Old Posted Oct 26, 2013, 6:08 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,117
And to answer the post on dredgeing and the Fraser being "shallower than the tunnel @ 11meters in some places.", yes. Yes they will dredge it deeper and all the way to the docks.

They only dredge it to 11 meters BECAUSE of the tunnel being at 12meters.
Reply With Quote
     
     
  #702  
Old Posted Oct 27, 2013, 2:37 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,518
Quote:
Originally Posted by tybuilding View Post
Are we really going to dredge the Fraser much deeper for the entire length from the mouth to the docks?
Yes.

See article here:

http://www.vancouversun.com/technology/F...eplaces+Massey+Tunnel/9044885/story.html

Quote:
Fraser port facility pushes for deeper dredging if bridge replaces Massey Tunnel
Extra depth would allow for fully loaded freighters, greater economic benefits, CEO says

By Kim Pemberton, Vancouver Sun
October 16, 2013

Surrey Fraser Docks is pushing for more shipping up the Fraser River once the Massey Tunnel is replaced by a new bridge, but the company estimates it would take approximately $200 million in a one-time capital cost to dredge an additional two metres of river depth to enable ships to load fully.

...

At the time of Clark’s announcement, Port Metro Vancouver CEO Robin Silvester said he supports the plan for a new bridge since it could reopen the river to deeper-draft vessels, but gave no indication if the federal Crown corporation would share in the cost.

According to Port Metro Vancouver’s website, the Fraser River requires annual maintenance dredging because, on average, the river deposits an estimated 3.5 million cubic metres of silt and sand within the shipping channel — enough to fill Rogers Arena.

Right now $11.2 million is spent annually to dredge the Fraser in order to maintain a navigational channel of 11.5 metres at its most shallow point. The annual dredging cost is paid by Port Metro Vancouver, which in turn collects harbour dues to help recoup that cost from the vessels using the Fraser.

Surrey Fraser Docks CEO Jeff Scott said by adding another two metres to the navigational channel, to a depth of 13.5 metres, the larger cargo vessels that already use the river could be fully loaded. Otherwise, he said, companies that want to fully load their vessels will use other ports in the Lower Mainland or the United States and bypass the Fraser entirely.

Scott said the one-time capital cost to dredge the extra two metres could be a co-venture between the public and private sectors. Presumably, the annual maintenance dredging would remain the same.

“I think it (dredging two additional metres) creates opportunities for growth and expansion up and down the Fraser River that could result in thousands of jobs and significant economic benefit,” said Scott. “Using the Fraser River as a marine highway adds flexibility. Right now we are underutilized as a terminal and B.C. jobs will go to other jurisdictions like Seattle, Tacoma or elsewhere.”

Scott said the river is dredged annually around May and June when the snow melts and silt and other debris are deposited into the Fraser.

Scott said improving the Fraser River as a marine highway would also take more trucks off the road. He gave the example of the Interfor sawmill, adjacent to Fraser Surrey Docks, that trucks all its lumber to Burrard Inlet, where larger ships can be filled to capacity.

...

The Massey tunnel is 11.6 metres tall and sits below the bottom of the river. The tidal assist allows deep sea vessels to pass over it. The depth of the Fraser River at the tunnel location is 11.9 metres at low water.

Under the current channel conditions the Fraser River can handle vessels that are 270 metres LOA (length overall), 32.2 metres beam, and 11.5 metres draft (with tidal assist). That translates to a vessel being fully loaded at 55,000 DWT (dead weight tonnage) and with the additional two metres of river depth, it could increase to a full load of 80,000 DWT.
Reply With Quote
     
     
  #703  
Old Posted Nov 8, 2013, 12:47 AM
tybuilding tybuilding is offline
Registered User
 
Join Date: Sep 2009
Posts: 898
If you needed any more proof the the BC Government is hell bent on sending our region to automobile sprawl hell this is it:

http://www.theglobeandmail.com/news/brit...ission-eyed-for-breakup/article15306864/

British Columbia’s “sacrosanct” Agricultural Land Commission will be effectively dismantled and the B.C. Oil and Gas Commission will assume new responsibilities for land use decisions if a proposal prepared for cabinet is adopted, according to confidential government documents.

Information obtained by The Globe and Mail shows that B.C. Agriculture Minister Pat Pimm is preparing to ask cabinet to endorse a plan to “modernize” the ALC, an independent Crown agency, which has overseen and protected about four million hectares of farmland for 40 years. Under the plan, the ALC – long a thorn in the side of developers who want to free up farmland – would move within the Ministry of Agriculture, apparently ending its autonomy from government.


What the heck you say? Oil and Gas commission will take on responsibilities for farmland in the South of Fraser that has no oil and gas. But they do have ravenous developers wanting to put in expanded ports for oil, gas and coal. Maybe its time to stop the BC Government from ruining our vision for Metro Vancouver.

Cheap land for sale. Pave Paradise, Put up a Parking Lot. Start with building a 10 lane highway, don't fund transit. Done
Reply With Quote
     
     
  #704  
Old Posted Nov 8, 2013, 2:17 AM
ryanmaccdn ryanmaccdn is offline
Registered User
 
Join Date: Sep 2008
Posts: 343
Quote:
Originally Posted by tybuilding View Post
If you needed any more proof the the BC Government is hell bent on sending our region to automobile sprawl hell this is it:

http://www.theglobeandmail.com/news/brit...ission-eyed-for-breakup/article15306864/

British Columbia’s “sacrosanct” Agricultural Land Commission will be effectively dismantled and the B.C. Oil and Gas Commission will assume new responsibilities for land use decisions if a proposal prepared for cabinet is adopted, according to confidential government documents.

Information obtained by The Globe and Mail shows that B.C. Agriculture Minister Pat Pimm is preparing to ask cabinet to endorse a plan to “modernize” the ALC, an independent Crown agency, which has overseen and protected about four million hectares of farmland for 40 years. Under the plan, the ALC – long a thorn in the side of developers who want to free up farmland – would move within the Ministry of Agriculture, apparently ending its autonomy from government.


What the heck you say? Oil and Gas commission will take on responsibilities for farmland in the South of Fraser that has no oil and gas. But they do have ravenous developers wanting to put in expanded ports for oil, gas and coal. Maybe its time to stop the BC Government from ruining our vision for Metro Vancouver.

Cheap land for sale. Pave Paradise, Put up a Parking Lot. Start with building a 10 lane highway, don't fund transit. Done
About time.... maybe we can start to really grow like a real city in North America. And also possibly decrease insane housing prices so people can actually live here.
Reply With Quote
     
     
  #705  
Old Posted Nov 8, 2013, 2:26 AM
Cypherus's Avatar
Cypherus Cypherus is online now
Registered User
 
Join Date: Jan 2007
Location: Surrey
Posts: 1,759
With this project expected to be completed by 2020, and the amount of discussion already, this is going to the the longest thread ever.
Reply With Quote
     
     
  #706  
Old Posted Nov 8, 2013, 2:27 AM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,428
Enough debating it. Lets build the 10 lane bridge already!!
Reply With Quote
     
     
  #707  
Old Posted Nov 8, 2013, 3:03 AM
spm2013 spm2013 is offline
More Towers
 
Join Date: Jan 2013
Posts: 2,312
Quote:
Originally Posted by tybuilding View Post
If you needed any more proof the the BC Government is hell bent on sending our region to automobile sprawl hell this is it:

http://www.theglobeandmail.com/news/brit...ission-eyed-for-breakup/article15306864/

British Columbia’s “sacrosanct” Agricultural Land Commission will be effectively dismantled and the B.C. Oil and Gas Commission will assume new responsibilities for land use decisions if a proposal prepared for cabinet is adopted, according to confidential government documents.

Information obtained by The Globe and Mail shows that B.C. Agriculture Minister Pat Pimm is preparing to ask cabinet to endorse a plan to “modernize” the ALC, an independent Crown agency, which has overseen and protected about four million hectares of farmland for 40 years. Under the plan, the ALC – long a thorn in the side of developers who want to free up farmland – would move within the Ministry of Agriculture, apparently ending its autonomy from government.


What the heck you say? Oil and Gas commission will take on responsibilities for farmland in the South of Fraser that has no oil and gas. But they do have ravenous developers wanting to put in expanded ports for oil, gas and coal. Maybe its time to stop the BC Government from ruining our vision for Metro Vancouver.

Cheap land for sale. Pave Paradise, Put up a Parking Lot. Start with building a 10 lane highway, don't fund transit. Done
You might actually try reading the documents before you muse about ALC being changed because of a new tunnel replacement.

From the "unofficial" document:

Quote:
3) Create two classes of ALR – one area will be status quo – this will be the Okanagan and Fraser Valley-Vancouver Island. The other area will cover the Interior, Kootenays and everything north of the Okanagan, where the rules will be “anything goes.”
http://www.theglobeandmail.com/news/brit...ultural-land-commission/article15322690/

So the idiots want to frack the gas. Vote for the NDP next time.
Reply With Quote
     
     
  #708  
Old Posted Nov 8, 2013, 4:20 AM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
Registered User
 
Join Date: Jan 2004
Location: White Rock, BC (Metro Vancouver)
Posts: 3,145
Quote:
Originally Posted by tybuilding View Post
If you needed any more proof the the BC Government is hell bent on sending our region to automobile sprawl hell this is it:

What the heck you say? Oil and Gas commission will take on responsibilities for farmland in the South of Fraser that has no oil and gas. But they do have ravenous developers wanting to put in expanded ports for oil, gas and coal. Maybe its time to stop the BC Government from ruining our vision
Man, you sound like one of those emotionally-driven, looney-left, greeny NDPers.

Ruining whose vision? Yours? It's ivory tower stuff.

It's just an internal discussion document - akin to when the 1990's BC NDP gov't hired Goldman Sachs to prepare a report to sell BC Rail. Yep.

That aside, the ALR was really brought in 1973 as Class 1 and 2 farmland was being eaten up for single-family residential subdivisions in Richmond, Delta, and Surrey. Right thereafter ALR, residential land values doubled overnight.

IMHO, too much land is included in the ALR - Class 4, 5 , 6 "farmland", which is essentially used for horse-grazing in areas such as Langley. Should be brought back into residential use to mitigate North America's highest housing prices. Not socially sustainable for horse grazing in this region.

BTW, the South Fraser does indeed have oil and gas. As a matter of fact, the streetlights in Steveston (Richmond) were lit by natural gas from locally-drilled wells. Even as recent as 1984, Canadian Hunter had a natural gas drilling program near Boundary Bay Airport. The capped wells are still there but the geology is complex - akin to the Bowser Basin in the Cariboo region with its complex geology but enormous potential.

Now back to regularly scheduled programming. Get on with the new GMB!
Reply With Quote
     
     
  #709  
Old Posted Nov 13, 2013, 2:24 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Quote:
Originally Posted by ClaytonA View Post
The Fraser River Rail Bridge was as high or a higher priority than the George Massey Tunnel on the Gateway planning documents. There were 5-7 high priority components IIRC. It’s too bad the http://www.gatewayprogram.bc.ca/ no longer exists, or I’d provide a link. I cannot find it elsewhere on the internet anymore either. ... This project is about the Port wanting deeper draft for shipping and ALR land speculation in Delta, White Rock, and probably at the margin in South Surrey (ie traffic commuting or light industrial warehouses).

...

It does need to be upgraded or replaced; there’s little controversy with that argument. The poll question was a poor one. There is controversy about allocation of resources given a timeframe or prioritization. A more illuminating question would be which transportation project (not just highway projects although there are several) would you prefer given a list? Or do you think the GMT should be done first before x, y, or z?
Found a link to planning documents:http://www.gvgc.org/pdf/SW1040_FinalReport_Revised2.pdf (fair bit here starting from 1998)

No idea if the list on page 42-43 (57-58) is ordinal (although they did use numbers); a new road and rail crossing at New West is listed above the George Massey Tunnel. Also note that they are asking for only 2 new lanes of capacity, so 10 lanes vs 6 means the land speculation comment still applies - that much new capacity isn't warranted.

Furthermore this report says the rail capacity will experience bottle-necking hurting competitiveness starting in 2015. Rail tonnage is forecast to increase by 70% versus 19% for long haul trucking (Table 5-1, pg 32 (46)). It doesn't name the reports, but claims that rail upgrades cannot preclude road upgrades since a mode shift (usage) of trucking to rail isn't significant. This seems counter-intuitive, is trucking faster - probably, cheaper - doubt it, socially cheaper - no (ie traffic accidents, use of finite labour pool, more land required), environmentally cheaper - no, constrained by capacity like rail - less likely with public versus private investment to relieve congestion. Each rail car equals 2 trucks off our highways, less highway and bridge maintenance, safer highways etc. Anecdotally there is much more long distance trucking than there was 10-15 years ago especially noticeable if you drive really early in the morning (before 5am) when they're often parked along the road in pullouts.

I concur with the local trucking and handling estimated at 50% (vs 19% long haul, 70% rail) along with population growth affecting the region's road network congestion and road upgrades being needed. Public highways and roads versus private railways; should government be investing in infrastructure for private railways? One wonders if cheaper rail investments for 20% more demand would give us more efficient use of resources while investing a bit less in roads, more in transit and land use changes (more density) could partially mitigate more expensive road investment? This report throws out the goals of the regional growth strategy or whatever it was called then by assuming the primary transportation mode for commuters will be SOV ie transit investment will be less than required and less likely to actually occur. Rail, transit, and road improvements need to be made, but to the degree of two of the widest bridges in the world?

Perhaps many of the rail improvements have been done too, just with less fanfare? Surely some of it has. It doesn't seem to be a priority though with the BC government/whomever basically dropped as a partner by ODOT and WSDOT on inter-city rail according to their planning documents. Build the bridge, but it doesn't need to be 10 lanes. Put the money we'd save into a need more pressing, like transit or rail.
Reply With Quote
     
     
  #710  
Old Posted Nov 13, 2013, 4:05 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,778
Quote:
Originally Posted by ClaytonA View Post
Perhaps many of the rail improvements have been done too, just with less fanfare? Surely some of it has.
For many years the single biggest bottleneck in BC was the single-line trackage for each of the CN and CP lines running through the Fraser Canyon. In 1999 the two railways agreed to allow the use of each other's tracks and all trains from both roads now run eastbound over CP's line and westbound over CN's line. I'm not sure of the exact impact, but I'm sure that at least doubled capacity through the region with next to nothing in infrastructure spending.
Reply With Quote
     
     
  #711  
Old Posted Nov 13, 2013, 5:42 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by ClaytonA View Post
No idea if the list on page 42-43 (57-58) is ordinal (although they did use numbers); a new road and rail crossing at New West is listed above the George Massey Tunnel.
That document is blocked at my work, but perhaps you can fill me in. That bridge is privately owned by BNSF, it is not a public asset. What excuse do the private rail companies have for neglecting that piece of infrastructure for 110 years, and what does that have to do with public transportation spending? Why would a private bridge be considered to be in competition for funding with public infrastructure like the George Massey project?

Quote:
Also note that they are asking for only 2 new lanes of capacity, so 10 lanes vs 6 means the land speculation comment still applies - that much new capacity isn't warranted.
I would speculate that any past requests for capacity increase were based on the premise that the existing tunnel would be expanded. If we can get past the decision that the tunnel is being replaced, then it makes absolutely no sense to build a new crossing at 6 lanes wide. The only real question is whether the 9th and 10th lanes are warranted.

Two of the north arm bridges will be next to reach end-of-life (Oak Street and Queensborough) and I don't for a minute believe that either of them will be replaced at less than 6 lanes' width. Queensborough itself was intended to be twinned in 1985 for the Alex Fraser, but that was cancelled at the last minute. So the question of "where will the traffic go?" is a temporary one that will be solved through the normal schedule of infrastructure replacement.
Reply With Quote
     
     
  #712  
Old Posted Nov 14, 2013, 2:28 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Quote:
Originally Posted by aberdeen5698 View Post
For many years the single biggest bottleneck in BC was the single-line trackage for each of the CN and CP lines running through the Fraser Canyon. In 1999 the two railways agreed to allow the use of each other's tracks and all trains from both roads now run eastbound over CP's line and westbound over CN's line. I'm not sure of the exact impact, but I'm sure that at least doubled capacity through the region with next to nothing in infrastructure spending.

Please kindly note that the date of the report is July 2003 and the 1999 agreement would have been taken into account. There have however, been other track sharing agreements in addition to that feted one you bring up including this one:http://www.bcmea.com/pdfs/304/CN.pdf
Reply With Quote
     
     
  #713  
Old Posted Nov 14, 2013, 2:57 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Quote:
Originally Posted by Zassk View Post
That document is blocked at my work, but perhaps you can fill me in. That bridge is privately owned by BNSF, it is not a public asset. What excuse do the private rail companies have for neglecting that piece of infrastructure for 110 years, and what does that have to do with public transportation spending? Why would a private bridge be considered to be in competition for funding with public infrastructure like the George Massey project?
This bridge was owned by the BC/federal government IIRC and then BC Rail who subsequently sold it to Southern Railways (or the government still owns it and Southern Railways operates it?) (http://www.newwestnewsleader.com/news/211586931.html. Basically we may have privatized it and have decided to subsidize truck transportation instead. I believe the BC/federal government has built several overpasses for roads over railways since this report. Here's a link to an 2010 RFP from Public Works Canada for a review:http://www.merx.com/English/SUPPLIER_Men...ge=&hcode=XQSP%2foyCIzIGqOXdEIPiuw%3d%3d

I guess there seems to be political will (ie funding) for the George Massey project when at least some of the transportation need could be addressed more cheaply, safely, and efficiently via rail than trucks. The rail network is pretty extensive too and also connects the same areas the George Massey does. This bridge needs to get built too. If we think of the transportation system holistically as multi-modal versus just as roads, then rail investments are also public goods. We invest in airports when all but one of the airlines is privately owned is another example.

Quote:
Originally Posted by Zassk View Post
I would speculate that any past requests for capacity increase were based on the premise that the existing tunnel would be expanded. If we can get past the decision that the tunnel is being replaced, then it makes absolutely no sense to build a new crossing at 6 lanes wide. The only real question is whether the 9th and 10th lanes are warranted.

Two of the north arm bridges will be next to reach end-of-life (Oak Street and Queensborough) and I don't for a minute believe that either of them will be replaced at less than 6 lanes' width. Queensborough itself was intended to be twinned in 1985 for the Alex Fraser, but that was cancelled at the last minute. So the question of "where will the traffic go?" is a temporary one that will be solved through the normal schedule of infrastructure replacement.
If the main reason isn't traffic congestion (land speculation), then why not 6 lanes plus 2 each way solely for trucks since rail is privatized and we want to address transportation needs via roads? I would expect that those bridges may be upgraded but would be somewhat surprised if they dramatically increase road capacity. Where does the traffic go once it's over the bridges? There is however an ALRT built over that arm of the Fraser providing downtown access. There are more important transportation needs than Oak Street and Queensborough bridges since for example they were listed as medium versus high priority, possibly things higher priority than the George Massey.
Reply With Quote
     
     
  #714  
Old Posted Nov 14, 2013, 3:25 AM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,585
Quote:
Originally Posted by ClaytonA View Post
...I guess there seems to be political will (ie funding) for the George Massey project when at least some of the transportation need could be addressed more cheaply, safely, and efficiently via rail than trucks. The rail network is pretty extensive too and also connects the same areas the George Massey does. This bridge needs to get built too. If we think of the transportation system holistically as multi-modal versus just as roads, then rail investments are also public goods. We invest in airports when all but one of the airlines is privately owned is another example.
Nobody ships small loads by rail anymore. Trucks are more efficient at doing that.

What airline isn't privately owned?
Reply With Quote
     
     
  #715  
Old Posted Nov 14, 2013, 4:41 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,778
Quote:
Originally Posted by whatnext View Post
What airline isn't privately owned?
Beats me. The one I thought of was, of course, Air Canada - but the federal government privatized it in 1988...

The RCAF is certainly government owned, and they do have scheduled passenger flights for armed forces personnel, some of which use public airports. Not what most would call an airline, thought.
Reply With Quote
     
     
  #716  
Old Posted Nov 14, 2013, 4:57 AM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,117
One side note you guys also have to remember is reports are NOT decisions. Reports are made by staffers or consultants to aid in directors (or politicians) in making their actual decisions. That doesn't mean they have to follow the report's findings to the letter or even at all.

The more political a decision maker or group are, the more they tend to deviate from report findings and more towards political will. So with that stated, it makes perfect sense that a report can come out saying X, Y, and Z are priorities and a politician decides that based on the region and political landscape, that bumping Z above X or putting A in front of X, Y, and Z will be the best.

At the end Z or even A probably do need to be done eventually so it isn't entirely unreasonable, and the politician things "Well regardless of what we pick, even if it is X that we pick that was listed as #1, we'll piss someone off."

Build Broadway first and you piss some people SoF. Build SoF stuff first and you piss people NoF. Build a new bridge in Metro Van and you annoy people in the Interior. Build a wider highway in the Cariboo and you annoy people in another region. That's part of being a politician. You will always piss someone or some group off regardless of what you decide. So many decisions are based on what will most likely benefit you the greatest politically combined with a little bit of magic 8 ball and rolling dice on the craps table.
Reply With Quote
     
     
  #717  
Old Posted Nov 14, 2013, 1:58 PM
moosejaw moosejaw is offline
Registered User
 
Join Date: Apr 2012
Location: Miami
Posts: 482
Quote:
Originally Posted by whatnext View Post
What airline isn't privately owned?
There are a lot of foreign government airlines esp in the middle east, asia, and eastern europe but none of a major carrier in North America
  • Finnair
  • Pakistan International Airlines
  • Czech Airlines
  • Emirates
  • Etihad Airways
  • Air New Zealand
Reply With Quote
     
     
  #718  
Old Posted Nov 22, 2013, 8:19 PM
makr3trkr makr3trkr is offline
Registered User
 
Join Date: Jun 2012
Posts: 593
http://www.vancouversun.com/news/South+F...open+before+Christmas/9201015/story.html

METRO VANCOUVER

[Minister of Transportation Todd] Stone announced that the 54-year-old George Massey Tunnel will be replaced with a bridge, which is in the design stage.

"One of the options is potentially a toll there," he said.

Its construction will start in 2017.

"If we want to provide rapid transit south of the Fraser, into Delta, we can't do it with the existing tunnel. So we plan to build a new bridge to improve access and drive time for motorists," Stone revealed.

"We're taking steps to ease congestion until then. In partnership with Surrey we're working on improving traffic flow across the border. We're also working with Surrey on a full interchange at Highway 99 and 16th Avenue."

Stone was applauded after telling his audience he sees the tolling issue is "an issue of fairness and equity for the hard-working people South of the Fraser."

B.C.'s tolling policy is over 10 years old, he noted.

"I will commit to everyone in this room that one of my goals high up on my to-do list is to bring forward British Columbia's tolling policy for a vigorous discussion and debate."
Reply With Quote
     
     
  #719  
Old Posted Nov 22, 2013, 8:31 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,778
Quote:
Originally Posted by makr3trkr View Post
http://www.vancouversun.com/news/South+F...open+before+Christmas/9201015/story.html"If we want to provide rapid transit south of the Fraser, into Delta, we can't do it with the existing tunnel. So we plan to build a new bridge to improve access and drive time for motorists," Stone revealed.
HA! Transit was a carrot for the Port Mann too, and the government provided ZERO funds for it. Translink was pretty much forced by the Provincial government to create a bus service over the Port Mann by finding "efficiencies" (code word for service cuts) elsewhere as a way to save face over their initial transit claims for the bridge. Don't hold your breath for any transit to be "provided" for this bridge, either. This is strictly road expansion and has nothing whatsoever to do with transit, no matter what they claim.
Reply With Quote
     
     
  #720  
Old Posted Nov 22, 2013, 10:39 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,201
Quote:
Originally Posted by aberdeen5698 View Post
HA! Transit was a carrot for the Port Mann too, and the government provided ZERO funds for it. Translink was pretty much forced by the Provincial government to create a bus service over the Port Mann by finding "efficiencies" (code word for service cuts) elsewhere as a way to save face over their initial transit claims for the bridge. Don't hold your breath for any transit to be "provided" for this bridge, either. This is strictly road expansion and has nothing whatsoever to do with transit, no matter what they claim.
On the upside, there's already many transit routes in the tunnel. They don't have to start from scratch like the Port Mann routes did.
__________________
"It's ok, I'm an engineer!" -Famous last words
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump