Quote:
Originally Posted by UTPlanner
Regarding the project on 500 West, the application states that they are seeking demolition of structures. I'm not sure exactly which structure they are intending to demolish. I will try and get a better look at the file. When I was looking at the elevations it did not appear that the building on 500 West was being utilized in the design. It appeared to be all new construction to me.
|
This pisses me off, so many developers have such a lack of vision on how to incorporate old buildings into new developments. Image how cool that development would be if it was fully integrated into the Redman Building it would definitely be a more interesting and I think it would provide a more cohesive neighborhood, with both old and new together.
Quote:
Originally Posted by delts145
Agree, so I hope it's not just a bland 4 story box, but something special, given that location was once the Newhouse Hotel. That corner has been desperate for a project for decades now. It had better be worthwhile.
|
Actually Delts the Newhouse Hotel was on the SW corner of 400 S and Main, I believe the DA site is the NE corner of 500 S and Main.
I do like this location for the DA's office though, it makes sense to be right next door. I would hope that the building is at least 5 stories tall, taller would be nicer, but I don't see the county building something much taller than 4 or 5. They were pretty aggressive with the former 600 S design so maybe they will be at list a little aggressive with the design at this location. I wonder what the price was for this new location vs the price the will be able to sell the 600 S location for. I wonder if the LDS church gave them a good deal, to help jump start development in that area, and more development downtown in general?