Quote:
Originally Posted by jsbertram
Looking at that rendering, I'm wondering why they don't extend the 'stub tracks' just two more segments, which will need to be done anyhow when the 'poco platform' is built.
For a few years (or decades) there would then be room to use those tracks for storing a few trains between rush-hours instead of dead-heading them back to the OMC overnight.
Or have a few spare trains ready to use in the daytime - but not taking up revenue tracks or platform space.
|
Probably because the project includes a new vehicle storage facility nearby at Falcon and storage track at Moody Centre.
Quote:
Originally Posted by nname
There's actually quite a few options... Lets say if we number the platforms from N to S as 1-4:
1. Run the entire Evergreen Line on the "wrong side" of the track from Lafarge to Lougheed, while running the PoCo branch on the "right side". Platform 1: Lafarge, 2-3 VCC, 4 PoCo
2. Build a cross-over west of Coquitlam Station for the eastbound train to go onto the north track. The Lafarge branch will run on the "wrong side" to the end. Platform 1: Lafarge, 2-3 VCC, 4 PoCo
3. Single-track or use a shuttle train for the Lafarge branch. Platform 1: Unused, 2 Lafarge/VCC, 3 VCC, 4 PoCo
4. Single-track or use a shuttle train for the PoCo branch. Platform 1: VCC, 2 Lafarge, 3 PoCo/VCC, 4 Unused
5. By-pass Coquitlam Station for the PoCo branch, so no platform 3-4 needed. Transfer need to be done at Inlet Centre/Falcoln
6. Run both lines normally, but have sign at the concourse to tell people which platform the train will depart first. They do this in Hong Kong. Platform 1: VCC, 2 Lafarge, 3 VCC, 4 PoCo
|
Thought about those, but for #1, there's a long segment of head-on conflict near and through future Falcon Station (so one platform at Falcon would be unused).
For #2, I assumed that they wouldn't add a switch later (since they are going to the trouble of adding the switches and stub track anyways, why go halfway?
For #3 and #4 make sense - having a shuttle - but it's such a short segment for a shuttle (but that could mean high frequency).
For #5, that's not good for Coquitlam City Centre.
For 3, 4 or 5, they could do a short-turn from Coquitlam or PoCo to Moody Centre where there is a storage track. I could see the short turn to Coquitlam and Coquitlam being a stub longer than PoCo (whihch more logically leads to Maple Ridge than a more northerly route).
For #6, I've seen that, but if you don't have enough time to get to the platform, you can still be stuck and have to switch platforms.
Quote:
Originally Posted by nname
And this is what I gather from Appendix I - the potential track map for the line! This document is even older though (dated 2011) - it still have Cameron station, so I just put it in!

Note: VSF = Vehicle Storage Facility... it is actually just lots of parallel tracks
|