the rail concept that the Front Range HSR is going with and as soon as it came out that Denver would be circumvented the whole vision became DOA.
Fix the highway and build a conventional commuter rail to Fort Collins. That's where we have to start.
|
Agreed- the last 10 or so posts here have been a stern lesson in reality orientation.
The low buck solution for conventional commuter transportation is to use the very straight, extremely easy to upgrade to 79 mph rail line (and 110 for that matter), that follows the South Platte to Greeley. * From there, there is poor to fair track on good right of way that goes from Greeley through Windsor to Fort Collins.
I suspect that such a package with UP trains using the line between 12:00a and 5:00a might cost under $200 million. An average speed of 55-60 mph would be doable, with possible stops at Brighton, Ft Lupton, Greeley, Windsor, and, Ft Collins. A morning commute from Brighton to DUS would take 20 minutes, from Greeley 1 hour, and from Ft Collins, 1hr 30 minutes.
At 110 mph top speeds, I suspect the average speed could increase to 75 mph, and, 5 to 10 minutes could be shaved off times.
Another low buck transportation improvement would be extending the 120x bus north, and, building diamond shaped tunnel on and off ramps (quadrupling the type of setup now at 120th). I suspect that including park and rides at new stations at, maybe 136th Ave and 168th might cost a total of $150 million.
This is called picking what's left of the low handing fruit.
*Following I-25 North on new right of way IMO would cost somewhere around $30 to $60 million per mile, or about 10X as expensive as improving existing line.