Quote:
Originally Posted by Baconboy007
I an article about all the troubles they have been having with unions being crummy to them so I get why it's taken a while. But, why are they doing such a hodgepodge job with it? I can see it from my window and it looks like not one floor is complete and random windows are missing.
|
Well I live just across the vine st expressway and the building is visible from my house. As each day passes more and more lights are on in the inside, and a quick look through the windows shows the inside basically finished. I think they want to finish the building while giving the appearance that much more work is to be done. This takes any edge away from the unions, as any completion horizon is ambiguous. This would be a good strategy, considering the unions' attempt at sabotage.
The importance of the well-being of this project cannot be overstated. It sends a message to the unions and developers alike: center city can survive without closed-shop projects. Remember that building on the main line in the 70's that was firebombed - its success ruined the unions' foothold in the burbs from that point on.
I will bet my bottom dollar that half of the building is already signed and leased. I think they want to finish with the majority of units leased.