November 29, 2013
- The new roof on the north stands is almost complete.
- Footings are being dug for a new pedestrian bridge on the east end of the stadium that will span from the main concourse to the berm.
- At the south stands, work is underway to form and build the base for the seating bowl at the front of the stands.
- Work continues to assemble the Veil that wraps around the stands.
- Work continues inside the stands to install all the drywall, electrical and plumbing. At the service level, office spaces have been built and some of the walls have been painted.
A worker is lifted to the top of the Veil behind the South stands to adjust the brackets connecting the wooden structure to the stands
From the west end of the south stands, the new stairs are in place and the shape of the Veil is now apparent
The tower crane at the west end of the field was taken down last week. A new crane for the building construction in this location will replace it
At the front of the south stands, work is underway to build the field level seating bowl