While there has been a lot of discussion on this forum about a hoped for downtown baseball stadium as well as aspirations for a high rise to be built in the downtown area, the actual construction projects which are taking place have received little conversation.
1. The County Line Rd. interchange has been discussed, however, we can't overlook that there was a major development planned at this interchange, before the 2008 economic crash, and some major project is likely to be built here as it is an ideal location in the growth corridor of the Huntsville area. The Huntsville Planning Commission has announced the zoning for the over 5,000 acres the City has annexed in Limestone County just west of County Line Rd. so significant development will be taking place in that area.
2. Possible Zeirdt Rd. interchange in the works? The Huntsville Times reports that Dale Strong has spoken with Federal officials about getting $20 million in funding to build an interchange at Zeirdt Rd. and I-565.
http://blog.al.com/breaking/2013/10/commission_chairman_dale_stron.html
With the widening of Zeirdt Rd. (which has crews on site now) and the Kellner Rd. project to begin soon through the Breland land where in 2006 DeBartolo Development announced plans for a $500 million mixed use project, this land is being prepped for something big - the County wouldn't have spent scare road resources if something weren't in the works and Strong indicates in the article he expects significant sales tax revenue for Madison County from development of this land.
Zeirdt Rd. is central to a lot of the Huntsville - Decatur area and an interchange there would allow easy access and a less than 10 minute drive to Huntsville's downtown and probably about a 15 minute drive to downtown Decatur, so it is easy to see how a major retail center could be built here. - When Belk was in discussion with the City of Huntsville over building their Bridge Street store, they indicated that they were looking also at a location along I-565 which led to speculation that the Zeirdt Rd. property wa where they were looking to build. Other retailers will find it attractive, too.
3. The widening of Jeff Rd. from just south of Capshaw Rd. (HSV City limits) to Douglas Rd. will accelerate the transformation of the Monrovia area from a semi-rural suburban area to a totally developed suburb. A five lane Jeff Rd. will ease the commute and the new Monrovia High School (funding is approved) will make this area more attractive for residential development. Another factor contributing to the nature of development in Monrovia is the Harvest-Monrovia Water Authority now requires all new subdivisions of 15 lots or more to be on a sewer line - This will lead to higher density neighborhoods as it will make economic sense for developers to put more and smaller lots on the land to get a higher return. When the homes were on septic tanks, they had to have bigger lots.
4. The widening of Winchester Rd. to Bell Factory Rd. will also lead to the further suburbanization of a semi-rural area of Madison County. While this area doesn't have the retail which the Madison- Monrovia are has, it does have pretty quick access to I-565 and is adjacent to the Chase Industrial Park. If the Harris Hill development at Moores Mill @ 72 were built, this area would definitely see more construction of housing.
The former "outer reaches" of the Huntsville - Madison County are now seeing an acceleration in their transformation from former farm land to fully developed suburbs.