In this Mojeda101 photo you can see a row of piles driven all along the edge of what I think is the footprint of the tower, taking up the upper left quarter of the lot, and they are pouring cement by those piles. Not sure if those piles will be a permanent part of the foundation or temporary support to stabilize the ground, but I suspect they are temporary support during startup that is left in place as the foundation is built out. Not sure if that qualifies as construction, and don't see any real caissons yet. I would think that they would have to put in some big caisson piles first before doing the "big pour."
Quote:
Originally Posted by Mojeda101
|