  #3021  
Old Posted Dec 17, 2013, 9:40 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,301
They could've installed toll gantries maybe just west of 200 St. and then between Hastings and Rupert, then all ramps in between, and then figured that say car A got on the highway at this interchange and got off at that interchange and drove so and so kms, or car B drove the entire length of the new highway, and then calculated a toll of 10 cents a km.

Hwy 17 doesn't need to be tolled though. Vancouver area ports need to be competitive.
     
     
  #3022  
Old Posted Dec 17, 2013, 10:58 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,126
Quote:
Originally Posted by tybuilding View Post
I agree, toll it. We need to have more sections of tolled highway. Highway 1 in Burnaby should have been tolled along with the new section in Surrey/Langley. In Europe when I drove on the toll highway in Italy I entered a tolled section with a toll on the on-ramp and then the off ramps. $2.2 Billion was spent outside of the bridge crossing yet only the $800 million bridge is tolled. Many benefit from the highway expansion but only those crossing the bridge pay.

This is why GPS road pricing would be great to have.
Fair enough, but then 100% of the money collected for tolls should stay in the areas collecting the tolls. So for example, if the tolls on all the "new" highways happen to be out in the burbs aka New West, Coquitlam, Langley, Surrey, etc., and we have to pay a toll, then 0 of that money should go to any infrastructure in Vancouver, Burnaby, North Vancouver, etc.

$0.

Then I'd be ok with tolling all our new stuff. If that isn't good, then it has to stick to the way it is now, toll the infrastructure only to pay off the infrastructure only.

Besides, it's not true that only the people driving the bridge pay. We all pay. The money for the highway comes out of the gas tax and other taxes we all pay for the 'honor' of owning a car. The people driving across the bridge pay twice, through taxes for the highway and through the toll for the bridge.

So it does actually work out fairly right now in that sense. The big beef is that we've built a lot of infrastructure in recent years and only the major crossings out to South of the Fraser seem to get tolls and that's what is 🞵🞵🞵🞵🞵🞵🞵 people off and bringing up the "Toll everything!" topic.
     
     
  #3023  
Old Posted Dec 18, 2013, 5:30 AM
dharper dharper is offline
Registered User
 
Join Date: Jun 2010
Location: North Surrey
Posts: 294
Does anyone know when the entire length of the SFPR will open? Last week it sounded like anytime between Monday(Dec 16) and Jan 1.
     
     
  #3024  
Old Posted Dec 18, 2013, 5:38 AM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
Quote:
Originally Posted by dharper View Post
Does anyone know when the entire length of the SFPR will open? Last week it sounded like anytime between Monday(Dec 16) and Jan 1.
Nothing concrete yet, but "before Christmas" has been floated around.

Separately, the Construction Bulletins have all "closures" for this week being "Sunday to Thursday" Could we potentially see a Friday opening?

http://www.sfprconstruction.ca/database/...13_Dec_21_2013_REV00_sub_Dec_11_2013.pdf
     
     
  #3025  
Old Posted Dec 18, 2013, 8:28 AM
Flash604 Flash604 is offline
Registered User
 
Join Date: Jul 2011
Posts: 53
Quote:
Originally Posted by go_leafs_go02 View Post
Nothing concrete yet, but "before Christmas" has been floated around.

Separately, the Construction Bulletins have all "closures" for this week being "Sunday to Thursday" Could we potentially see a Friday opening?

http://www.sfprconstruction.ca/database/...13_Dec_21_2013_REV00_sub_Dec_11_2013.pdf
The Minister of Transport promised by Christmas this past weekend.
     
     
  #3026  
Old Posted Dec 18, 2013, 3:25 PM
VanCvl VanCvl is offline
Registered User
 
Join Date: Mar 2009
Posts: 99
The official opening will be on Saturday between River Road and Hwy 99. Btw, the new Hwy 17A on and off ramps and now open too.
     
     
  #3027  
Old Posted Dec 18, 2013, 5:30 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,301
Saturday? Where did you get this?
     
     
  #3028  
Old Posted Dec 18, 2013, 5:39 PM
c041v c041v is offline
Registered User
 
Join Date: Feb 2010
Posts: 37
Quote:
Originally Posted by DKaz View Post
Saturday? Where did you get this?
A reliable source. He speaks the truth.
     
     
  #3029  
Old Posted Dec 18, 2013, 6:02 PM
Flash604 Flash604 is offline
Registered User
 
Join Date: Jul 2011
Posts: 53
Quote:
Originally Posted by VanCvl View Post
The official opening will be on Saturday between River Road and Hwy 99. Btw, the new Hwy 17A on and off ramps and now open too.
If they would just update that this has been done on the website, I'll get them open in Google Maps.
     
     
  #3030  
Old Posted Dec 18, 2013, 6:15 PM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
Quote:
Originally Posted by VanCvl View Post
The official opening will be on Saturday between River Road and Hwy 99.
And Tannery/Old Yale/124th?
     
     
  #3031  
Old Posted Dec 18, 2013, 6:25 PM
go_leafs_go02 go_leafs_go02 is offline
Registered User
 
Join Date: Dec 2007
Location: London, ON
Posts: 2,406
Quote:
Originally Posted by makr3trkr View Post
And Tannery/Old Yale/124th?
I'm assuming so. The whole thing will be open end to end as of Saturday.

I think the first phase in Surrey also opened up on a Saturday morning in December 2012.
     
     
  #3032  
Old Posted Dec 18, 2013, 6:33 PM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
Video of Ladner section driving:

www.vancouversun.com/Closures+detours+during+final+stages+South+Fraser+Perimeter+Road/9293906/story.html



It's difficult to watch that and not think that 80km/hr is set artificially low.

You're going to have some trucks doing 75ish to stay under the limit, and other trucks doing 110ish.

The upper levels has bikes on the shoulder, challenging grades, narrow medians, and winding curves, and the limit is 90km/hr.

Highway 91 has a stoplight and the limit is still 90km/hr.

Last edited by makr3trkr; Dec 18, 2013 at 6:45 PM.
     
     
  #3033  
Old Posted Dec 18, 2013, 6:50 PM
malabrat malabrat is offline
Registered User
 
Join Date: Oct 2010
Posts: 23
Yes it does seem odd that the new highway 17 section is 80. It should be at least 90. Its freeway standard - better standard than old 17A and its speed limited is 90 with a light. Makes no sense at all
     
     
  #3034  
Old Posted Dec 18, 2013, 8:29 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,218
Quote:
Originally Posted by tybuilding View Post
I agree, toll it. We need to have more sections of tolled highway. Highway 1 in Burnaby should have been tolled along with the new section in Surrey/Langley. In Europe when I drove on the toll highway in Italy I entered a tolled section with a toll on the on-ramp and then the off ramps. $2.2 Billion was spent outside of the bridge crossing yet only the $800 million bridge is tolled. Many benefit from the highway expansion but only those crossing the bridge pay.

This is why GPS road pricing would be great to have.
I'm pretty sure your numbers are grossly inaccurate. The bridge is the bulk of the cost, probably about $2 Billion of it. The remainder is the highway upgrades. A lane km of freeway isn't that expensive. Usually between $5-15M.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #3035  
Old Posted Dec 18, 2013, 8:38 PM
Flash604 Flash604 is offline
Registered User
 
Join Date: Jul 2011
Posts: 53
Quote:
Originally Posted by Alex Mackinnon View Post
I'm pretty sure your numbers are grossly inaccurate. The bridge is the bulk of the cost, probably about $2 Billion of it. The remainder is the highway upgrades. A lane km of freeway isn't that expensive. Usually between $5-15M.
You are both going too far on the extremes. The official word is that the bridge was half the cost of the project.

Whether we agree or not, the explanation of why they did the tolling in the manner the did was given long ago at http://www.pmh1project.com/tolling/Pages/About-Tolling.aspx. While I'd prefer to see a by the mile toll, I can understand the "if you toll the entire thing, you'll end up with highway traffic on local roads as people try to avoid the toll" argument.
     
     
  #3036  
Old Posted Dec 18, 2013, 8:50 PM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
Quote:
Originally Posted by Flash604 View Post
You are both going too far on the extremes. The official word is that the bridge was half the cost of the project.
If it was 50/50, that would give about 1.23 billion for the bridge and approaches, which makes sense, considering the rest of the project included complex retrofit/demolition/construction of 30-40 other bridges/flyovers on an active highway and the Surrey side got four additional lanes, not two.

The SFPR is 1.26 billion, also for just under 40km (albeit with fewer bridges/overpasses), so that dovetails nicely, even if only coincidental.
     
     
  #3037  
Old Posted Dec 18, 2013, 10:44 PM
Mousey Mousey is offline
Registered User
 
Join Date: Jun 2011
Location: Vancouver
Posts: 110
Have a question for anyone who might know.
My commute takes me from North Delta (Hwy 91 @ 64th) to Coquitlam (Westwood @ Lougheed)
I usually just go 64th-152-hwy 1-hwy 7. It takes about 40 minutes in the morning. (You catch the green wave from scott rd @ 64 pretty much all the way to hwy 1)
I was thinking one of two things. When 17 is wide open it will take a substantial amount of trucks off of hwy 91/91a. Is anyone thinking that hwy 91 in the morning will now see a considerably less amount of traffic? Or would taking hwy 17 all the way to Hwy 1 be a faster alternative?
In light traffic, from my house to Coquitlam Centre via 91/91a/columbia/brunette/1/7 takes only 30 minutes. Not complaining about 40 minutes in the morning, but I would like to avoid a $6 toll everyday starting Jan. 1st.
     
     
  #3038  
Old Posted Dec 18, 2013, 11:17 PM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
Quote:
Originally Posted by Mousey View Post
Have a question for anyone who might know.
My commute takes me from North Delta (Hwy 91 @ 64th) to Coquitlam (Westwood @ Lougheed)
I usually just go 64th-152-hwy 1-hwy 7. It takes about 40 minutes in the morning. (You catch the green wave from scott rd @ 64 pretty much all the way to hwy 1)
I was thinking one of two things. When 17 is wide open it will take a substantial amount of trucks off of hwy 91/91a. Is anyone thinking that hwy 91 in the morning will now see a considerably less amount of traffic? Or would taking hwy 17 all the way to Hwy 1 be a faster alternative?
In light traffic, from my house to Coquitlam Centre via 91/91a/columbia/brunette/1/7 takes only 30 minutes. Not complaining about 40 minutes in the morning, but I would like to avoid a $6 toll everyday starting Jan. 1st.
Alex Fraser Bridge and especially Queensborough are wildcards. Some days can be light, other days can be backed up to Hwy 10, so I would check Google Maps/MoT webcams before you leave.

Also, I like TomTom traffic:
http://www.tomtom.com/livetraffic/

While traffic might be lighter on Highway 91 northbound because of people exiting onto the Nordel connector, there will also be more vehicles entering from the Nordel connector, so I think it will be a wash.
     
     
  #3039  
Old Posted Dec 19, 2013, 1:05 AM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593


http://www.southdeltaleader.com/news/236248601.html

The South Fraser Perimeter Road was almost bare on Monday morning even as Highway 17A was a parking lot from the Highway 99 overpass to Tsawwassen

Delta's top engineer blamed traffic woes in South Delta yesterday on poor signage in advance of the shutdown of Highway 17A to complete construction for the new South Fraser Perimeter Road project.

"They looked at many different ways of undertaking that construction and they found the only way to do it was to actually completely close the highway," said Lan, adding staff reviewed the plan and highlighted the need to continue to move traffic smoothly.

"Certainly, the end result today was it did not work well."

Normal traffic patterns both north and southbound on Highway 17A are expected to be seen by Friday, while the SFPR is still slated to open before Christmas. The SFPR will remain fully open after Friday between 28th Avenue and Highway 99.

=====

SFPR is a huge improvement over River Road (also 80km/hr). Consider Highway 17 was 112 km/hr when it opened, and how much vehicle safety has improved. The 80km/hr limit is baffling.
     
     
  #3040  
Old Posted Dec 19, 2013, 2:11 AM
logicbomb logicbomb is online now
Joshua B.
 
Join Date: Sep 2010
Posts: 1,246
Quote:
Originally Posted by makr3trkr View Post
SFPR is a huge improvement over River Road (also 80km/hr). Consider Highway 17 was 112 km/hr when it opened, and how much vehicle safety has improved. The 80km/hr limit is baffling.
No it isn't.



It won't be tolled, you'll just be ticketed. No public outrage, but 500% more revenue. That 50km/hr portion under the Patullo is pretty damn harsh.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:01 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.